• Title/Summary/Keyword: Work Priority

Search Result 500, Processing Time 0.025 seconds

Prioritization of Potential Technology for Establishing a Safe Work Zone Environment (안전한 도로 공사구간 환경 구축에 필요한 기술의 우선순위 선정)

  • Kim, Jin Guk;Yang, Choong Heon;Yun, Duk Geun
    • International Journal of Highway Engineering
    • /
    • v.17 no.6
    • /
    • pp.117-126
    • /
    • 2015
  • PURPOSES : This study prioritizes potential technology for establishing a safe work zone environment on roadways. We consider almost all conceivable technologies that enable mitigation of unexpected accidents for both road workers and drivers. METHODS : This study suggests a methodology to set the priority of potential technology for establishing a safe work zone environment by using the analytical hierarchy process (AHP). For this purpose, the AHP structure was first developed. Thereafter, a web-based survey was conducted to collect experts' opinions. Based on the survey results, weights associated with the relevant criteria of the developed structure were estimated. With the consistency index (CI) and consistency ratio (CR), we verified the estimated weights. In addition, a sensitivity analysis was performed to confirm whether the estimated weights were reliable. We finally proposed the priority for potential technology for establishing a safe work zone environment on roadways. RESULTS : In the first level, safety technology has the highest priority, and real-time information delivery for work zone, hazard warning for drivers, and temporal automated operation for traffic facilities were selected in the second level of hierarchy. CONCLUSIONS : The results imply that establishing the priority will be useful to establish a future road map for improving the work environment for road workers and drivers by employing appropriate protection facilities and developing safety systems.

An Analysis of Policy Priority for Work-Related Injury & illness and Investment Losses of Workplace Safety (작업관련성 손상·질병 발생과 손실비용에 따른 예방정책 우선순위 연구)

  • Park, Kyoung-Don;Yi, Kwan-Hyung
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.4
    • /
    • pp.7-16
    • /
    • 2013
  • As workplace incidents has been being declining in Korea, there is criticism of the effectiveness of occupational safety policy implementation. It is unknown that which policy target group needs to be targeted to yield effective injuries prevention. The purpose of this paper is to analyze and reveal the policy intervention group with a high priority in terms of industrial incident prevention and the related investment cost. A Policy Priority Model(PPM) is composed of 6 indicators regarding influences of both the incident reduction and the cost reduction. Z-score analyses are used to confirm the high policy priority area or policy target group. Overall, workplace with worker below 50 persons, construction site with the sales of more than a hundred million won, workplace with relatively small percentage of female employees and relatively higher percentage of older worker should be prioritized to reduce workplace injuries. This paper provides an analytic way that can be used to decide the policy priority workplace in order not only to reduce work-related injuries&illnesses and the related investment cost but to further lessen the related societal costs.

A Study on Work Values of Hospital Employees (병원근로자의 근로가치관에 대한 연구)

  • 윤방섭;이해종
    • Health Policy and Management
    • /
    • v.10 no.1
    • /
    • pp.95-110
    • /
    • 2000
  • The purpose of this study is to evaluate work values of hospital employees. Their work values was compared with that of other corporate's employees or among that of specialties in hospital. It was surveyed to 893 persons; 164 in hospital and 709 in others. The work values of hospital employees are similar to that of other corporate's employees. But they have first priority to working environment, and emphasize monetary incentive much more than hierarchical development. There are some gap in work value between age groups in hospital, different from other corporate. That means hospital manager need to development the more developed work value in hospital. The work values are different in monetary incentive, hierarchical development, safety, working environment, creativity among specialties in hospital. The more special employees emphasize much more to monetary incentive, hierarchical development, working environment and the less special employees have priority to safety work value. Specially, because the hospital managers want to have safety than creativity, it must to make some changing program of work value for advance of future hospital.

  • PDF

Development of Potential-Function Based Motion Control Algorithm for Collision Avoidance Between Multiple Mobile Robots (포텐셜함수(Potential Function)를 이용한 자율주행로봇들간의 충돌예방을 위한 주행제어 알고리즘의 개발)

  • 이병룡
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.15 no.6
    • /
    • pp.107-115
    • /
    • 1998
  • A path planning using potential field method is very useful for the real-time navigation of mobile robots. However, the method needs high modeling cost to calculate the potential field because of complex preprocessing, and mobile robots may get stuck into local minima. In this paper, An efficient path planning algorithm for multiple mobile robots, based on the potential field method, was proposed. In the algorithm. the concepts of subgoals and obstacle priority were introduced. The subgoals can be used to escape local minima, or to design and change the paths of mobile robots in the work space. In obstacle priority, all the objects (obstacles and mobile robots) in the work space have their own priorities, and the object having lower priority should avoid the objects having higher priority than it has. In this paper, first, potential based path planning method was introduced, next an efficient collision-avoidance algorithm for multiple mobile robots, moving in the obstacle environment, was proposed by using subgoals and obstacle priority. Finally, the developed algorithm was demonstrated graphically to show the usefulness of the algorithm.

  • PDF

A Study on Estimation Flow of Information Analysis for Prevention of Human Error to the Operation (화학 공장 내 운전과 설비작업의 인적 오류에 대한 정보 분석 평가흐름의 연구)

  • Yun, Yong-Gu;Gang, Yeong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.11a
    • /
    • pp.231-241
    • /
    • 2013
  • In recent years, accident induced by human error is increasing in the chemical plant. Human error analysis of the chemical plant was conducted on the basis of past accident. Some company called by A for the basis of a chemical accident. Factor analysis of human errors was separated in plant operation and work. Agency's work of occupational safety & health was classified into four types. It is based on the work before, during work, recovery work, and discontinue work. It was still separated work of human error by analysis and then was derived factor and issue. The human error factor and priority for accident prevention in the chemical plant is presented.

  • PDF

A Study on the Work Delay Factors of Reinforced Concrete Work in Apartment House Construction (공동주택 철근콘크리트 공사 작업지연요인에 관한 연구)

  • Lee, Hyun-Chul;Lim, So-Yean;Yeo, Sang-Ku;Go, Seong-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.2
    • /
    • pp.55-61
    • /
    • 2009
  • In order to conduct construction projects effectively, the work delay factors would be managed by planned construction schedules. As construction works are delayed ceaselessly, the solution is to select and manage the key factors which delay the work ceaselessly. The subjects of this study were an apartment houses of reinforced concrete structure. Hidden work delay factor were extracted, the surveys were conducted and occurrence, severity and detection of each factor were analyzed. With this result, final orders of priority were fixed and key management factors were deducted and presented.

Priority Order of Reinforced Concrete Work for Inspection Applying 6 Sigma - Minimize time of additional correction work- (6시그마를 이용한 철근콘크리트 공사 검측항목 우선순위 선정 - 수정작업 시간 최소화를 중심으로 -)

  • Joh, Hyun-Woo;Shin, Jae-Min;Park, Hyun-Young;Shin, Yoon-seok;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.287-289
    • /
    • 2012
  • The building construction industry of Korea was going through difficulties in improving productivity and competitiveness in international market. Therefore we expected to see the improvement in productivity by applying six-sigma based approach to general reinforced concrete construction work. As a result of applying DMAIC method, one of 6 sigma tools, we found that the most effective inspection items are 'Gap of forms' and 'status of clean'. We could see from this case study that the percentage of additional work days has decreased to 37.7% as a result of applying six-sigma based approach to reinforced concrete construction.

  • PDF

Analysis of the Priority of Evaluation Criteria and Detailed Index for Selecting Street Trees (가로수 선정 평가기준과 세부지표의 중요도 분석)

  • Kim, Min Kyung
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.49 no.1
    • /
    • pp.42-53
    • /
    • 2021
  • Street trees improve the cityscape and air quality, reduce heat islands, and create wildlife habitats. Hence, they are essential parts of a city's green infrastructure. Therefore, several trees that are well adapted to the urban environment were planted. However, this caused the problem of simple trees being planted around the world. This study is to select more various street trees. To accomplish this, evaluation criteria and detailed indexes were created. The importance was indicated through the Analytic Hierarchy Process. For commercial roads, the priority of landscape characteristics is 0.2640, and among detailed indicators, the priority of shape is 0.1245. For work roads, the priority of landscape characteristics is 0.2496, and among detailed indicators, the priority of shape is 0.1177. For work roads, the priority of characteristics of civil service is 0.2250, and among detailed indicators, the priority of shape is 0.1177. For general roads, the priority of maintenance characteristics is 0.2479, and among detailed indicators, the priority of shape is 0.1062. For historical and cultural roads, the priority of regional characteristics is 0.3488, and among detailed indicators, the priority of regional characteristics is 0.1643. For ecological roads, the priority of ecosystem characteristics is 0.3488, and among detailed indicators, the priority of the diversity of species is 0.1643. For automotive-only roads, the priority of the ecosystem characteristics is 0.4639, and among detailed indicators, the priority of reducing emissions is 0.1643. This study will provide objective criteria for the selection of street trees.

User Task Management System based on Device Priority (기기 우선순위 기반 사용자 작업관리 시스템)

  • Jang, Kiman;Jeong, Dohyeong;Jung, Hoekyung
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.21 no.3
    • /
    • pp.657-662
    • /
    • 2017
  • Recently, according to the development of the smart home field, it provides a service to install and keep the smart home appliance in a user's residential environment pleasantly. However, the conventional system method has a problem in that it is not convenient because the user selects a device or manually operates the device. In this paper, we propose a system to set the priority of the devices selected by the user and proceed with the work. When a user selects a device, it recommends a device associated with the device. Compare and set the priority of each device. And it is a system that carries out work according to the set priority. Therefore the proposed system is expected to provide users with increased convenience and efficiency of work management.

Development of Curriculum for Agricultural Work Safety and Health Management Specialist Training Course (농작업 안전보건관리 전문가 양성과정의 교육과정 개발)

  • Lee, Hyeon-Gyeong;Chae, Hye-Seon;Park, Soo-In;Kim, In-Soo
    • Journal of Agricultural Extension & Community Development
    • /
    • v.29 no.3
    • /
    • pp.131-142
    • /
    • 2022
  • This study aims to develop a curriculum for nurturing experts who perform agricultural safety and health management tasks. This study was conducted in three stages. First, job definitions and job models of agricultural safety and health managers were derived through job analysis using the DACUM technique. Second, job demand analysis was conducted by conducting a survey on the difficulty, importance, and frequency of each task. Third, IPA analysis was performed as the first priority tasks of job demand analysis to present the courses and subjects of the training course for safety and health managers in agricultural work. The job of the agricultural safety and health manager was defined as "to conduct guidance and advice on safety and health education, risk factors, and evaluation and management of harmful factors to protect farmers' professional health and safety." The job model consisted of 4 tasks, 31 core tasks, and 67 detailed tasks. As a result of job demand analysis, there were 39 tasks in the 1st priority, 22 in the 2nd priority, and 6 in the 3rd priority. As a result of the IPA analysis, there were 13 'capacity development focused areas', 4 'capacity development effort areas', 11 'low priority areas', and 3 'continuous maintenance areas'.