• 제목/요약/키워드: Work process model

Search Result 1,774, Processing Time 0.026 seconds

Finite Element Analysis of 3D Transient Thermo-mechanical Behav-ior of Work Roll in Hot Strip Rolling (열연중 Work Roll의 3차원 비정상상태 열변형 유한요소 해석)

  • 황상무
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 1999.03b
    • /
    • pp.261-264
    • /
    • 1999
  • An integrated finite element-based model is presented for the prediction of the three dimensional tran-sient thermo-mechanical behavior of the work roll in hot strip rolling. The model is comprised of basic finite element models which are incorporated into an iterative solution procedure to deal with the inter-dependence between the thermo-mechanical behavior of the strip and that of the work roll which arises from roll-strip contact as well as with the interdependence between the thermal and mechanical behav-ior Demonstrated is the capability of the model to reveal the detailed aspects of the thermo-mechanical behavior and to reflect the effect of various process parameters.

  • PDF

The Performance Improvement by Using a Role Model (역할 모델(Role model)을 이용한 업무 개선 - 업무의 달인(達人)을 찾아라 -)

  • Jung, Woo-Young;Ryu, Jae-Kwang;Kim, Kyung-Sik
    • The Korean Journal of Nuclear Medicine Technology
    • /
    • v.12 no.3
    • /
    • pp.199-207
    • /
    • 2008
  • Purpose: The purpose of a role model is to find a master or expert who conduct their business effectively and work as a model that helps staff in charge to conduct their works effectively. This process is an effort to find out the deviation of work performance capability among staffs in charge and settle the work process to be optimized to practical business, the standardization of protocol. Materials and Methods: Seoul Asan medical center nuclear department developed 6~7 role modeling items and has applied it to work. I report two operation improvement cases we had applied a role model to Seoul ASAN medical center. Result: By comparison with none application of a role model, we could improve operation efficiency. Conclusion: The main purpose of role modeling is to make the employees who do the business in their charge effectively as a role model and contribute to work performance of employees who are lack of work performance although they performed their works hard. Our team is going to develop role model items continuously and to make a use of it to practical work then improve work performance. We regard it as a useful tool to performance improvement. The performance improvement by using a role model was very useful instrument.

  • PDF

A Suggestion for Design Process Improvement to Develop a Design Management Model (설계관리 모델 개발을 위한 설계업무 프로세스 개선 방향 제시)

  • Bae, Jeung-Ik;Shin, Jae-Won;Kwon, O-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.90-98
    • /
    • 2006
  • As management is becoming a focus of a construction industry, conprehensive construction management is needed. Thus a plan of improving a design work process for developing design work capacity is proposed. The plan of improving a design work process based on a information flow for decision makings is expected to be a good ground material of not only smooth communication among stakeholders and information tracing, but also effective management of whole process. Theplansuggestedinthisstudyissummarizedas: (1) Detailed and clear work definition (2) information-oriented work definition (3) Strengthening works related to design management

Work Breakdown Structure(WBS) based on the Steel Box Girder Production Process Model (강교량 제작 프로세스 모델을 기반으로한 WBS구축)

  • Ha, Seung-Ho;Kim, Seok;Kim, Kyoung-Min;Park, Chan-Hyuk;Kim, Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.521-525
    • /
    • 2004
  • The objective of this study is to implement a WBS (Work Breakdown Structure) so as to support efficient information management through the construction process of Steel Box Girder Bridge. To meet this requirement. This study performs the analysis of the business process. Through the work, information flows and information management levels are identified. Information management in each manufacturing process was various in its level. For the efficient information management, skating and utilization in schedule, cost, resource, and quality management, it is recommended to utilize a WBS composed of major work section and element structure of the steel box girder.

  • PDF

Design and Implementation of Business Flow Management System for XML/EDI based Electronic Bidding System (XML/EDI기반 전자입찰 시스템을 위한 비즈니스 흐름 관리기의 설계 및 구현)

  • 윤선희
    • Journal of the Korea Computer Industry Society
    • /
    • v.4 no.10
    • /
    • pp.751-760
    • /
    • 2003
  • One of the business in the future will be executed by Business to Business(B to B) model of E-Commerce. The concept of the B to B model composes the work process, people, and supporting environment. The work processes are related to the information process, technologies, and standards. Information process elements contains digital data exchange, data sharing, and collaboration. This paper designed and implemented the XML-based Business Flow Management System(BFMS) for B to B model of E-commerce in the Internet. BFMS in this paper automatically performs the information process for B to B model such as electronic bidding system including purchase order management, bidding management, delivery management to build E-Commerce in the Internet. XML can be used as document standard between business for skating and exchange of data and also provide platform independent environment.

  • PDF

A Cost-Based Interior Information Management for an Apartment Housing Project (원가기반의 공동주택 마감재 정보관리 방안 연구)

  • Lee, Hoon-Ku;Lee, Yoon-Sun;Moon, Hyuk;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.76-84
    • /
    • 2009
  • Korea's construction industry experienced no difficulty managing the costs of finishing work items in the apartment housing field thanks to the uniform specification and the standardized costs of finishing work items. Finishing work items have continuously become more high class and differentiated, which has caused the costs of finishing work items to rise. This study identified problems with the cost management when planning finishing work items and choosing their alternatives based on the current process applied to the planning stage of finishing work items. It also found problems with the information management of finishing work items including design, cost, and work information that took place in bulk. Based on the identified problems, the design, cost and work information of finishing work items was integrated so that they could management the costs and information when planning finishing work items and selecting their alternatives. Then a cost-based information management process was suggested for finishing work items by improving each of the project cost management elements. Finally, an information model for finishing work items was built by studying the ways to integrate the information hierarchy and library of finishing work items.

Development of an Analytic Hierarchy Process Model for the Bidder Selection of a Large Construction Project (대형공사의 최적입찰자 선정을 위한 계층분석과정(AHP) 모형의 개발)

  • 정병호;조권익
    • Korean Management Science Review
    • /
    • v.16 no.1
    • /
    • pp.75-85
    • /
    • 1999
  • In recent, an unfaithful construction bring about many social problems. The bidding process considering bidding price firstly is one of the reasons raising an unfaithfull construction work. Thus, we should consider many other criteria including bidding price in the bidder selection process. This paper suggests an analytic hierarchy process(AHP) model for selecting the best bidder of a large construction project. A questionnaire was used to obtain domain experts' opinion about criteria to be considered in the bidding process. A hierarchical structure of the AHP model is formed using criteria obtained in the survey. The model consists of bidding price, construction capability, financial status, faith, and their 17 sub-attributes. The relative importance of bidders are judged by pairwise comparison or absolute measurement. An illustrative example is given to show the process selecting the best bidder using the suggested AHP model.

  • PDF

A Study on Heat Transfer Model in a Coke Oven Using Blending Coals (배합탄을 사용하는 코크스로의 열전달 모델에 관한 연구)

  • 이해평;이성철;김기홍;이용국
    • Journal of Energy Engineering
    • /
    • v.6 no.2
    • /
    • pp.152-161
    • /
    • 1997
  • Blending various coals during the coke making process affects the quality of coke as well as the total energy required for the process. The mathematical model based on Merrick's work developed to predict the effect of blending coals on coke making process. The Crank-Nicholson method was used to solve the model equation to predict temperature distributions, a coking time, and a total energy required during the process. The developed model successfully applied to Kwang-Yang Steel Company's coke oven to validate the model performance. It is hoped that the model can serve as a guidelines on how to blend coals during the process.

  • PDF

Integration Model of Cost and Schedule in Aluminum Form Work based on Quantity Take-offs and Daily Productivity Analysis (물량 산출 및 생산성 분석 기반의 거푸집공사 비용공정 통합 모델)

  • Ji, Soung-Min;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.17-18
    • /
    • 2011
  • Over the past 20 years, Researchers have tried to develop "Integration Model of Cost and Schedule" in construction industry. They suggested various models and techniques, however, it is still required to develop new methodology for AL Form Work in Public Multi-Housing Projects. Accordingly, this research focused on measuring quantity take-offs of on-going projects and analysing the basic process of using the resources(Labor, Material, Plant) related to cost and time data. There are 3 steps of this research : 1) The literature review of previous studies about Integration Model of Cost and Schedule was conducted. 2) Model for integration between cost and schedule was developed. 3) the accuracy of developed model was verified. The results are expected to improve in integrated managing the cost and schedule data of AL form work.

  • PDF

Modeling of the Centerless Infeed (Plunge) Grinding Process

  • Kim, Kang
    • Journal of Mechanical Science and Technology
    • /
    • v.17 no.7
    • /
    • pp.1026-1035
    • /
    • 2003
  • A computer simulation method for investigating the form generation mechanism in the centerless infeed (plunge) grinding process is described. For a 3-D simulation model of form generation, contact points are assumed to be on least squares contact lines at the grinding wheel, regulating wheel, and work-rest blade. Using force and deflection analyses, the validity of this assumption is shown. Based on the 2-D simulation model developed in the previous work and the least squares contact line assumption, a 3-D model is presented. To validate this model, simulation results were compared with the experimental works. The experiments and computer simulations were carried out using three types of cylindrical workpiece shapes with varying flat length. The experimental results agree well with the simulation. It can be seen that the effect of flat end propagated to the opposite end through workpiece reorientation.