• Title/Summary/Keyword: Work-In-Process

Search Result 8,663, Processing Time 0.032 seconds

A Study on the Productive Capacity Setting of Women's Jacket (여성 재킷의 생산능력 설정을 위한 연구)

  • Kim, Jin-Sun;Shim, Kyu-Nam;Oh, Soon
    • Fashion & Textile Research Journal
    • /
    • v.13 no.2
    • /
    • pp.269-278
    • /
    • 2011
  • This study aims at setting up productive capacity which can be usefully utilized for work management of apparel manufacturers. So as to achieve this goal, an apparel manufacturing company which has been operated by miniline system in Seoul was selected. Standard time and man-hour were calculated to create the accurate productive capacity by observing and measuring a work flow included cutting, sewing and finishing processes. And the result is as following. The standard time for each process was presented as cutting process 47004.5s, sewing process 671050.5s and finishing process 22426.3s. And 15284.4ms was computed as total procession man-hour per day of the manufacturer which is organized of 16 people. Also, the procession man-hour for each process was revealed as cutting process 396.7ms(2.6%), sewing process 14509.3ms(94.9%) and finishing process 378.5ms(2.5%). +Surplus was found in the productivity for each process included the cutting process(outshell, lining and seam process), the sewing process(preparation and arrangement process) and the finishing process. But, additional man-hour 52436.18ms was required because the productive capacity was calculated as -surplus(-13.9%) in the sewing process(part and assembly process). Therefore, a work schedule was planned based on the previous result. However, loading can be ideal when a capacity and a load become '0'. The object company should find the way to reduce allowance(26.25%) of the sewing process through reconstruction of consciousness and improvement in functions with analyzing works of operators. Also, they need to consider an additional supplement of the personnel.

A Study on Prototype of Just In Time Production Management System (적시생산 관리시스템에 관한 연구 - 철근공사를 중심으로 -)

  • Lee, Kyoo-Hyun;Choi, In-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.4 s.18
    • /
    • pp.153-164
    • /
    • 2005
  • This study aims at establishing JIT production management system to enable manage the resources input into from procurement through construction based on correct identification of the process, an analysis on the amount of input materials and information sharing. This study has focused on the process control and working process of rebar work in domestic apartment house construction where the overall scope of Process from the planning phase to the construction phase has been analyzed in this study. Also construction phase was selected for the application of a sample case. A basic model for JIT production was generated with these processes. Furthermore A questionnaire and the on-site survey with process, checklist and control data were prepared and performed for the application of JIT production management model into rebar work. The governing scopes of JIT production management system include process management, material management, yard loading and moving management and inventory control, and the operation of each control item

The deformation patterns of flange according to die geometry in the radial extrusion (레이디얼압출에서 금형구조에 따른 플렌지의 성형형태)

  • Ko, Byung-Do;Kang, Dong-myeung;Lee, Ha-Sung
    • Design & Manufacturing
    • /
    • v.2 no.1
    • /
    • pp.7-10
    • /
    • 2008
  • Restriking method is to add to process in order to get the correct size and high precision accuracy of product which is formed in pre-process. This method is widely used at bending work and drawing work. Restriking die is particularly design and used as restriking process is performed. Therefore, production cost is increasing as one process or a two process are added. In this paper, punches and die block of square shell drawing die which could be performed drawing work and restriking process by using only one die are designed in order to solve these factors. The structure of sectional die which can integrate drawing die and restriking die was developed.

  • PDF

Work Time of Basement Composite Wall Form Assembly by Work Time Analysis (작업분석을 통한 합벽거푸집 구성 요소별 작업소요시간에 관한 연구)

  • Heo, Kyoung-Moo;Kim, Myoung-Hyun;Kim, Tae-Hui;Kim, Jae-Yeob;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.9-13
    • /
    • 2009
  • Recently, construction in downtown is often done closely at the adjacent building. In this case, underground construction need to Basement Composite Wall(BCW) construction. However, generally, during the construction process of BCW form works have many problems that are narrow working space and inefficient time consuming. Despite of these problems, there was no quantitative research for the work time of BCM assembly. Therefore, in this study, work time of CBW form assembly in underground construction is identified by the work analysis. The results of this study reveal that buttress work of basement form take lots of time in the entire work process of Basement Composite Wall form assembly.

  • PDF

Treemapping Work-Sharing Relationships among Business Process Performers (트리맵을 이용한 비즈니스 프로세스 수행자간 업무공유 관계 시각화)

  • Ahn, Hyun;Kim, Kwanghoon Pio
    • Journal of Internet Computing and Services
    • /
    • v.17 no.4
    • /
    • pp.69-77
    • /
    • 2016
  • Recently, the importance of visual analytics has been recognized in the field of business intelligence. From the view of business intelligence, visual analytics aims for acquiring valuable insights for decision making by interactively visualizing a variety of business information. In this paper, we propose a treemap-based method for visualizing work-sharing relationships among business process performers. A work-sharing relationship is established between two performers who jointly participate in a specific activity of a business process and is an important factor for understanding organizational structures and behaviors in a process-centric organization. To this end, we design and implement a treemap-based visualization tool for representing work-sharing relationships as well as basic hierarchical information in business processes. Finally, we evaluate usefulness of the proposed visualization tool through an operational example using XPDL (XML Process Definition Language) process models.

Status quo Analysis on the Wearing Conditions of Working Clothes according to the Working Environment and Working Process -With reference to the Shipbuilding Industry Workers- (작업환경 및 공정에 따른 작업복 착의실태 분석 -조선업 근로자를 중심으로-)

  • Bae, Hyun-Sook;Park, Hye-Won;Park, Gin-Ah;Kim, Jie-Kwan
    • Fashion & Textile Research Journal
    • /
    • v.12 no.2
    • /
    • pp.203-213
    • /
    • 2010
  • This study examined the wearing conditions of working clothes of shipbuilding industry workers according to the working environmental factors and working process features. It was also investigated the relationship between the wearing sense of working clothes and the overall comfort according to work processes. In the working process of shipbuilding industry, the process of fitting, welding, grinding and painting were chosen by considering work environmental factors, disaster types, hazardous materials, work process features, working clothes and safety equipments of each work categorized. The workers of fitting process usually wore the standard working clothes, while more than 60% of the workers of welding, grinding and painting wore the specialized protective clothes. The hazardous work environmental factors such as noise, heavy dust, high temperature and noxious fumes affected to the workers of fitting, welding and grinding. However, the workers of painting were greatly damaged by organic solvent. The dissatisfaction with the wearing performance of working clothes was highly shown in the sweat absorbency, moisture permeability and body protection. In respect of the correlation between the overall comfort and the wearing sense of working clothes, the satisfaction was decreased in orders of movement comfort> sensual comfort> physiological comfort.

The Study on the Developing Process of BIM Modeling for Urban-life-housing Based on Unit Modular (유닛모듈러 기반 도시형 생활주택의 BIM 모델링 프로세스 개발 연구)

  • Lee, Chang-Jae;Lim, Seok-Ho
    • KIEAE Journal
    • /
    • v.12 no.6
    • /
    • pp.77-84
    • /
    • 2012
  • The current architectural design of unit modular has been based on 2D of CAD program, so unit modular character which needs unit information management, as a dried-member system, has no effect on design process. The purpose of this study is We have developed a suitable BIM design process, according to various works of construction, then tried to contribute to supply and activation of the urban-life-housing based on unit modular. The BIM modeling process based on unit modular has been in order of unit combination with preparing manual classification, and, it has been constructed, at construction site, from housing foundation to roof finish by Bottom-up method. At a manufacturing factory, it has been produced in order of 1) grouping materials and parts, 2) fabricating unit boxes, and 3) interference examination of unit boxes, and each order has been classified as housing structure, architecture, plumbing process separately. At a construction site, the fabrication has been done in order of, like as a real housing construction scenario, 1) RC foundation work 2) unit module job-site-fabrication work, 3) roof truss work, 4) plumbing and HVAC work, and 5) housing interior finish work. After modeling process, the interference examination on each work of construction has finally completed modeling. The Unit modular utilizing BIM modeling can make easy housing maintenance through systematic control with preparing manual of unit module information, and securing accurate and speedy construction information. And it will promote design credibility and create maximum effect of unit modular construction method, such as construction period reduction and upgrade of construction quality, etc., through the computer simulation as real as construction environment in cyber space, and with the interfering examination.

Work Breakdown Structure(WBS) based on the Steel Box Girder Production Process Model (강교량 제작 프로세스 모델을 기반으로한 WBS구축)

  • Ha, Seung-Ho;Kim, Seok;Kim, Kyoung-Min;Park, Chan-Hyuk;Kim, Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.521-525
    • /
    • 2004
  • The objective of this study is to implement a WBS (Work Breakdown Structure) so as to support efficient information management through the construction process of Steel Box Girder Bridge. To meet this requirement. This study performs the analysis of the business process. Through the work, information flows and information management levels are identified. Information management in each manufacturing process was various in its level. For the efficient information management, skating and utilization in schedule, cost, resource, and quality management, it is recommended to utilize a WBS composed of major work section and element structure of the steel box girder.

  • PDF

Analysis of ERP System Success Factors Depending on Organizational Culture and Size (기업의 조직문화와 기업의 규모에 따른 ERP 시스템 도입의 성공요인 분석)

  • Jung, Chang-Wook;Kim, Il-Kyoung
    • Journal of Information Technology Services
    • /
    • v.6 no.2
    • /
    • pp.35-47
    • /
    • 2007
  • The purpose of this thesis is to analyze the success factors of ERP system in corporations and to know what is different in the factors depending on organizational culture and size. Considering there are various results from introduction of the same information technology(IT), it is implied that organizational characteristics make a difference. In this thesis we did factor analysis and multiple regression about the factors based on the previous studies and analyzed the priorities depending on organizational culture and size. The results show that mechanistic organization has key success factors of work process change, project team abilities, and determination of CEO while organic organization has those of work process change and project team abilities. Plus bigger sized organization has success factors of work process change, project team abilities, and determination of CEO while small sized organization has those of work process change and project team abilities.

A structural design of punch and die block for restriking drawing die (리스트라이킹 드로잉금형용 펀치와 다이블록의 구조설계)

  • Kim, Sei-Hwan
    • Design & Manufacturing
    • /
    • v.2 no.1
    • /
    • pp.1-5
    • /
    • 2008
  • Restriking method is to add to process in order to get the correct size and high precision accuracy of product which is formed in pre-process. This method is widely used at bending work and drawing work. Restriking die is particularly design and used as restriking process is performed. Therefore, production cost is increasing as one process or a two process are added. In this paper, punches and die block of square shell drawing die which could be performed drawing work and restriking process by using only one die are designed in order to solve these factors. The structure of sectional die which can integrate drawing die and restriking die was developed.

  • PDF