• Title/Summary/Keyword: Work Schedule

Search Result 596, Processing Time 0.023 seconds

Apartment house project cost schedule for integrated management BIM-based BoQ application plan (공동주택 프로젝트 비용일정통합 관리를 위한 BIM 기반 BoQ 구축 및 활용 방안)

  • Zheng, Lianyi;Kim, Woong-Gi;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.11 no.2
    • /
    • pp.1-16
    • /
    • 2021
  • Since entering the 21st century, the construction industry has developed faster and faster, and more and more technologies have been applied in the construction industry. BIM technology (Building Information Modeling) was born in this environment. The application of BIM technology can greatly improve the efficiency of cost management and help achieve the goal of cost management. But through BIM to realize project cost management, there is still no good solution. In order to solve this problem, this paper puts forward the concept of WBS structure applied to construction projects by studying the BoQ (Bill of Quantities) list based on BIM, and proposes the numbering method of the structure. The WBS (Work Breakdown Structure) structure proposed in this paper divides more than 5000 cost objects into 133 projects according to the type of work and project schedule. This structure helps to realize the application of BIM in project cost management. Although this article has studied more than 5000 data of three projects, it does not think that it can cover all cost objects in the existing construction industry. The purpose of this article is to propose a solution for cost and Process Control using BIM-based BoQ data.

Design and Implementation of a Project Work Unit-based Scheduling Application (프로젝트 작업 단위 기반 일정 관리 애플리케이션의 설계 및 구현)

  • Bomin Kim;Minyoung Kim
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.6
    • /
    • pp.1173-1178
    • /
    • 2023
  • In modern society, there is a tendency to emphasize efficiency and lead to detailed planning of team projects and individual tasks within organizations. In a 24-hour routine, the ability to use time effectively is considered an indicator of conscientiousness, and people try to imitate planned and organized people and utilize various systems to manage their daily lives. The reason why you want to perform a given task efficiently is because it affects the success or failure of the project by completing the task within a set period of time. Neglecting the project schedule is considered a major risk that threatens a successful outcome. This applies not only to large-scale organizational projects but also to individual life, and utilizes a variety of schedule management tools that emphasize time-based efficient management. In project management, it is necessary to carefully understand the detailed work progress rather than simply based on Today. In this paper, we propose an Android application that can manage schedules by accessing the user's project in units of tasks rather than dates, and introduce its implementation. The application we implemented in this paper can manage the project's goals and schedule by registering the project to which the user belongs. In addition, it provides the ability to approach work efficiently by visualizing the progress of the entire project or individual goals. As a result, users can use the application we propose in this paper to focus on their projects and manage schedules by task, thereby improving the overall efficiency of the project.

Visualization and Optimization of Construction Schedule Considering the Geological Conditions in the Complicated Underground Cavern (지하비축기지 건설시 지질조건을 고려한 건설공정의 가시화와 최적화 사례)

  • Choi, Yong-Kun;Park, Joon-Young;Lee, Sung-Am;Kim, Ho-Yeong;Lee, Hee-Suk;Lee, Seung-Cheol
    • Tunnel and Underground Space
    • /
    • v.19 no.3
    • /
    • pp.167-173
    • /
    • 2009
  • Underground storage cavern is known as the most complicated underground project because of the complexity of construction schedule, tunnel size, and geological problems. In order to optimize the construction schedule of underground storage cavern, two up-to-date technologies were applied. The first technology was 3 dimensional visualization of complicated underground structures, and the second was 4 dimensional simulation considering construction resources, geological conditions and construction schedule. This application case shows that we can achieve optimized construction schedule in the ways to optimize the number of work teams, fleets, the sequence of tunnel excavation, the commencement time of excavation and the hauling route of materials and excavated rocks. 3 dimensional modeling can help designer being able to understand the status of complicated underground structures and to investigate the geological data in the exact 3 dimensional space. Moreover, using 4 dimensional simulation, designer is able to determine the bottle neck point which appear during hauling of excavated rocks and to investigate the daily fluctuation in cost.

Implementation of a Travel Route Recommendation System Utilizing Daily Scheduling Templates

  • Kim, Hyeon Gyu
    • Journal of the Korea Society of Computer and Information
    • /
    • v.27 no.10
    • /
    • pp.137-146
    • /
    • 2022
  • In relation to the travel itinerary recommendation service, which has recently become in high demand, our previous work introduces a method to quantify the popularity of places including tour spots, restaurants, and accommodations through social big data analysis, and to create a travel schedule based on the analysis results. On the other hand, the generated schedule was mainly composed of travel routes that connected tour spots with the shorted distance, and detailed schedule information including restaurants and accommodation information for each travel date was not provided. This paper presents an algorithm for constructing a detailed travel route using a scenario template in a travel schedule created based on social big data, and introduces a prototype system that implements it. The proposed system consists of modules such as place information collection, place-specific popularity score estimation, shortest travel rout generation, daily schedule organization, and UI visualization. Experiments conducted based on social reviews collected from 63,000 places in the Gyeongnam province proved effectiveness of the proposed system.

Influence of Consecutive Night-Shift Work and Working Time on Insomnia among Hospital Nurses (병원 간호사의 연속 야간 교대근무와 근무시간이 불면증에 미치는 영향)

  • Shin, Seunghwa;Kim, Su Hyun
    • Korean Journal of Occupational Health Nursing
    • /
    • v.29 no.2
    • /
    • pp.133-139
    • /
    • 2020
  • Purpose: This study aimed to identify the influence of consecutive night-shift work and working time on insomnia among hospital nurses. Methods: A descriptive correlational research designutilizing secondary data analysis was adopted. Data on consecutive night-shift work, working time, and insomnia were collected from 64 hospital nurses using a Fitbit activity tracker and questionnaires, and analyzed using hierarchical logistic regression. Results: Consecutive night-shift work for more than three days had a significant influence on insomnia among hospital nurses. Weekly working hours also accounted significantly for the variance in insomnia, exceeding the influence of consecutive night-shift work. Conclusion: Development and implementation of proper schedules to control consecutive night-shift work and working time is important to alleviate insomnia among hospital nurses.

A Study on the Nurse Scheduling Optimization Model for Nurse Needs-Type Scheduling Automation System

  • Song, Mi-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.3
    • /
    • pp.57-64
    • /
    • 2020
  • Today, with the development of information technology, hospitals are actively researching hospital information systems that are not limited by time and space to integrate mobile computing technology into the medical field to manage the bulk data of medical information. Nevertheless, most hospitals still spend a lot of time and effort creating manual schedules. In this paper, we studied an optimization model for organizing nurses' shift work and constructed an automated nurse-type job organization system. For nurses working in S hospital, information data, requirements and constraints of nurses were constructed. By applying this, we proposed an optimized scheduling method and built a web-based platform used by head nurses and a mobile app platform used by general nurses to enable real-time interchange and sharing around web servers. Therefore, through the developed nurse needs type automated system, the head nurses will increase the convenience of the nurses to organize the work every month, and general nurses will help them to work more accurately through personal schedule management. It is also expected to increase work efficiency by sharing work schedules among nurses.

Development of Time-Cost Trade-Off model Based on Emergency Construction Work Scenario (돌관공사 시나리오 기반 공기-비용 최적화 모델 개발)

  • Lee, Sihyun;Lee, Seounghyun;Son, Jaeho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.43-51
    • /
    • 2016
  • Recently, the cost of construction projects has escalated due to a significant increase in size and complexity. Many construction projects have failed to meet their originally intended project deadline due to various factors such as weather, labor supply, equipment, procurement, accidents, etc. Consequently, emergency construction work scenario has to be implemented in order to shorten the duration and satisfy the original estimated schedule. However, many critical decisions in emergency scenario rely solely on the experience of a construction manager. Thus, this paper proposes TCTO optimization model to decide the most effective alternative out of various working scenarios which are generated by the combination of work group and work time. The developed TCTO model provides the optimum schedule that satisfies the practical constraints. Future research could involve the integration of resource leveling with the proposed model. This would make the model more versatile.

The Problem and Improvement Solution Regarding the Inquiry of Sample (검체 문의에 관한 문제점 및 개선방안)

  • Yang, Joon-Ho;Seo, Jung-Mi;Song, Hoon-Gang;Kim, Eun-Jung;Kim, Chang-Ho
    • The Korean Journal of Nuclear Medicine Technology
    • /
    • v.13 no.3
    • /
    • pp.193-195
    • /
    • 2009
  • Purpose: The work flow of international hospital's laboratory consists of rapid test and result report at the present day. However, the frequent inquiry of sample, which cause affairs to delay and efficiency to Lower, affects medical examination. In order to promote work's efficiency, we should improve the problem and make work smooth between a laboratory, outs and ward. Materials and Methods: This study runs as follows. First, Investigating test result, test schedule, test receipt, quick result, etc through the activity required from September to November 2007 about the inquiry of sample. After analysis of the problem in December, remaking the test schedule for improvement solution and reporting it to outs and ward. When the result is retest and dilution, we directly fill in a result space with the result situation of the patient to let them know beforehand. We also, prevent the omission of the result through checking the sample list and discriminate in vivo from in vitro by changing the laboratory's telephone number. We have improved the problem about the inquiry of sample through valuation and analysis since the improvement activity from January to March 2008. Result: The case about the frequent inquiry of sample has reduced by 57.8%. this improvement activity indicated that p-value<0.05 was statistically significant through paired t-test. This activity make study smooth and we rapidly report the result. Conclusion: By reducing the case regarding the inquiry of sample, work discontinuation, and concentration reduction, the work efficiency was increased.

  • PDF

Domestic Application Plan of Fatigue Risk Management System by Air Traffic Controller (항공교통관제사의 피로위험관리시스템 도입에 따른 국내 적용 방안)

  • Lee, Young-Jong
    • Journal of Advanced Navigation Technology
    • /
    • v.23 no.6
    • /
    • pp.501-506
    • /
    • 2019
  • This paper presents a prescriptive alternative for establishing a FRMS suitable for us based on scientific data ahead of the introduction and implementation of the FRMS for air traffic controllers in order to meet the International Civil Aviation Organization (ICAO) international standards. I would like to present. Therefore, we confirmed the operation of each air traffic control agency against the current domestic operating standards, and compared and reviewed the operation methods and standards of air traffic control agencies in each country. The controller in Korea defines 10 hours of working hours per day, 8 hours of minimum breaks, and 40 hours per week. Currently, in the case of air traffic control agencies, the daytime and the appropriate working hours are used in the daytime, but in the nighttime, the average time exceeds 5.9 hours. In the case of 40 hours a week, they work an average of 15.7 hours overtime. By adjusting the nighttime work time, this work can be solved by diversifying the form of the worker's input method according to the personal schedule rather than the two-day (day / night) method, as well as the appropriate nighttime time distribution by supplementing the personnel.

A Study on Family Life and Work of Married Female Home-Based Workers - the comparison with married female out-of-home workers - (기혼여성 재택근무자의 가정 및 직장생활에 관한 연구 - 직장근무자와의 비교를 중심으로 -)

  • 이수진;이기영
    • Journal of the Korean Home Economics Association
    • /
    • v.39 no.3
    • /
    • pp.47-66
    • /
    • 2001
  • The purpose of this study is to find the difference of household/work characteristics, family life satisfaction, and work satisfaction between home-based workers and out-of-home workers. The data of this study was collected from 230 married womens(home-based worker : 103 cases out-of-home worker : 127 cases) living in seoul. The major findings of the study are as follows. 1) Home-based worker's consumption expenditure structure, wive's housework time, schedule flexibility and degree of interruption, work loads were significantly higher than out-of-home workers. 2) Home-based worker's average monthly wage of her own and work time were significantly lower than out-of-home jokers. 3) Home-based worker's child care satisfaction and time use satisfaction were significantly higher than out-of-home workers. Out-of-home worker's self-fulfillment satisfaction, satisfaction of relation with supervisor, job stability satisfaction, work time satisfaction was significantly higher than home-based workers.

  • PDF