Abstract
Korea's construction industry experienced no difficulty managing the costs of finishing work items in the apartment housing field thanks to the uniform specification and the standardized costs of finishing work items. Finishing work items have continuously become more high class and differentiated, which has caused the costs of finishing work items to rise. This study identified problems with the cost management when planning finishing work items and choosing their alternatives based on the current process applied to the planning stage of finishing work items. It also found problems with the information management of finishing work items including design, cost, and work information that took place in bulk. Based on the identified problems, the design, cost and work information of finishing work items was integrated so that they could management the costs and information when planning finishing work items and selecting their alternatives. Then a cost-based information management process was suggested for finishing work items by improving each of the project cost management elements. Finally, an information model for finishing work items was built by studying the ways to integrate the information hierarchy and library of finishing work items.
최근 장기간에 걸친 주택경기 침체 수요와 공급의 불균형에 의한 정적재고 증가, 수요자의 주거선호 변화 등으로 인해 차별화의 개념이 주택시장에서 경쟁우위 확보의 주요 요소로 대두되고 있다. 동일한 단위 평면 안에서 마감재 디자인 요소의 차별화에 의해 수많은 마감재 정보가 발생되고 고급화된 사양 선택으로 인하여 공동주택 단위 세대 내부의 마감 원가가 상향되고 있다. 본 연구는 현행 마감재 설계 단계의 프로세스를 대상으로 마감재 설계 및 대안 선정 시 발생되는 원가관리 측면에서의 문제점과 대규모 공동주택 건설 시 대량으로 발생하는 디자인정보, 원가정보, 작업정보 관리 측면에서 마감재 정보관리 문제점을 도출하고, 문제점을 해결하기 위한 방안으로 마감재 설계 및 대안 선정 시 원가관리와 정보를 관리 할 수 있도록 마감재의 디자인, 원가, 작업 정보를 통합하였다. 또한 프로젝트 원가관리 요소별 개선을 통해 원가기반의 마감재 정보 관리 프로세스를 제안하였다.