• Title/Summary/Keyword: Work Priority

Search Result 500, Processing Time 0.031 seconds

A Study on the Development Priority of Automation Technology for Architectural Planning and Design - Based on the Survey Architectural Design Office - (건축 기획설계 자동화 기술개발 우선순위 도출에 관한 연구 - 건축설계 사무소 실무자 설문 조사에 기초하여 -)

  • Moon, Seong-Wan;Yang, Seung-Won;Kim, Sung-Ah
    • Journal of KIBIM
    • /
    • v.13 no.4
    • /
    • pp.1-12
    • /
    • 2023
  • In Korea, there are many attempts to automate architectural design tasks, focusing on government-led national R&D projects and private operators, in order to enhance global competitiveness and productivity of the building service industry. However, according to a survey of architectural design office practitioners, only 25% (9 out of 37) have used it, suggesting that there are fewer cases of practical use in the field compared to research and investment in automation technology development, and there are discrepancies between automation and technology development items required in the field. In this study, the priority of automation of planning and design work of architectural design office practitioners is derived, and a comparative analysis is conducted with domestic architectural design automation service items based on the priority. A survey was conducted on practitioners of domestic architectural design offices to derive automation priorities for 19 items of architectural planning and design work. Based on the derived priorities, the degree of reflection of the working-level automation needs of domestic services was confirmed by comparing them with the domestic architectural planning and design automation service items. As a result, it was confirmed that domestic architectural planning and design automation services did not properly reflect the priority of planning and design work automation of architectural design office practitioners. This suggests that it is necessary to reflect the priorities derived in this study in technology development in order to increase the cases of practical use of the automation technology in the working environment and improve the productivity of service.

Performance Analysis of ATM Switch with Priority Control Mechanisms (우선순위제어기능을 가진 ATM스위치의 성능 분석)

  • 장재신;신병철;박권철
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.18 no.8
    • /
    • pp.1190-1200
    • /
    • 1993
  • In this work, the performance of both delay sensitive traffics and loss sensitive traffics of the output buffered ATM switch with priority control mechanisms has been evaluated. We choose the partial buffer sharing mechanism as the loss priority control mechanism and the HOL(Head Of Line) priority control mechanism as the time priority control mechanism. We model loss sensitive traffics with Poisson process and delay sensitive traffics with MMPP. With loss priority control, it is confirmed that loss probability of loss sensitive traffice decreases when the loss priority control mechanism is chosen. With time priority control, it has also been confirmed that mean cell delay of delay sensitive traffics decreases when the HOL priority control mechanism is used. From this analysis, It has been confirmed that the requirements of QOS for both loss sensitive and delay sensitive traffics can be satisfied in the ATM switch by combining both the loss priority control mechanism and the HOL priority control mechanism.

  • PDF

A Study on the Priority Analysis of Work Delay Factors in Steal-frame Work using FMEA (FMEA를 활용한 철골공사 작업지연요인의 중요도에 관한 연구)

  • Lee, Hyun-Chul;Lee, Jae-Hong;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.91-101
    • /
    • 2009
  • The factors of uncertainty such as work delay could cause many problems, for example, increase of construction cost and terms of work, and the deterioration of quality. Because of these, the uncertainty risk is regarded as an important management factor to obtain the success of construction project. So, the systematic management plan about the uncertainty factors is needed because it plays an important role in the completion of entire project. And also analysis of some factors which can cause the work delay can be one way of improving construction project's certainty and making it competitive. In this reason, we have to make an effort to set a priority based on analysis of quantitatively numerical value about work delay factors to manage them effectively. Thus, this study aims to suggest the basic data for the effective management and prevention of work delay in steel-frame work which is progressive actively now, along with increasing of demand of high-rise buildings by analyzing each reasons of work delay factors and also by suggesting important management factors that are coded according to each construction work using FMEA method which could give a data about the importance of work delay factors through quantitatively numerical value.

A Study on the Priority Ranks to Improve Work Environments in the Worker's Point of View (작업환경 소음 개선을 위한 작업자 관점의 우선순위 파악에 관한 연구)

  • Kim, Hwa-Il
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.15 no.3
    • /
    • pp.202-212
    • /
    • 2005
  • This study was aimed at rating the existing work environment noise components and alternatives in point of worker's view. To answer the purpose, AHP(Analytic Hierarchy Process) method is adopted in this research. Based on the AHP method, this research abstracts a mathematically rigorous noise components and alternative's weights and proven process for priority and decision-making. By reconstructing complex hearing conservation programs to a series of pair-wise comparisons, and then synthesizing the results, this study not only helps establishments of noise countermeasure, but also provides a clear rationale for noise alternatives. The result of this study is summarized as follows; 1) Job satisfaction index and noise identification index are 63, 56 respectively. 2) Noise level(15.7%), frequency(14.1%) and directivity(13.6%) are main reasons in worker's ground. 3) There are some difference between the estimation of worker's identification and that of work sites. 4) Low noise machine(14.7%), enclosure(13.2%) and shielding(9.6%) are chosen for noise protection method by workers. 5) Noise environment improvement should be focused on noise source rather than personal protection. 6) By the AHP method, noise source countermeasure have a key role at work environments.

FMS 스케쥴링을 위한 Priority 함수의 자동 생성에 관한 연구

  • 김창욱;신호섭;장성용;박진우
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1997.04a
    • /
    • pp.93-99
    • /
    • 1997
  • Most of the past studies on FMS scheduling problems may be classified into two classes, namely off-line scheduling and on-line scheduling approach. The off-line scheduling methods are used mostly for FMS planning purposes and may not be useful real time control of FMSs, because it generates solutions only after a relatively long period of time. The on-line scheduling methods are used extensively for dynamic real-time control of FMSs although the performance of on-line scheduling algorithms tends vary dramatically depending on various configurations of FMS. Current study is about finding a better on-line scheduling rules for FMS operations. In this study, we propose a method to create priority functions that can be used in setting relative priorities among jobs or machines in on-line scheduling. The priority functions reflect the configuration of FMS and the user-defined objective functions. The priority functions are generated from diverse dispatching rules which may be considered a special priority functions by themselves, and used to determine the order of processing and transporting parts. Overall system of our work consists of two modules, the Priority Function Evolution Module (PFEM) and the FMS Simulation Module (FMSSM). The PFEM generates new priority functions using input variables from a terminal set and primitive functions from a function set by genetic programming. And the FMSSM evaluates each priority function by a simulation methodology. Based on these evaluated values, the PFEM creates new priority functions by using crossover, mutation operation and probabilistic selection. These processes are iteratively applied until the termination criteria are satisfied. We considered various configurations and objective functions of FMSs in our study, and we seek a workable solution rather than an optimum or near optimum solution in scheduling FMS operations in real time. To verify the viability of our approach, experimental results of our model on real FMS are included.

  • PDF

Comparison among with Nursing Records, Nursing Intervention Priority Perceived by Nurse and Nursing Intervention Frequency of General Surgery Department (일반외과 간호기록에서의 중재, 지각한 간호중재의 중요도 및 수행 빈도)

  • Choi, Eun-Hee;Seo, Ji-Yeong
    • Korean Journal of Adult Nursing
    • /
    • v.21 no.3
    • /
    • pp.349-354
    • /
    • 2009
  • Purpose: The purpose of this study was to determine core nursing intervention in nursing records and to compare perceived nursing intervention priority and nursing intervention frequency of general surgery department. Methods: Subjects were 70 nurses who work in the general surgery department. Data was collected using a nursing intervention classification and analyzed by frequency and mean. Results: The most frequent nursing interventions of nursing records were orderly risk management, coping assistance, tissue perfusion management, skin/wound management and nutrition support. Important nursing interventions were tissue perfusion management, respiratory management, electrolyte acid-base management, elimination, peri-operative care. The most frequent nursing interventions were drug management, peri-operative care, risk management, tissue perfusion management, patient education. Conclusion: This study found that nursing records were different from intervention priority and nursing frequency. So further study is needed for finding focused intervention of specific subjects and differences with priority of nursing and frequency of nursing.

  • PDF

The Study on the Risk Assesment of Formwork (거푸집공사 위험성 평가에 관한 연구)

  • 고성석;오준호
    • Journal of the Korean Society of Safety
    • /
    • v.17 no.3
    • /
    • pp.96-101
    • /
    • 2002
  • The object of risk assesment is to prevent the accident from arising. The main reason for risk assesment of construction work is to determine priority order of improvement plan about risky work. Formwork is a complicated process that determines the total duration of apartment construction, and occupies 10∼15% of total construction expense, and 17% of serious accidents occur during formwork. So, formwork occupies very importment roles in work sites, economical efficiency and safety. We need to identify the work type with a high risk of accidents, and to establish suitable safety counterplan and implement intensive safety management.

Analysis of Influence of Work and family life priority and Recognition Difference of Work-Family Reconciliation Policy on Satisfaction of Working Condition Using Path Analysis Model : Focused on Industrial Groups Showing Gender Differences (일·가정생활 우선도와 일·가정 양립제도에 대한 인식차이가 근무 만족도에 미치는 영향력 분석 - 성별 차이를 보이는 산업군을 중심으로 -)

  • Park, Min Jung
    • Journal of Family Resource Management and Policy Review
    • /
    • v.23 no.3
    • /
    • pp.43-74
    • /
    • 2019
  • The purpose of this study is to analyze the effect of perceptions of work and family life on employee job satisfaction and to form a policy approach that contributes to the enhancement of worker satisfaction. In particular, we wanted to analyze how the characteristics of each variable appeared in industry groups with different gender ratios of workers. A notable point of the study was that the respondents who answered that work and family had similar importance were satisfied with their working conditions. In addition, it was found that the higher an employee's evaluation of the work-family reconciliation policy, the higher the employee's satisfaction with their working conditions. As a result of a path analysis, it was found that the most male-dominant industry was manufacturing, and the most female-dominant industry was health and social welfare. In the case of respondents who were employed in the most-male dominant industry, the degree of an employee's understanding of the work-family reconciliation policy recognition, rather than the relative priorities of work and family life, had a greater effect on job satisfaction. On the other hand, respondents who were employed in the most-female dominant industry confirmed that their level of education was highly related to the degree of institutional recognition.

GENERAL FORMULAS OF SOME VACATION MODELS

  • Lim, Jong-Seul
    • Journal of applied mathematics & informatics
    • /
    • v.26 no.1_2
    • /
    • pp.389-393
    • /
    • 2008
  • This paper describes a single-server queue where the server is unavailable during some intervals of time, which is referred to as vacations. The major contribution of this work is to derive general formulas for the additional delay in the vacation models of the single vacations, head of line priority queues with non-preemptive service, and multiple vacations and idle time.

  • PDF

A Study on the construction quality infra and it's core confidency priority for enhancing construction certification system (건설공사 품질인증시스템 향상을 위한 품질인프라 및 핵심역량 도출에 관한 연구)

  • Lee, Kab-Soon;Bae, Young-Ju
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.4
    • /
    • pp.189-208
    • /
    • 2017
  • This study is for figuring out major components of construction quality infrastructure and suggesting improvement plan by benchmarking global best practice model and analyzing gap between the model and sample practice. Based on improvement plan, researcher could derive major characters and components of construction quality infrastructure, and also about the priority among core competency components of construction quality experts. The result showed that the 'human resource' was ranked the best priority followed by 'method' 'environment', 'equipment' among major characters and components of construction quality infrastructure. Also, for core competency components of construction quality experts, 'number of years in work places' was the best priority, and the 'professional knowledge on engineering' was another priority ranked. Far from general perception on competency components, 'academic education' ranked the last. It may allude that the current education system in this country is not effective in developing competency of quality engineers. In summary, this study shows professionalism of quality engineer is the most important thing in all the components.