Maintenance Staff Scheduling at Afam Power Station

  • Alfares, H.K.;Lilly, M.T.;Emovon, I.
    • Industrial Engineering and Management Systems
    • /
    • v.6 no.1
    • /
    • pp.22-27
    • /
    • 2007
  • This paper describes the optimization of maintenance workforce scheduling at Afam power station in Nigeria. The objective is to determine the optimum schedule to satisfy growing maintenance labour requirements with minimum cost and highest efficiency. Three alternative maintenance workforce schedules are compared. The first alternative is to continue with the traditional five-day workweek schedule currently being practiced by Afam power station maintenance line. The second alternative is to switch to a seven-day workweek schedule for the morning shift only. The third alternative is to use a seven-day workweek schedule for all three work shifts. The third alternative is chosen, as it is expected to save 11% of the maintenance labour cost.

A Study on the Systems Engineering Detailed Schedule for LRT Project (경량전철사업의 시스템엔지니어링활동을 위한 상세일정계획 작성방법 연구)

  • Han, Seok Youn;Kim, Joo Uk;Choi, Yo Chul;Kang, Do Hoon
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.8 no.2
    • /
    • pp.11-17
    • /
    • 2012
  • Suppliers in light rail transit project makes a systems engineering management plan(SEMP) as a top level plan which has a SEMS and SEDS as an control and monitoring means. In this paper, we analyze the international standards and some related documents, and present the directions to make the SEMS and SEDS which have WBS, accomplishments, schedule, events, person in charge. And then customize the project management tool and make SEMS and SEDS of LRT project as an example. The research results can be applied in LRT project after tailoring based on the project.

Development of a Flash-based Schedule Management Tool for Smart Devices

  • Jang, Myunghoun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.558-565
    • /
    • 2012
  • Schedule management of construction work is critical to completing construction projects within a given period of time. Many efforts have been made and multiple tools have been developed to support the management of construction projects using smart devices such as smartphones and tablet PCs. This study proposed a method for managing construction schedules via a smart device using Flash. The interactive and graphic properties of Flash enable the development of an app that can allow a field manager to manage schedules easily and efficiently. A prototype was implemented using Adobe Flex Builder, and a sample network was applied in a smartphone. It is convenient for a construction manager to manage construction schedules using the tool because Flash controls graphic components easily. In further studies, network diagrams such as CPM (Critical Path Method) should be developed and applied to the app.

Development of Rollgap Simulator and Its Application to Draft Schedule Adjustment (롤갭 시뮬레이터의 개발과 패스스케쥴 개선)

  • Ahn Jaehwan;Lee Youngho;Lee In-Woo
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2004.08a
    • /
    • pp.163-172
    • /
    • 2004
  • A fast, accurate model for calculating roll gap variables are critical to the implementation of computer based automation systems for cold rolling mills. Based on the work of Fleck and Johnson, rollgap simulator with non-circular arc model was developed using the influence function. This developed model is capable of predicting values of force, torque and slip which can be applied over the wide range of rolling conditions including cold rolling/DR/temper mill with high execution speed. Friction coefficient was obtained as a function of operation conditions through analyzing measured data. After combination of rollgap simulator with production strategy, draft schedule for No.3 RCM (Reversible Cold Rolling Mill) in Incheon works of Dongbu Steel was developed. This draft schedule will be installed in the setup computer of No.3 RCM replacing old Hitachi model.

  • PDF

Factors Affecting Patient Waiting Times at the Outpatient Pharmacy Department in a Tertiary Care Hospital (3차진료기관 외래약국 투약대기시간에 영향을 주는 요인)

  • Park, Hayoung;Han, Ok-Youn;La, Hyun-Oh
    • Quality Improvement in Health Care
    • /
    • v.1 no.2
    • /
    • pp.60-72
    • /
    • 1994
  • Background: The number of outpatients visiting large university teaching hospitals has increased drastically with the introduction of a nationwide health care insurance in 1989 and the improvement of the socio-economic status of the population. This resulted in long waiting times for services, particularly prescribed drugs, which have been patients' chief complaints. Hospitals have tried to solve the problem with limited success because their approach lacked comprehensive research. The objective of this study is to investigate associations between waiting times and variables defining a total work system. Methods: Data for the outpatient pharmacy department in a tertiary care university teaching hospital located in Seoul was analyzed to achieve the study objective. Associations of pharmacy system variables -- work load, work force, pharmacist work schedule, machine problems, and inventory control -- with mean and 99th percentile of waiting times were examined by the hierarchical stepwise regression method. Day was a unit of the analyses. Results: The regression models explained 65.8% of variance in the mean waiting time and 61.34% in the 99th percentile of waiting times. The break-down of the printer for drug envelops, Automatic Tablet Counters (ATCs), and main computer system lasted longer than 30 minutes increased the mean for 7.7 minutes, 4.5 minutes, and 7.0 minutes, respectively, and the 99th percentile for 14.8 minutes, 9.0 minutes, and 15.7 minutes, respectively. Concerning the work force, study results showed that there were significant differences in the productivity of pharmacists with work experience more than three years, one to three years, and less than one year, and showed that peak time aid work by pharmacists at job assignments other than the outpatient pharmacy, part-time pharmacists, and the installation of ATCs were effective in reducing waiting times, Finally, study findings indicated that the operational policy of work assignment and rotation schedule, supply and inventory of drugs at work tables, and readiness for undisrupted work during the work hours could have a significant effect on waiting times. Conclusion: The study results indicated that efforts to reduce waiting times for prescribed drugs should be geared toward every components of the pharmacy work system ranging from work schedule of pharmacists and supply of dugs at work tables. These findings should provide hospital managers with right directions in battling the problem.

  • PDF

Development of On -Line Work Roll Surface Monitoring System At Hot Strip Mill

  • Moon, Bae-Ho
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.53.4-53
    • /
    • 2001
  • This paper described about the system which can be inspect work roll surface for deciding a milling schedule and roll changing at hot strip mill in POSCO. Developed system consists of CCD camera, Xenon lamp with fiber bundle and mechanical control part. The water probe build up water pole between head of probe and roll surface to acquisite a good image from a work roll surface under the bad environment with steam, cooling water and high temperature. This system is possible to monitor a work roll surface of about 12${\times}$9mm. We have shown the validation of the developed system which can monitor the evolution of degradation on work roll surface.

  • PDF

Implementation of Microbial Identification Query System for Laboratory Medicine (진단검사의학을 위한 세균동정 쿼리시스템의 구현)

  • Koo Bong Oh;Shin Yong Won
    • Journal of the Korea Society of Computer and Information
    • /
    • v.10 no.1 s.33
    • /
    • pp.113-124
    • /
    • 2005
  • The work of investigation in the laboratory medicine includes various kinds of investigations and microbes and it is too complicated to draw needed results in time. So, we aim to improve work performance of the laboratory medicine. For this study, we implemented the scheduling system in microbe investigation using agent environment and the workflow management system to manage the schedule of investigation, and the query system to check the schedule. And preliminary report and final report of microbe investigation can be announced automatically using agent. The scheduling system implemented could identify the lack or waste of resources and thus enable efficient management and distribution of resources. The query system could check the schedule and retrieve the Processing status in short time, enabled the automated report, and reduced possible interrupts and the delay of work that can be occurred in confirming process. It also enables users to access from local and remote sites. Also, this system can reduce the conflicts among People that may occur in unexpected situations because it enables doctors to confirm those situations such as the malfunction of instrument and the lack of agar or reagent, and the efficiency of work process can be expected.

  • PDF

A study on progress measurement method of a construction project (건설공사의 진도율 산정 방법에 관한 연구)

  • Park se-Jung;Kim Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.450-453
    • /
    • 2003
  • It is very important to examine and compare initial plan with earned value repeatedly in construction. For this purpose, progress measurement, which reflects the actual progress correctly, is required and it is necessary that accurate field data should be offered. To measure the progress, the entire project mutt be divided into unit works that have an accurate scope of work, and required information must be distributed to the all parties. Under the circumstances of domestic construction industry which focus on the specifications, progress measurement needs to reflect the information of schedule as well as cost that includes the quantity of unit work and construction expenses. Therefore this research proposes weighted method of progress measurement based on the information of cost and schedule.

  • PDF

Time Shortening of Structural Framework of High-rise Apartment Housing for the Urgent Project Area: Focused on the Cases of Insufficient Time or Delayed Projects

  • Bang, Jong-Dae;Lee, Do-Heun;Chun, Young-Soo;Park, Ji-Young;Lee, Bum-Sik;Jun, Myoung-Hoon
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.355-365
    • /
    • 2011
  • Construction duration is very important as a factor which comprises three axises of construction management with quality and cost in construction project. In general project condition, construction duration is optimized while minimizing construction cost and securing required quality. However, in case of insufficient project time duration or delayed projects, project progress management is different from those of normal projects. These project areas need solutions to complete work within a given completion day. To time shortening the current duration of each typical floor of structural framework in apartment construction is investigated, and a basic time schedule planning for typical floor of structural framework in normal projects is planned. This study proposed 3 ways for time shortening of urgent project or insufficient construction duration project. Also, This study proposed detailed time shortening method and technical solution conditions while time is shortened.

Resource and Sequence Optimization Using Constraint Programming in Construction Projects

  • Kim, Junyoung;Park, Moonseo;Ahn, Changbum;Jung, Minhyuk;Joo, Seonu;Yoon, Inseok
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.608-615
    • /
    • 2022
  • Construction projects are large-scale projects that require extensive construction costs and resources. Especially, scheduling is considered as one of the essential issues for project success. However, the schedule and resource management are challenging to conduct in high-tech construction projects including complex design of MEP and architectural finishing which has to be constructed within a limited workspace and duration. In order to deal with such a problem, this study suggests resource and sequence optimization using constraint programming in construction projects. The optimization model consists of two modules. The first module is the data structure of the schedule model, which consists of parameters for optimization such as labor, task, workspace, and the work interference rate. The second module is the optimization module, which is for optimizing resources and sequences based on Constraint Programming (CP) methodology. For model validation, actual data of plumbing works were collected from a construction project using a five-minute rate (FMR) method. By comparing actual data and optimized results, this study shows the possibility of reducing the duration of plumbing works in construction projects. This study shows decreased overall project duration by eliminating work interference by optimizing resources and sequences within limited workspaces.