• Title/Summary/Keyword: Work management system

Search Result 3,448, Processing Time 0.034 seconds

Work Measurement of Dietetic Staff through Work Sampling Methodology in School Foodservice Systems (워크샘플링에 의한 학교급식 전담직원의 직무분석)

  • 양일선;이영은;차진아;유태용;정라나
    • Journal of Nutrition and Health
    • /
    • v.35 no.2
    • /
    • pp.263-271
    • /
    • 2002
  • The purpose of this study was to determine the standard work time of dietetic staff through work sampling methodology in school flood service systems. Work measurement through work sampling methodology was conducted in five conventional, five commissary and five joint management flood service systems over two consecutive weeks in October 1999. Statistical analysis was performed on the SAS/Win 6.12 package program for Kruskal-Wallis test and multiple comparison. Observed data were satisfied with a confidence level of 95% and a confidence interval of $\pm$ 0.05. The results of this study can be summarized as follows. The actual time spent by dietetic staff members in conventional, commissary, joint-management flood servile systems was 2,394, 2,521 and 2,110 minutes per week, respectively. Transportation time of each flood service systeml and ILO allowance rate (11%) was applied. Thus, the standard work time per week of dietetic staff members in conventional, commissary, joint-management flood service systems was 2,746.14, 2,861.58 and 2,520.81 minutes, respectively. The standardized index was 1.04, 1.08 and 0.95 men in conventional, commissary, and joint-management flood service systems, respectively. Regardless of the school flood service system, those with "the duty of cooking and distribution management" had the longest labor time, while those with "duty of nutritional education" had the shortest labor time.

A Study on Prototype of Just In Time Production Management System (적시생산 관리시스템에 관한 연구 - 철근공사를 중심으로 -)

  • Lee, Kyoo-Hyun;Choi, In-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.4 s.18
    • /
    • pp.153-164
    • /
    • 2005
  • This study aims at establishing JIT production management system to enable manage the resources input into from procurement through construction based on correct identification of the process, an analysis on the amount of input materials and information sharing. This study has focused on the process control and working process of rebar work in domestic apartment house construction where the overall scope of Process from the planning phase to the construction phase has been analyzed in this study. Also construction phase was selected for the application of a sample case. A basic model for JIT production was generated with these processes. Furthermore A questionnaire and the on-site survey with process, checklist and control data were prepared and performed for the application of JIT production management model into rebar work. The governing scopes of JIT production management system include process management, material management, yard loading and moving management and inventory control, and the operation of each control item

Design and Implementation of the Specialized Business-Work Management System(WMS) Using Mobile App and GPS (모바일 앱과 GPS를 이용한 특화된 근무관리시스템(WMS) 설계 및 구현에 대한 연구)

  • Koo, MinJeong;Yoon, KyungBae;Ko, ChangBae
    • Journal of Digital Convergence
    • /
    • v.11 no.8
    • /
    • pp.359-365
    • /
    • 2013
  • Companies recently tend to move their business sites to a customer-centered location and the work place is changed from specific time and place to a working environment of anytime and anywhere the job can be done. Therefore, the design and implementation of business-work management system using mobile applications has been actively researched. In this study, the business-work management system, a mobile application using GPS, is immediately transmitted to ERP system and is stored into a company's formula DB, at such sites outside the company as business trip destinations, training institutions, and outside meetings, through smartphone-based GPS location information using WiFi, 3G, LTE, or 4G. In this way, it is aimed to design and develop the mobile application system to obtain rapid authorization in connection with electro nic document approval system. Also, this study is to measure the system's productivity and expected effects through the users' survey results by actual application of the designed and developed system to companies.

A Study on the ISO 9001 Application of Railway Supervision work (철도 감리 업무의 ISO 9001 적용에 대한 고찰)

  • Jang Seog-Jae;Hwang In-Bum;Sung Jung-Hwa;Kim Hae-Seok
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.3 s.34
    • /
    • pp.325-329
    • /
    • 2006
  • Quite a few of persons often fall into an error that ISO has happened an additional work at construction sites. Supervision works, however, are carried out in compliance with 'Guidelines for the Supervision Works' which is including most ISO Requirements. Additional requirements needed for the supervision works are not many. This study has studied on the ISO application of supervision works in relation to, 1) ISO 9001 & KS A 9001 Quality Management System Basic Model, 2) The Process of Railway Construction Work Supervision Quality Management Plan, 3) Supervision Work Performance Guide Book(2005) & KS A 9001(2001) Standard, at the railway construction sites.

Web-based Coordination System for Daily Work Report between Contractor and Subcontractor (원수급업체와 하수급업체간 웹기반 작업일보 연동시스템 개발)

  • Seo Hae-Jun;Koo Kyo-Jin;Um Ik-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.370-375
    • /
    • 2004
  • The management of daily work report is very important due to the variety of work trade and activities. Although various project management systems have been developed to effectively deal with various task in site, they are not in practical use due to the non-coorperative attitude of sub-contractors. This is the reason the system are not developed in the focus of sub-contractors, but main contractors and the detail information about daily work report is omitted or lost in the collection process by contractors. Therefore the purpose of this study was to propose the Web-based coordination system for daily work report between contractor and sub-contractors

  • PDF

Risk factors and fisher positioning task during coastal gillnet fishing boat operation using UWB based positioning system (UWB 기반 측위시스템을 이용한 연안자망어선 어선원의 작업위치와 위험요소)

  • Kyung-Jin RYU;Su-Hyung KIM;Kyunghun LEE;Sunghun KIM;Sung-Jae WON;Yoo-Won LEE
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.60 no.2
    • /
    • pp.152-160
    • /
    • 2024
  • We analyzed risk factors of coastal gillnet fishers during fishing process and considered work safety measures to reduce safety accidents during fishing using a UWB (ultra wideband) based positioning system. The static position accuracy of the UWB based positioning system was 45 cm. When entering a port, there is a risk of falling overboard. When casting a net, there was a risk of falling overboard due to being hit by fishing gear or guards, or getting caught in a buoy line or sinker line. When hauling a net, there is a risk of getting caught between fishing gear and net hauler, and the risk of musculoskeletal disorders due to repetitive work over a long period of time. Most safety accidents during work on fishing boats are blamed on human errors of the fisher and skipper, but safety accidents occur due to a mixture of mechanical and equipment factors, work and environmental factors, and management factors in addition to human errors. Therefore, the 4E were presented as countermeasures against the 4M, which are causes of safety accidents, and the proposed measures were used to identify risk factors for operation process, comply with work safety rules, and ensure the wearing of personal protective equipments. We need to reduce safety accidents during work by making it part of our daily routine. These research results can be used in the future for optimal placement of fishing gear and fishing nets in other coastal industries where safety accidents occur frequently.

A Study on the Database Construction and the Management System Development of Water-Facility Using GSIS (GSIS를 이용한 상수도시설물의 데이터베이스 구축 및 관리시스템 개발에 관한 연구)

  • Kim, Young-Kon
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.10 no.1 s.19
    • /
    • pp.109-123
    • /
    • 2002
  • The purpose of this study construct water-facility Database and to develop its management system using GSIS. We used route system and event table that are data model in GSIS for the construction of water valves on water facility pipe. A water-facility management system using GSIS was developed and was actually applied for the city of Yosu and compared with conventional water-facility management systems in terms of workability, information searching cost, and database management efficiency. The system has also been compared with those of two other local governments in terms of functions, process time, and conveniences. The generalization of the work model for water-facility system was also attempted based on the data collected from three local governments and it was revised by the work model of the wide area water-facility system. The generalized work model in this study was compared with other two local governments' work models. The generalized work model will enable local governments to develop more efficient and economical water-facility management system by GSIS in future.

  • PDF

Proposal for Government Business Management System Innovation Direction : Focusing on the Analysis of the Private Enterprise Business System and Current Status of On-Nara 2.0 (정부 업무관리시스템 혁신 방향 제언 민간기업 업무시스템 및 온-나라 2.0 현황 분석을 중심으로)

  • Hwang, Jin hyun;Yim, Jin hee
    • The Korean Journal of Archival Studies
    • /
    • no.75
    • /
    • pp.135-176
    • /
    • 2023
  • The business management system is a standardized system commonly used by government agencies and is a major tool that remains in the work process and decision-making of government agencies. Production of document-type records is mainly focused on approval documents, so it does not cover various types of records. In a changing environment such as the production of new digital types of records, the emergence of various collaboration software and work systems, and remote work, it is necessary to think about the direction the government work management system will go. This study investigates business systems and utilization methods of competitive companies, analyzes the usage status of On-Nara 2.0, a government business management system, and conducts interviews with business managers. And the purpose is to analyze what kind of difference there is. In addition, we would like to suggest improvement functions and policy directions to respond to digital innovation and improve job accountability and efficiency.

A Study on Safety Management Model of Shipyard Industry Subcontractor (조선업 협력업체의 안전관리 모델에 관한 연구)

  • 목연수;이동훈;장성록;고성석
    • Journal of the Korean Society of Safety
    • /
    • v.14 no.1
    • /
    • pp.158-166
    • /
    • 1999
  • Due to the work characteristics of shipyard industry, subcontractors are essential and employees of them consist of 25% of the total employee. Problems of their safety management are as follows; - obscurity of safety management responsibility - flimsiness of subcontractor's safety awareness - absence of ability to develop safety techniques and to provide safety equipments - lack of opportunity of safety education The purpose of this study is modelling safety management system of shipyard industry subcontractors to reduce industrial accidents by employees of subcontractors. A phased model contained organization and work responsibility of related departments, safety management planning and evaluation system, safe work supporting system, safety education supporting system.

  • PDF

Scheduling Risk Management at the Preconstruction Phase (공사 착공 전 단계의 공정리스크 대응방안)

  • Park Ji-Hoon;Kim Sun-Kuk;Han Choong-He
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.457-461
    • /
    • 2004
  • The insufficient management o( the risk of preconstruction phase causes the risk of construction phase so it makes bad effects such as the extension of construction time and raising of cost. Therefore, the management of the risk of preconstruction phase is being considered as an important element of success of project and the competitive power of construction companies. This study Is to suggest solution methods for each progress after examining reasons of the risk for the management of the risk of preconstruction phase 1'he progress is limited as earth work, RC work, steel work and curtain wall work. Through the introduction of Knowledge Management system, work flow is made by specialist of each part. The reasons of the risk of progress are chosen through the analysis of work flow and I suggest detailed solutions such as person in charge, the starting point of progress and the information of requirements according to the grade of importance about elements of the risk

  • PDF