• Title/Summary/Keyword: Work management system

Search Result 3,448, Processing Time 0.079 seconds

A Study on the Integrated Management System for Rebar Information in Building Construction (건설공사 철근정보관리 개선방안에 관한 연구)

  • Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.4 s.18
    • /
    • pp.99-106
    • /
    • 2005
  • With labor shortage and high-wage, the construction cost is rising and the construction-business is dull, demanding the construction environment of Korea to raise profitability through major cost savings and rationalization of construction management. Therefore, in this study, to improve many problems found in calculating rebar quantity for capital expenditure programming which is considered the beginning stage of rebar work. and to improve problems such as no grasping of rebar loss due to lack of systematic management in order/purchase stage and construction management stage, a rebar information-management-system was found and preyed. The relation database was designed for the rebar information management system by analyzing work process of a rebar manufacturing plant, as the rebar information that is necessary in a rebar manufacturing plant if similar to that of a purchasing department of general construction company. The Proposed rebar information management system was implemented in two large rebar production plants. The implementation of the proposed system showed that the system increased work efficiency, reduced the management manpower, and improved the project-integrated management

Safety Management Information System in Construction Work;Focus on Tunnel Work (건설공사의 안전관리정보시스템 개발;터널공사 중심으로)

  • Park, Jong-Keun;paik, Shin-Won
    • Journal of the Korean Society of Safety
    • /
    • v.23 no.4
    • /
    • pp.72-78
    • /
    • 2008
  • In any form of construction work, it is essential that accidents be prevented at every stage from foundation preparation to build completion. For this, it is necessary to use models that can assess risk and provide instruction for safe work processes so that the risk of accidents is reduced. Currently, however, very few models can perform these tasks. In this paper, we presents a model that assesses risk quantitatively by analyzing risk factors involved in stage of construction such as foundation work, erection work, structural work, equipment work, finishing work and etc work. The model performs assessment based on examples of accidents and by investing actual conditions during construction. In addition, we presents in this paper a safety management system was developed to assess risk during construction and to effectively train laborers.

Safety Management Information System in Construction Work - Focus on Apartment Work - (건설공사의 안전관리정보시스템 개발 - 아파트공사 중심으로 -)

  • Park, Jong-Keun
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.6
    • /
    • pp.124-131
    • /
    • 2009
  • In any form of construction work, it is essential that accidents be prevented at every stage, from foundation preparation to build completion. For this, it is necessary to use models that can assess risk and provide instructions for safe work processes so that the risk of accidents is reduced. Currently, however, very few models can perform these tasks. In this paper, we present a model that assesses risk quantitatively by analyzing the risk factors involved in each stage of construction, such as foundation work, temporary work, structural work, equipment work, and finishing work. The model performs assessment based on examples of accidents and by investigating actual conditions during construction. In addition, we present in this paper a safety management system developed to assess risk during construction and to effectively train laborers.

CREATING TOTAL PROJECT MANAGEMENT SYSTEM ON APPLYING LEAN CONSTRUCTION

  • Sang-Chul Kim;Chan-Jeong Park
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.41-49
    • /
    • 2007
  • GS E&C had developed construction management system, PMS which is based on EVMS in 1997. Recently, TPMS has developed for effective construction management through applying daily schedule management and JIT on materials, labors, equipments focusing field work. TPMS realizes "Shielding" and "Make-Ready Process" which are the main concept of Lean construction. Through this system, it can manage and plan daily field work, support the field work related material, labor, and equipment planning, and minimizes the non-valuable process. This paper introduces the concept of TPMS, and through established system, it can lead the construction culture and raise the competitive power of construction industry

  • PDF

Development of City Gas Facilities Information Management System Work analysis and System configuration (도시가스 시설정보 관리시스템 개발 - 업무분석 및 시스템구성을 중심으로)

  • 서창완;문은호
    • Spatial Information Research
    • /
    • v.4 no.2
    • /
    • pp.181-187
    • /
    • 1996
  • The purposes of this paper is to propose a methology for the efficient work analysis and system configuration for the developing of facilities information management system for city gas facilites. For this, work defining and user requirement was reflected on system, and systematic system development was derived through defining the problems of existing facilities management system. The study can be summarized as follows: First, existing work was computerized effectively by feedback with user interview on analyzing work. Second, it is appropriate to approach on system development in view of SI(System Integrate) which integrates Management Information System(MIS) and Geograph¬ic Information System(GIS). Third, it was found that Client-Server environment is good solution for now and future computer environment.

  • PDF

Project Management Information System Using Work Breakdown Structure (업무분할체계를 이용한 사업관리정보시스템)

  • 이정구
    • Proceedings of the Korea Society for Industrial Systems Conference
    • /
    • 1997.11a
    • /
    • pp.303-320
    • /
    • 1997
  • In A institute, project managers present quarterly project performance report according to institute's law. In quarterly project performance report, progress of project performance and budget expended should be written. Progress of project performance and progress of budget expended are key management factors in A institute. Because financial database system Is already constructed, progress of budget expended is got from information system. But the progress of project performance that project manager estimate subjectively can not be judged of its correctness because there is not project management information system that is able to calculate the progress of project performance systematically. In this study, we present the project management system assign all activities to every project participator according to their work share rate using WBS(Work Breakdown Structure) and calculate the progress of project performance systematically Also we construct project management information system for above project management system implementing.

  • PDF

The Improvement Plan of Information Management of Interior Finishing Work at Apartment in Korea (국내 집합 공동주택 내장마감공사 정보관리 개선방안)

  • Kim, Jin-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.3
    • /
    • pp.99-106
    • /
    • 2003
  • The purpose of this study is to suggest the rational plans of Information Management in the interior finishing work. The results of this study are summarized as follows; I) Analytical survey of actual construction progress of interior finishing work 2) Review of computer-based development in construction planning & information management of interior finishing work 3) Structure of interior finishing work Planning and Management Support System And the expectancies of this paper are that it can be used as efficient data for improvement of system to systematize planning and execution of interior finishing work in korea.

Application of a PERT-Type System on Work Management in Home-Delivered Meals Service Program for Elderly (가정배달 노인급식서비스 작업공정관리 모형개발을 위한 PERT-Type System의 적용)

  • 양일선;채인숙;유일근
    • Journal of Nutrition and Health
    • /
    • v.34 no.6
    • /
    • pp.701-714
    • /
    • 2001
  • The purpose of this study was to apply a PERT-type system, a combination of the project evaluation and review technique(PERT) and critical path method(CPM) on the employees' work time management of flood preparation, assembly, transportation and cleaning in home-delivered meals program for elderly The resources allotment heuristic program was developed by considering the number of employees and cooking utilities, being limited resources of home- delivered meals program. This program could assign the employees to perform the works included in flood preparation, assembly, transportation ind cleaning. Critical path and activities ware identified by PERT-type system on the basic of work time investigation in five senior centers. Work sheets were invented to perform the work by the shortest path with flexible employees'maximum flow As a result of the work time investigation, the most prevalent activities were ones of preparation in center C and E. Besides, the preparation(over fifty percent) was the most proportion among flood preparation, assembly, transportation and cleaning in center C and E. Critical path and activities of 'C'center were cucumber in sauce preparation path and assembly, wrapping in assembly path and case delivery in transportation path. Critical path and activities of 'E'center were Pan-fried Potato Preparation Path and assembly, case covering, wrapping in assembly Path. The work sheet invented by the heuristic program and PERT-type system reduced the work completion time and man hours in both centers.

  • PDF

Knowledge Management Activity and Performance of University Hospital Employees (대학병원직원의 지식경영활동과 성과에 관한 연구)

  • Lee, Hyun-Sook
    • Health Policy and Management
    • /
    • v.24 no.3
    • /
    • pp.291-300
    • /
    • 2014
  • Background: The efficient knowledge management in hospital organization is generally known as the important activities relevant to employees' knowledge sharing behavior and work performance. This research examined factors affecting employees' knowledge sharing behavior and work performance in top 4 university hospitals. This study is based on individual factors such as incentives, reciprocity, behavioral control, and subjective norms. Also, there are organizational factors such as CEO support, learning climate, IT system, rewards system, and trust. Methods: Data was collected from employees who are working at 3 hospitals university in Seoul and 1 university hospital in Gyeonggi-Do through the self-administered questionnaires. A total of 779 questionnaires were analyzed by PASW SPSS ver. 18.0. (SPSS Inc., Chicago, IL, USA). Results: The significant variables affecting knowledge sharing behavior are behavioral control (in individual factor) and CEO, IT system, and trust (in organization factor). Also the significant variables affecting work performance are incentives, reciprocity, subjective norms, and behavioral control (in individual factor) and CEO support, IT system, reward system, and trust (in organization factor). Conclusion: The personality and organization characteristics factors is important to improve knowledge sharing behavior and work performance of hospital employees. Therefore, to make more efficient knowledge management is to build and system knowledge sharing culture, system, and leadership and to develop practical strategies.

Estimating Relative Risk Level of Construction Work (건설공사 상대적 위험도 산정)

  • Son, Ki-Sang;Yang, Hak-Soo;Gal, Won-Mo
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.5 s.77
    • /
    • pp.53-59
    • /
    • 2006
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. The domestic system of standard safety management costs is not considered in the foreign country, while only related subjective items have been investigated and evaluated for this study. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basial data and material to be systemized.