• Title/Summary/Keyword: Work Schedule Type

Search Result 51, Processing Time 0.033 seconds

Determination of Work Schedule Type by Dynamic Programming (동적계획모형을 이용한 근무형태 결정)

  • 김중순;안봉근;손달호
    • Korean Management Science Review
    • /
    • v.20 no.2
    • /
    • pp.33-43
    • /
    • 2003
  • In this paper we applied dynamic programming to determining work schedule type. In dynamic programming formulation, each day during a planning horizon represents a stage for which a decision is made. The alternatives are given by work schedule types that combine regular time, overtime, additional shift, and so on. In this case, their associated return function is labor cost. The state is defined as the amount of work time allocated to stage 1, stage 2,…, and current stage. A case study for a real manufacturing company was performed to apply dynamic programming to scheduling daily work hours during a week. The case study showed that total cost of our solution derived from dynamic programming decreased by about 6% as compared with the solution obtained from the previous method.

Compliance with Recommendations on Work Schedule for Shift Nurses in South Korea

  • Lee, Jiyeon;Jeong, Ihn Sook
    • Safety and Health at Work
    • /
    • v.12 no.2
    • /
    • pp.255-260
    • /
    • 2021
  • Background: A well-designed shift schedule has been reported to have a positive effect on improving health problems associated with shift work. This study aimed to identify compliance with the 17 recommendations on work schedule (WSRs) for shift nurses and related factors. Methods: The descriptive study was conducted with 182 nurses who worked in three shifts for more than 1 year at superior general and general hospitals in three regions. Data were collected with selfadministered questionnaire and 13-week work schedule tables, and analyzed with both person- and cycle-based compliance. Results: Person-based compliance was 11.77 among 17 items in total. However, no one completely complied with WSRs of "no work on weekends" and which showed the lowest cycle-based compliance (22.3%). Compliance with some WSRs was related to hospital type, proportion of nurses in school and having standards on work schedule at institutional level. Conclusion: Compliance with WSRs of shift nurses in Korea is still unsatisfactory, and one day off after night shift and work on weekend are quite common. Hospitals should keep the standards on work schedule, monitor compliance with standards, and try to introduce modified shift systems to improve the current problems.

Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • v.14 no.3
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.

Decision of Optimum Grinding Condition by Pass Schedule Change (열간압연 스케줄변경에 따른 최적연삭조건 결정)

  • Bae, Yong-Hwan
    • Journal of the Korean Society of Safety
    • /
    • v.23 no.6
    • /
    • pp.7-13
    • /
    • 2008
  • It is important to prevent roll failure in hot rolling process for reducing maintenance cost and production loss. The relationship between rolling pass schedule and the work roll wear profile will be presented. The roll wear pattern is related with roll catastrophic failure. The irregular and deep roll wear pattern should be removed by On-line Roll Grinder(ORG) for roll failure prevention. In this study, a computer roll wear prediction model under real process working condition is developed and evaluated with hot rolling pass schedule. The method of building wear calculation functions for center portion abrasion and marginal abrasion respectively was used to develop a work roll wear prediction mathematical model. The three type rolling schedule are evaluated by wear prediction model. The optimum roll grinding methods is suggested for schedule tree rolling technique.

A Preliminary Research for Developing System Prototype Generating Linear Schedule (선형 공정표를 생성하는 시스템 프로토타입 개발을 위한 기초 연구)

  • Ryu, Han-Guk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.1-8
    • /
    • 2011
  • Linear scheduling method limits to present works of work breakdown structure as a form of lines and was often developed manually. In other words, linear schedule could not utilize activity, work breakdown structure, and etc. information of network schedule such as CPM(Critical Path Method) and has been used only for reporting or confirming construction master plan. Therefore, it is necessary to develop system which can automatically generating the linear schedule based on the network schedule having many accumulated and useful construction schedule information. Thus, this research has an effort to establish data process model, data flow diagram, and data model in order to make linear schedule. In addition, this research addresses the system solution structure, user interface class diagram and logic diagram, and data type schema. The results of this paper can be used as a preliminary research for developing linear schedule generating system prototype by utilizing the network schedule information.

Application of Linear Schedule Chart for Schedule Management of Linear Construction Project (선형시설물 공정관리 활용을 위한 선형공정표 활용 시스템 구축 방안)

  • Lee, Jaehee;Kang, Hyojeong;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.2
    • /
    • pp.13-23
    • /
    • 2023
  • Unlike building construction projects, where the activity is repeatedly carried out in a limited area, civil engineering projects such as roads and railroads are carried out in a linear type in a horizontal working space over several tens of kilometers. Each activity is managed with a station number that has a unit of distance from the starting point to the end point. For this reason, since the work location information of the activity is a major management factor, the Gantt chart system that expresses only schedule information may have limitations. In this study, authors propose a method for constructing a linear schedule chart that can simultaneously express schedule information indicating the start and finish dates and location information indicating the start and end positions of each activity, and develop a system for generating a linear schedule chart. In the study, the coordinate axes of the linear schedule chart consisted of distance and date values on the X and Y axes, respectively, and each activity was expressed as a symbol that can infer the type of work to increase the visibility of the linear schedule chart compared to the simple bar chart method. The linear schedule chart generation system was reviewed for practical applicability by utilizing the actual schedule data of bridge structures in a railroad project.

A Study on the Nurse Scheduling Optimization Model for Nurse Needs-Type Scheduling Automation System

  • Song, Mi-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.3
    • /
    • pp.57-64
    • /
    • 2020
  • Today, with the development of information technology, hospitals are actively researching hospital information systems that are not limited by time and space to integrate mobile computing technology into the medical field to manage the bulk data of medical information. Nevertheless, most hospitals still spend a lot of time and effort creating manual schedules. In this paper, we studied an optimization model for organizing nurses' shift work and constructed an automated nurse-type job organization system. For nurses working in S hospital, information data, requirements and constraints of nurses were constructed. By applying this, we proposed an optimized scheduling method and built a web-based platform used by head nurses and a mobile app platform used by general nurses to enable real-time interchange and sharing around web servers. Therefore, through the developed nurse needs type automated system, the head nurses will increase the convenience of the nurses to organize the work every month, and general nurses will help them to work more accurately through personal schedule management. It is also expected to increase work efficiency by sharing work schedules among nurses.

Optimal Period by Calculating and Appling Correction Factor based on Setting of Non-Working Days of Construction Projects (건설공사의 작업불능일 기준설정에 의한 보정계수 계산 및 적용을 통한 최적공기 산정)

  • Lee, Pil-Yoon;Lee, Seong-Won;Byun, Yo-Seph;Cho, Choong-Yeun;Lee, Min-jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.669-676
    • /
    • 2018
  • Schedule management in construction work is an important step for determining the construction period. On the other hand, there is a difference between the planned schedule and execution schedule because the estimation and calculation of Non-Working days, in which possible at the design stage is not performed properly. This paper proposes a method for estimating the working days by analyzing characteristics of the major work type and estimating the Non-Working days reflecting the Chuseok and New Year Holidays, which is the closest method to the actual work in the schedule planning. By applying the correction factor of the existing method and the improved method for the same construction in the same site, improved method was reduced by 22 days (9.1%) based on the actual working days. The importance of schedule management was confirmed as an example by comparing the data before and after the application of the standard (plan). These results show that the schedule delays, which are caused by the inconsistency between actual working days calculation that had been practiced conventionally and the working days on the schedule table, can be prevented. In addition, it will help to establish a schedule plan that is closer to reality.

The Success Factors of Scheduling Using the TACT Technique in Wall Type Apartment House Construction (벽식(壁式) 아파트의 택트공정(工程)계획의 성공요인 분석에 관(關)한 연구(硏究))

  • Kim Joon-Ho;Kim Gwang-Hee;Cho Hyung-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.79-86
    • /
    • 2006
  • Recently, the construction companies show lots of interest in reducing the construction duration of apartment housing project in Korea. Therefore, the purpose of this study is to investigate the success factors of scheduling using the TACT technique in wall type apartment house construction for managing the construction schedule effectively. For appling the tact scheduling technique to wall type apartment house construction, the success factors can be summarized as follows : (1) zoning the horizontal and vortical work area properly, (2) preparing the flow chart of finishing works, (3) minimizing the undefined activity like chipping off the concrete wall, (4) reordering the construction activities for keeping up the continuity of works in winter season, (5) dividing the amount of work for minimizing the delay time of any activity, etc.

소프트웨어 비용추정 모형에 관한 소고

  • Kim, In-Su;Lee, Dae-Gi
    • ETRI Journal
    • /
    • v.9 no.3
    • /
    • pp.139-156
    • /
    • 1987
  • The problems in software cost management are well known. Cost estimates are too low. Software development projects frequently have cost overruns, which are due to poor estimates. A fair amount of work have been done toward developing cost estimation models. These models vary in their outputs (e. g., total cost, manning schedule) and in the factors used to calculate their estimates. They also vary with regard to the type of formula, parameters, use of previous data, and staffing considerations. This paper will distinguish them by the type of formula they use to calculate total effort and staffing level, and will discuss enough models to demonstrate the characteristics of each model category.

  • PDF