• Title/Summary/Keyword: Work system

Search Result 14,034, Processing Time 0.035 seconds

A Study on Efficient Work Force Supply-Demand According to the Employment Permit System for Foreigners (외국인 고용허가제 도입에 따른 효율적 노동인력 수급에 관한 연구)

  • Kim, Heung-Jae;Park, Jae-Hyun;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.1
    • /
    • pp.175-186
    • /
    • 2007
  • The employment permit system for foreigners, which stresses introduction of foreign work force in a legal manner rather than in the position of being trainees, is anticipated to efficiently improve introduction and the overall management system of foreign work force and related difficulties such as illegal alien problems, absurdity on sending laborers overseas. In this paper, a prospective model of supply and demand of work force has been developed basing on various categories of industries and patterns about nationally practical foreign employees to look over efficient supply and demand of work force suiting employment of foreigner among foreign work force policies. To propose the prospective model, we have derived industry- and pattern-related matrixes of foreign laborers basing on Inter-Industry Analysis Method put forth by Professor Leontiyef in 1930, and through the derived matrix assessed repercussions concerning overall domestic industries and foreigner types and decided yearly weight; the capacity of supply and demand of foreign laborers can be compared through proposed statistical estimation and government estimation by combining the determined weight with yearly incomes of foreign laborers. This paper has thoroughly considered the particularity of our employment permit system for foreigners and applied the Weibull distribution and incorporated the dependence of foreign laborers during the limited period of 3 years to the industry relation analysis, ultimately proposing an efficient supply and demand method about domestic foreign work force.

Study on the Promoting the Improvement of Work Environment by the Monitoring Committee for Work Environment Measurement (모니터링위원회를 통한 작업환경 개선 활성화 방안)

  • Hwang, Gyuseok
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.28 no.2
    • /
    • pp.158-165
    • /
    • 2018
  • Objectives: We analyzed the problems that work environment measurement results don't lead to workplace improvement in the Work Environment Measurement System to propose an alternative. Methods: We reviewed reports and articles written by the Korea Occupational Safety and Health Agency and academic circles to identify the problems in the current Work Environment Measurement System and suggest an alternative. Results: One of the reasons that the Work Environment Measurement has not resulted in workplace improvement is that there were no proper regulating systems for managing the workplace improvement plans or improvement results. Moreover, there are not enough professional manpower in ministry of labor to evaluate the improvement plans and results from the Work Environment Measurement. Therefore, all of the workplace whose Work Environment Measurement results exceed the occupational exposure limit (OEL) should be managed by regional ministry of labor, and outside experts and new system for verifying improvement are needed. Conclusions: To accomplish the purpose of Work Environment Measurement, it is necessary to improve the work environment according to the results of Work Environment Measure. For this, it is necessary for the government to manage the fulfillment of workplace improvement plans and for measurement agencies to secure expertise.

Development for Eco-Design of Hydraulic Structures based on Web-based Information System (친환경 정비공법 선정 지원을 위한 웹기반 정보시스템 구축)

  • Cho, Young-Kweon;Kim, Kwan-Ho;Kim, Han-Joong;Choi, Soo-Myung
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.50 no.1
    • /
    • pp.95-106
    • /
    • 2008
  • Eco-friendly material and implementation methods have become important along with the existing standardized maintenance concept for the irrigation and flood control. However, the intrinsic function of the hydraulic structure is water supply and disaster prevention. Therefore, the material and work methods should be considered both eco-friendliness, durability and safety which are prerequisite elements to maintain the engineering function. In this study eco-friendly material and work methods would be classified into the vegetation based system, eco-friendly concrete system and stone-material system according to the characteristics of material. The quality standard for durability followed KS specification and related regulations. The quality standard for safety and eco-friendliness was set after literature review, and the database was developed using the standard. The structure applicable to onsite - the eco-friendly material and work method were classified based on the function and material of the hydraulic structure. Finally, database has been established for convenient management and selection of the proper material and work method. The eco-friendly material and work method could be searched easily for the convenience of the users, and the web-based data system has been developed for continuous registration of the material and work methods to be developed in the future.

The political issue on women's unpaid work I : Imputing the Value of Household Work (가사노동의 정책과정 개발에 대한 연구 I :가사노동의 측정을 위한 제안)

  • 문숙재
    • Journal of the Korean Home Economics Association
    • /
    • v.36 no.4
    • /
    • pp.35-48
    • /
    • 1998
  • The imputation of monetary value of women's contribution to the informal economy for inclusion in satellite accounts to the formal System of National Accounts has been attempted along many methods. This is bases on official laborforce statistics and time-use survey. In this statistical system, household work is not an economic activity(or productive labor). Also, the clssification of activities involved in household work is different from that of sampling survey relating evaluation. The measurement of women's unpaid work is one of the important tasks for the improvement of women's status and the establishment of a development policy. To measure unpaid work in the economic terms, we should take following measures; 1) develop satellite or other official accouts to measure unpaid work outside national accounts. 2) conduct a nation-wide time-use survey to measure the unpaid work. 3) develp a proper classificaition of activities for time-use statistics. 4) reexamine the minimum time criterion. 5) determine a proper method of valuing along the law system.

  • PDF

Safety Management Information System in Plants Construction Work (플랜트 건설공사의 안전관리 정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.4
    • /
    • pp.23-29
    • /
    • 2012
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as appurtenant works, temporary works, structural works, equipment work, finishing work and etc based on accident examples and investigation on actual condition in plants construction work. In addition, the safety management system was developed to perform risk assessment of plants construction and use it for effective safety training for labor.

Comparison of Display Visual Effects in Control Task under Limited Reaction Time (반응시간제한시 제어작업의 디스플레이 시각효과 비교)

  • 오영진
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.47
    • /
    • pp.57-68
    • /
    • 1998
  • Work environments have been changed with the advent of new technologies, such as computer technology. However, human cognitive limits can't pace up with the change of work environment. Designing human-computer system requires knowledge and evaluation of the human cognitive processes which control information flow workload. Futhermore, under limited reaction time and/or urgent situation, human operator may the work stress, work error and resultant deleterious work environment. This paper evaluate the visual factors of major information processing factors(information density, amount of information, operational speed of speed)on operator performance of supervisory control under urgent(limited reaction time)environments which require deleterious work condition. To describe the work performance int the urgent work situations with time stress and dynamic event occurrence, a new concept of information density was introduced. For a series of experiments performed for this study, three independent variables(information amount, system proceeding speed, information density) were evaluated using five dependent variables. The result of statistical analyses indicate that the amount of information affected on all of five dependent measure. Number of failure and number of secondary task score were influenced by both amount of information and operational speed of system. However reaction time of secondary task were affected by both amount of information and information density. As a result, the deleterious factors for the performances seemed to be a scanning time to supervise each control panel. Consequently, a new display panel was suggest to reduce operator work load for scanning task showing better operator performance.

  • PDF

A Study on the Duration of Expertise of Fire Fighters' Work (소방공무원의 업무숙달기간에 관한 연구)

  • Lee, Chang-Seop
    • Fire Science and Engineering
    • /
    • v.25 no.2
    • /
    • pp.138-143
    • /
    • 2011
  • In order to choose work system of fire organization between specialization system and multi- tasking system, fire organization's works should be analyzed. The most important thing of this task is evaluation of speciality of work that can be performed by estimating the duration of expertise of fire fighters' work. In this study I estimated the duration by survey. The duration is 12 years and 5 months which is a year and 9 months after promotion to fire senior sergeant lank in the case of average fire fighter.

조선 산업에서의 정반배치 계획시스템 개발의 효율화에 관한 연구

  • 박주호;박주철
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.283-285
    • /
    • 2001
  • The most work-space invest much time and labor for optimal arrangement. The work-plates of the work-space should be arranged, processed and assembled under the restricted work space. The optimal arrangement under the terms of a restriction arrange the maximum work-plates in appointed work-space. It's the central aim. The work-plates arrangement scheduling of the most work-space are achieved through the experience of the planner. Like this, if the work-plates arrangement is worked by hand, there spend much time for the training planner. And the burden of the personnel expenses occur for using the master worker, also there are dangerous factors to be able to bring the bottleneck circumstance for the process planning, because the quick work planning does not accomplish. With such problems, the biggest problem is inferior the value of the plan. For solved the such problem of hand-operating, some work-spaces developed and used the work-plate arrangement scheduling system for the special quality of themselves. This paper make research into a plan to develop the work-plate arrangement scheduling system efficiently.

  • PDF

Analysis of Organizational Performance of Employees of the Work-Learning Dual System Training Center (일학습병행 공동훈련센터 전담인력 조직성과 진단 및 분석 )

  • Tae-Seong Kim;Jun-Ki Min
    • Journal of Practical Engineering Education
    • /
    • v.15 no.1
    • /
    • pp.199-208
    • /
    • 2023
  • Performance analysis for work-learning dual system has been mainly conducted from the perspective of diagnosing the effectiveness of policies at the macro level. This study aims to analyze issues in organizational management of the work-learning dual system training center by conducting an analysis focusing on the organizational performance of the work-learning dual system training center's employees. As a result of the analysis, it was confirmed that the perception and attitude of employees toward the work-learning dual training center differed depending on the type of work-learning dual system and the type of employment contract. Among the types of work-learning dual system, overall, in the case of IPP, the organizational performance of employees was low, while the apprenticeship was relatively high. As for the type of employment contract, the need for institutional improvement has been derived, especially for the project contract workers.

Development of City Gas Facilities Information Management System Work analysis and System configuration (도시가스 시설정보 관리시스템 개발 - 업무분석 및 시스템구성을 중심으로)

  • 서창완;문은호
    • Spatial Information Research
    • /
    • v.4 no.2
    • /
    • pp.181-187
    • /
    • 1996
  • The purposes of this paper is to propose a methology for the efficient work analysis and system configuration for the developing of facilities information management system for city gas facilites. For this, work defining and user requirement was reflected on system, and systematic system development was derived through defining the problems of existing facilities management system. The study can be summarized as follows: First, existing work was computerized effectively by feedback with user interview on analyzing work. Second, it is appropriate to approach on system development in view of SI(System Integrate) which integrates Management Information System(MIS) and Geograph¬ic Information System(GIS). Third, it was found that Client-Server environment is good solution for now and future computer environment.

  • PDF