• 제목/요약/키워드: Work in process

검색결과 8,686건 처리시간 0.029초

여성 재킷의 생산능력 설정을 위한 연구 (A Study on the Productive Capacity Setting of Women's Jacket)

  • 김진선;심규남;오순
    • 한국의류산업학회지
    • /
    • 제13권2호
    • /
    • pp.269-278
    • /
    • 2011
  • This study aims at setting up productive capacity which can be usefully utilized for work management of apparel manufacturers. So as to achieve this goal, an apparel manufacturing company which has been operated by miniline system in Seoul was selected. Standard time and man-hour were calculated to create the accurate productive capacity by observing and measuring a work flow included cutting, sewing and finishing processes. And the result is as following. The standard time for each process was presented as cutting process 47004.5s, sewing process 671050.5s and finishing process 22426.3s. And 15284.4ms was computed as total procession man-hour per day of the manufacturer which is organized of 16 people. Also, the procession man-hour for each process was revealed as cutting process 396.7ms(2.6%), sewing process 14509.3ms(94.9%) and finishing process 378.5ms(2.5%). +Surplus was found in the productivity for each process included the cutting process(outshell, lining and seam process), the sewing process(preparation and arrangement process) and the finishing process. But, additional man-hour 52436.18ms was required because the productive capacity was calculated as -surplus(-13.9%) in the sewing process(part and assembly process). Therefore, a work schedule was planned based on the previous result. However, loading can be ideal when a capacity and a load become '0'. The object company should find the way to reduce allowance(26.25%) of the sewing process through reconstruction of consciousness and improvement in functions with analyzing works of operators. Also, they need to consider an additional supplement of the personnel.

적시생산 관리시스템에 관한 연구 - 철근공사를 중심으로 - (A Study on Prototype of Just In Time Production Management System)

  • 이규현;최인성
    • 한국건축시공학회지
    • /
    • 제5권4호
    • /
    • pp.153-164
    • /
    • 2005
  • This study aims at establishing JIT production management system to enable manage the resources input into from procurement through construction based on correct identification of the process, an analysis on the amount of input materials and information sharing. This study has focused on the process control and working process of rebar work in domestic apartment house construction where the overall scope of Process from the planning phase to the construction phase has been analyzed in this study. Also construction phase was selected for the application of a sample case. A basic model for JIT production was generated with these processes. Furthermore A questionnaire and the on-site survey with process, checklist and control data were prepared and performed for the application of JIT production management model into rebar work. The governing scopes of JIT production management system include process management, material management, yard loading and moving management and inventory control, and the operation of each control item

레이디얼압출에서 금형구조에 따른 플렌지의 성형형태 (The deformation patterns of flange according to die geometry in the radial extrusion)

  • 고병두;강동명;이하성
    • Design & Manufacturing
    • /
    • 제2권1호
    • /
    • pp.7-10
    • /
    • 2008
  • Restriking method is to add to process in order to get the correct size and high precision accuracy of product which is formed in pre-process. This method is widely used at bending work and drawing work. Restriking die is particularly design and used as restriking process is performed. Therefore, production cost is increasing as one process or a two process are added. In this paper, punches and die block of square shell drawing die which could be performed drawing work and restriking process by using only one die are designed in order to solve these factors. The structure of sectional die which can integrate drawing die and restriking die was developed.

  • PDF

작업분석을 통한 합벽거푸집 구성 요소별 작업소요시간에 관한 연구 (Work Time of Basement Composite Wall Form Assembly by Work Time Analysis)

  • 허경무;김명현;김태희;김재엽;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.9-13
    • /
    • 2009
  • Recently, construction in downtown is often done closely at the adjacent building. In this case, underground construction need to Basement Composite Wall(BCW) construction. However, generally, during the construction process of BCW form works have many problems that are narrow working space and inefficient time consuming. Despite of these problems, there was no quantitative research for the work time of BCM assembly. Therefore, in this study, work time of CBW form assembly in underground construction is identified by the work analysis. The results of this study reveal that buttress work of basement form take lots of time in the entire work process of Basement Composite Wall form assembly.

  • PDF

트리맵을 이용한 비즈니스 프로세스 수행자간 업무공유 관계 시각화 (Treemapping Work-Sharing Relationships among Business Process Performers)

  • 안현;김광훈
    • 인터넷정보학회논문지
    • /
    • 제17권4호
    • /
    • pp.69-77
    • /
    • 2016
  • 최근에 비즈니스 인텔리전스 분야에서 비주얼 애널리틱스의 중요성이 강조되고 있다. 비즈니스 인텔리전스 관점에서 비주얼 애널리틱스는 다양한 관점의 비즈니스 관련 정보를 인터랙티브한 형태로 시각화함으로써 의사결정에 유용한 인사이트들을 획득하는 것을 목표로 한다. 본 논문에서는 트리맵을 이용하여 비즈니스 프로세스 수행자들간의 업무공유 관계들을 시각화하는 방법을 제안한다. 업무공유 관계는 비즈니스 프로세스의 특정 단위 업무에 공통적으로 참여하는 두 수행자간에 형성되는 연결 관계로서, 프로세스 기반 조직의 구조 및 행동 패턴을 이해하는 데에 중요한 요소이다. 이를 위해, 비즈니스 프로세스의 기본적인 계층적 정보와 수행자간 업무공유 관계를 트리맵의 형태로 나타내는 시각화 도구를 설계 및 구현하였다. 최종적으로 XPDL (XML Process Definition Language) 프로세스 모델을 이용한 실행 예제를 통해 시각화 도구의 유용성을 검증하였다.

작업환경 및 공정에 따른 작업복 착의실태 분석 -조선업 근로자를 중심으로- (Status quo Analysis on the Wearing Conditions of Working Clothes according to the Working Environment and Working Process -With reference to the Shipbuilding Industry Workers-)

  • 배현숙;박혜원;박진아;김지관
    • 한국의류산업학회지
    • /
    • 제12권2호
    • /
    • pp.203-213
    • /
    • 2010
  • This study examined the wearing conditions of working clothes of shipbuilding industry workers according to the working environmental factors and working process features. It was also investigated the relationship between the wearing sense of working clothes and the overall comfort according to work processes. In the working process of shipbuilding industry, the process of fitting, welding, grinding and painting were chosen by considering work environmental factors, disaster types, hazardous materials, work process features, working clothes and safety equipments of each work categorized. The workers of fitting process usually wore the standard working clothes, while more than 60% of the workers of welding, grinding and painting wore the specialized protective clothes. The hazardous work environmental factors such as noise, heavy dust, high temperature and noxious fumes affected to the workers of fitting, welding and grinding. However, the workers of painting were greatly damaged by organic solvent. The dissatisfaction with the wearing performance of working clothes was highly shown in the sweat absorbency, moisture permeability and body protection. In respect of the correlation between the overall comfort and the wearing sense of working clothes, the satisfaction was decreased in orders of movement comfort> sensual comfort> physiological comfort.

유닛모듈러 기반 도시형 생활주택의 BIM 모델링 프로세스 개발 연구 (The Study on the Developing Process of BIM Modeling for Urban-life-housing Based on Unit Modular)

  • 이창재;임석호
    • KIEAE Journal
    • /
    • 제12권6호
    • /
    • pp.77-84
    • /
    • 2012
  • The current architectural design of unit modular has been based on 2D of CAD program, so unit modular character which needs unit information management, as a dried-member system, has no effect on design process. The purpose of this study is We have developed a suitable BIM design process, according to various works of construction, then tried to contribute to supply and activation of the urban-life-housing based on unit modular. The BIM modeling process based on unit modular has been in order of unit combination with preparing manual classification, and, it has been constructed, at construction site, from housing foundation to roof finish by Bottom-up method. At a manufacturing factory, it has been produced in order of 1) grouping materials and parts, 2) fabricating unit boxes, and 3) interference examination of unit boxes, and each order has been classified as housing structure, architecture, plumbing process separately. At a construction site, the fabrication has been done in order of, like as a real housing construction scenario, 1) RC foundation work 2) unit module job-site-fabrication work, 3) roof truss work, 4) plumbing and HVAC work, and 5) housing interior finish work. After modeling process, the interference examination on each work of construction has finally completed modeling. The Unit modular utilizing BIM modeling can make easy housing maintenance through systematic control with preparing manual of unit module information, and securing accurate and speedy construction information. And it will promote design credibility and create maximum effect of unit modular construction method, such as construction period reduction and upgrade of construction quality, etc., through the computer simulation as real as construction environment in cyber space, and with the interfering examination.

강교량 제작 프로세스 모델을 기반으로한 WBS구축 (Work Breakdown Structure(WBS) based on the Steel Box Girder Production Process Model)

  • 하승호;김석;김경민;박찬혁;김경주
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.521-525
    • /
    • 2004
  • 본 연구의 목적은 강교량 제작 현장에서의 효율적인 정보관리를 지원하기 위한 정보관리체계의 구축을 목적으로 한다. 이를 위해 강교량 제작 업무 프로세스와 제작공종별 발생정보의 흐름과 정보관리 레벨(Level)을 분석함으로써 업무 수행과정에서의 효율적인 정보관리를 지원하기 위한 WBS 구축방안에 대한 연구를 수행하였다. 강교량 제작은 다양한 제작공정을 거쳐 수행되며, 각 단계별 업무 목적 및 관행에 따라 다양한 정보관리 수준을 갖는 것으로 파악되었으며, 효율적인 공정, 원가, 자원 및 풀질 등의 정보 관리, 공유 및 재활용을 위해서는 공종과 강교 거더의 부위 분류체계를 바탕으로 한 WBS의 구축이 바람직한 것으로 분석되었다.

  • PDF

기업의 조직문화와 기업의 규모에 따른 ERP 시스템 도입의 성공요인 분석 (Analysis of ERP System Success Factors Depending on Organizational Culture and Size)

  • 정창욱;김일경
    • 한국IT서비스학회지
    • /
    • 제6권2호
    • /
    • pp.35-47
    • /
    • 2007
  • The purpose of this thesis is to analyze the success factors of ERP system in corporations and to know what is different in the factors depending on organizational culture and size. Considering there are various results from introduction of the same information technology(IT), it is implied that organizational characteristics make a difference. In this thesis we did factor analysis and multiple regression about the factors based on the previous studies and analyzed the priorities depending on organizational culture and size. The results show that mechanistic organization has key success factors of work process change, project team abilities, and determination of CEO while organic organization has those of work process change and project team abilities. Plus bigger sized organization has success factors of work process change, project team abilities, and determination of CEO while small sized organization has those of work process change and project team abilities.

리스트라이킹 드로잉금형용 펀치와 다이블록의 구조설계 (A structural design of punch and die block for restriking drawing die)

  • 김세환
    • Design & Manufacturing
    • /
    • 제2권1호
    • /
    • pp.1-5
    • /
    • 2008
  • Restriking method is to add to process in order to get the correct size and high precision accuracy of product which is formed in pre-process. This method is widely used at bending work and drawing work. Restriking die is particularly design and used as restriking process is performed. Therefore, production cost is increasing as one process or a two process are added. In this paper, punches and die block of square shell drawing die which could be performed drawing work and restriking process by using only one die are designed in order to solve these factors. The structure of sectional die which can integrate drawing die and restriking die was developed.

  • PDF