• 제목/요약/키워드: Work System

검색결과 14,043건 처리시간 0.043초

외국인 고용허가제 도입에 따른 효율적 노동인력 수급에 관한 연구 (A Study on Efficient Work Force Supply-Demand According to the Employment Permit System for Foreigners)

  • 김흥재;박재현;강경식
    • 대한안전경영과학회지
    • /
    • 제9권1호
    • /
    • pp.175-186
    • /
    • 2007
  • The employment permit system for foreigners, which stresses introduction of foreign work force in a legal manner rather than in the position of being trainees, is anticipated to efficiently improve introduction and the overall management system of foreign work force and related difficulties such as illegal alien problems, absurdity on sending laborers overseas. In this paper, a prospective model of supply and demand of work force has been developed basing on various categories of industries and patterns about nationally practical foreign employees to look over efficient supply and demand of work force suiting employment of foreigner among foreign work force policies. To propose the prospective model, we have derived industry- and pattern-related matrixes of foreign laborers basing on Inter-Industry Analysis Method put forth by Professor Leontiyef in 1930, and through the derived matrix assessed repercussions concerning overall domestic industries and foreigner types and decided yearly weight; the capacity of supply and demand of foreign laborers can be compared through proposed statistical estimation and government estimation by combining the determined weight with yearly incomes of foreign laborers. This paper has thoroughly considered the particularity of our employment permit system for foreigners and applied the Weibull distribution and incorporated the dependence of foreign laborers during the limited period of 3 years to the industry relation analysis, ultimately proposing an efficient supply and demand method about domestic foreign work force.

모니터링위원회를 통한 작업환경 개선 활성화 방안 (Study on the Promoting the Improvement of Work Environment by the Monitoring Committee for Work Environment Measurement)

  • 황규석
    • 한국산업보건학회지
    • /
    • 제28권2호
    • /
    • pp.158-165
    • /
    • 2018
  • Objectives: We analyzed the problems that work environment measurement results don't lead to workplace improvement in the Work Environment Measurement System to propose an alternative. Methods: We reviewed reports and articles written by the Korea Occupational Safety and Health Agency and academic circles to identify the problems in the current Work Environment Measurement System and suggest an alternative. Results: One of the reasons that the Work Environment Measurement has not resulted in workplace improvement is that there were no proper regulating systems for managing the workplace improvement plans or improvement results. Moreover, there are not enough professional manpower in ministry of labor to evaluate the improvement plans and results from the Work Environment Measurement. Therefore, all of the workplace whose Work Environment Measurement results exceed the occupational exposure limit (OEL) should be managed by regional ministry of labor, and outside experts and new system for verifying improvement are needed. Conclusions: To accomplish the purpose of Work Environment Measurement, it is necessary to improve the work environment according to the results of Work Environment Measure. For this, it is necessary for the government to manage the fulfillment of workplace improvement plans and for measurement agencies to secure expertise.

친환경 정비공법 선정 지원을 위한 웹기반 정보시스템 구축 (Development for Eco-Design of Hydraulic Structures based on Web-based Information System)

  • 조영권;김관호;김한중;최수명
    • 한국농공학회논문집
    • /
    • 제50권1호
    • /
    • pp.95-106
    • /
    • 2008
  • Eco-friendly material and implementation methods have become important along with the existing standardized maintenance concept for the irrigation and flood control. However, the intrinsic function of the hydraulic structure is water supply and disaster prevention. Therefore, the material and work methods should be considered both eco-friendliness, durability and safety which are prerequisite elements to maintain the engineering function. In this study eco-friendly material and work methods would be classified into the vegetation based system, eco-friendly concrete system and stone-material system according to the characteristics of material. The quality standard for durability followed KS specification and related regulations. The quality standard for safety and eco-friendliness was set after literature review, and the database was developed using the standard. The structure applicable to onsite - the eco-friendly material and work method were classified based on the function and material of the hydraulic structure. Finally, database has been established for convenient management and selection of the proper material and work method. The eco-friendly material and work method could be searched easily for the convenience of the users, and the web-based data system has been developed for continuous registration of the material and work methods to be developed in the future.

가사노동의 정책과정 개발에 대한 연구 I :가사노동의 측정을 위한 제안 (The political issue on women's unpaid work I : Imputing the Value of Household Work)

  • 문숙재
    • 대한가정학회지
    • /
    • 제36권4호
    • /
    • pp.35-48
    • /
    • 1998
  • The imputation of monetary value of women's contribution to the informal economy for inclusion in satellite accounts to the formal System of National Accounts has been attempted along many methods. This is bases on official laborforce statistics and time-use survey. In this statistical system, household work is not an economic activity(or productive labor). Also, the clssification of activities involved in household work is different from that of sampling survey relating evaluation. The measurement of women's unpaid work is one of the important tasks for the improvement of women's status and the establishment of a development policy. To measure unpaid work in the economic terms, we should take following measures; 1) develop satellite or other official accouts to measure unpaid work outside national accounts. 2) conduct a nation-wide time-use survey to measure the unpaid work. 3) develp a proper classificaition of activities for time-use statistics. 4) reexamine the minimum time criterion. 5) determine a proper method of valuing along the law system.

  • PDF

플랜트 건설공사의 안전관리 정보시스템 개발 (Safety Management Information System in Plants Construction Work)

  • 박종근
    • 대한안전경영과학회지
    • /
    • 제14권4호
    • /
    • pp.23-29
    • /
    • 2012
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as appurtenant works, temporary works, structural works, equipment work, finishing work and etc based on accident examples and investigation on actual condition in plants construction work. In addition, the safety management system was developed to perform risk assessment of plants construction and use it for effective safety training for labor.

반응시간제한시 제어작업의 디스플레이 시각효과 비교 (Comparison of Display Visual Effects in Control Task under Limited Reaction Time)

  • 오영진
    • 산업경영시스템학회지
    • /
    • 제21권47호
    • /
    • pp.57-68
    • /
    • 1998
  • Work environments have been changed with the advent of new technologies, such as computer technology. However, human cognitive limits can't pace up with the change of work environment. Designing human-computer system requires knowledge and evaluation of the human cognitive processes which control information flow workload. Futhermore, under limited reaction time and/or urgent situation, human operator may the work stress, work error and resultant deleterious work environment. This paper evaluate the visual factors of major information processing factors(information density, amount of information, operational speed of speed)on operator performance of supervisory control under urgent(limited reaction time)environments which require deleterious work condition. To describe the work performance int the urgent work situations with time stress and dynamic event occurrence, a new concept of information density was introduced. For a series of experiments performed for this study, three independent variables(information amount, system proceeding speed, information density) were evaluated using five dependent variables. The result of statistical analyses indicate that the amount of information affected on all of five dependent measure. Number of failure and number of secondary task score were influenced by both amount of information and operational speed of system. However reaction time of secondary task were affected by both amount of information and information density. As a result, the deleterious factors for the performances seemed to be a scanning time to supervise each control panel. Consequently, a new display panel was suggest to reduce operator work load for scanning task showing better operator performance.

  • PDF

소방공무원의 업무숙달기간에 관한 연구 (A Study on the Duration of Expertise of Fire Fighters' Work)

  • 이창섭
    • 한국화재소방학회논문지
    • /
    • 제25권2호
    • /
    • pp.138-143
    • /
    • 2011
  • 소방조직의 근무체제를 분업체제로 할 것인지 멀티체제로 할 것인지에 대한 선택을 하기 위해서는 소방업무에 대한 분석이 선행되어야 한다. 이 분석에서 제일 중요한 것이 업무의 전문성 평가인데, 이것은 업무를 숙련시키는데 소요되는 시간으로 계량화할 수 있다. 본 연구에서는 소방조직에서 수행되고 있는 업무 중에 범용업무를 모두 익히는데 소요되는 시간을 설문을 통해 추산하였다. 신임소방사가 범용업무를 숙련시키는데 소요되는 기간은 12년 5월로서 평균적으로 소방장 1년 9월차에 해당되는 것으로 추산되었다.

조선 산업에서의 정반배치 계획시스템 개발의 효율화에 관한 연구

  • 박주호;박주철
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 2001년도 추계학술대회 논문집
    • /
    • pp.283-285
    • /
    • 2001
  • The most work-space invest much time and labor for optimal arrangement. The work-plates of the work-space should be arranged, processed and assembled under the restricted work space. The optimal arrangement under the terms of a restriction arrange the maximum work-plates in appointed work-space. It's the central aim. The work-plates arrangement scheduling of the most work-space are achieved through the experience of the planner. Like this, if the work-plates arrangement is worked by hand, there spend much time for the training planner. And the burden of the personnel expenses occur for using the master worker, also there are dangerous factors to be able to bring the bottleneck circumstance for the process planning, because the quick work planning does not accomplish. With such problems, the biggest problem is inferior the value of the plan. For solved the such problem of hand-operating, some work-spaces developed and used the work-plate arrangement scheduling system for the special quality of themselves. This paper make research into a plan to develop the work-plate arrangement scheduling system efficiently.

  • PDF

일학습병행 공동훈련센터 전담인력 조직성과 진단 및 분석 (Analysis of Organizational Performance of Employees of the Work-Learning Dual System Training Center)

  • 김태성;민준기
    • 실천공학교육논문지
    • /
    • 제15권1호
    • /
    • pp.199-208
    • /
    • 2023
  • 기존의 일학습병행 사업 성과 분석은 주로 거시적 차원에서 제도 자체의 효과성을 진단하는 방향으로 전개되어 왔다. 본 연구에서는 일학습병행의 운영 주체 관점에서 공동훈련센터 전담인력의 조직성과에 초점을 둔 진단조사를 시행하고 그 결과를 분석하여 공동훈련센터 및 전담인력을 둘러싸고 산재하는 조직관리상의 다양한 이슈들을 확인하였다. 연구결과 특히 일학습병행 유형과 전담인력 고용형태에 따라 전담인력이 공동훈련센터를 바라보는 인식 및 태도가 차이남을 확인하였다. 일학습병행 유형 중에서는 전반적으로 IPP형 일학습병행에서 전담인력의 조직성과가 낮게 나타난 반면, 산학일체형 도제학교의 경우 상대적으로 높게 나타났다. 고용형태는 특히 프로젝트 계약직에 대한 제도적 개선의 필요성이 도출되었다.

도시가스 시설정보 관리시스템 개발 - 업무분석 및 시스템구성을 중심으로 (Development of City Gas Facilities Information Management System Work analysis and System configuration)

  • 서창완;문은호
    • Spatial Information Research
    • /
    • 제4권2호
    • /
    • pp.181-187
    • /
    • 1996
  • 본 연구의 목적은 다양한 도시하부시설물 중 도시가스를 대상으로 시설정보관리시스템 개발을 위한 효과적인 업무분석과 시스템구성을 제안하는 것이다. 이를 위해서는 도시가스의 업무파악 및 사용자의 요구사항을 시스템에 반영하였으며, 기존 시설물관리시스템의 문제점을 파악하고 체계적인 시스템 개발을 유도하였다. 본 연구의 결과 업무분석시 사용자와의 계속적인 면담과정을 통해 기존 업무를 효과적으로 전산화 시킬 수 있었으며, 경영정보시스템(MIS)과 지리정보시스템(GIS)을 통합한 SI(System Integrate)측면에서 접근하는 것이 바람직한 것으로 나타났다. 그리고 시스템 구성시에는 현재와 미래의 컴퓨터환경을 고려하여 클라이언트 서버(Client-Server)환경의 시스템 개발이 적합함을 알 수 있다.

  • PDF