• Title/Summary/Keyword: Work Item

Search Result 486, Processing Time 0.052 seconds

Study on key standardization Work Item derivation and strategies for IoT services (사물인터넷 서비스의 중점 표준화 항목 도출 및 전략에 관한 연구)

  • Kim, Jungsook
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.12 no.1
    • /
    • pp.13-26
    • /
    • 2016
  • Service and technology for the future hyper-connected society, which is every information receive through the mobile internet, will be an Internet of Things. Thus, it is mandatory to derive key standardization work item and establish strategy for the global business with the standardization of device and service platform by the application service. In this study, by analyzing the domestic and international market trends, state of technical development, and standardization of technology, we identified the open platform is the stepping stone for achieving the goal which is establishing the virtuous circulation of IoT ecosystem. Also, we defined emphasized key standardization work item for achieving the open platform are network, server, access authentication, billing system, and software platform. After that, we proposed future strategy direction of standardization. This research could be contribute to the IoT service diffusion by realizing IP communication among low power wireless terminals and implementing light-weight standard internet protocol.

A Model for Production Planning in a Multi-item Production System -Multi-item Parametric Decision Rule- (다품목(多品目) 생산체제(生産體制)의 생산계획(生産計劃)을 위한 모델)

  • Choe, Byeong-Gyu
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.1 no.2
    • /
    • pp.27-38
    • /
    • 1975
  • This paper explores a quantitative decision-making system for planning production, inventories and work-force in a multi-item production system. The Multi-item Parametric Decision Rule (MPDR) model, which assumes the existence of two types of linear feed-back rules, one for work-force level and one for production rates, is basically an extension of the existing method of Parametric Production Planning (PPP) proposed by C.H. Jones. The MPDR model, however, explicitly considers the effect of manufacturing progress and other factors such as employee turn-over, difference in work-days between month etc., and it also provides decision rules for production rates of individual items. First, the cost relations of the production system are estimated in terms of mathematical functions, and then decision rules for work-force level and production rates of individual items are establised based upon the estimated objective cost function. Finally, a direct search technique is used to find a set of parameters which minimizes the total cost of the objective function over a specified planning horizon, given estimates of future demands and initial values of inventories and work-force level. As a case problem, a hypothetical decision rule is developed for a particular firm (truck assembly factory).

  • PDF

A Study on the Simplification for Quantity Bill Writing and Structure in the Electrical Extension Field (내선분야 내역서 작성 및 체계 간소화 방안 고찰)

  • Hyun, So-Young;Kim, Gwang-Gon;Park, Min-Young;Choi, Seung-Dong
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.1
    • /
    • pp.173-178
    • /
    • 2012
  • The quantity bill writing of organized electrical construction can be an effective to quality and process management in the construction. Therefore, in order to overcome confusion of the construction and doing an effective work, the clearly quantity bill writing is need. This paper is a focused to solve a problem of existing quantity bill as the difference in terms of work section and item information, regulatory information of ordering authority. Therefore, a terms of work section and item information, regulatory information of ordering authority has been normalized. Moreover, basic data of simplification for quantity bill writing and structure has been guaranteed.

Study on the investment method for the coordination of the performance assurance term in the Apartment Housing (공동주택 하자담보책임기간의 조정을 위한 공종별 검토방법에 관한 연구)

  • Park, Geun-Soo;Chae, Chang-Woo
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2008.11a
    • /
    • pp.458-463
    • /
    • 2008
  • This study focused on the suggestion that is improved alternation with relation to construction item & assurance term in order to deal with the assurance conflict efficiently which have been happened in the apartment housing. To correspond to this purpose of research, as a first step, we introduced the add item & sub item of construction work on the basis upon construction specifications of the number of 17 on housing law as a alternation of the defects assurance construction item that is necessary to correct as soon as possible. As a second step of the research, we did cross analysis & compare the result of defects happened to the apartment housing complex of 293 with the defect' rate of construction work excepted from the supervisory item, and main performance estimation items in the HPGS(House Performance Grading System), and analysis results introduced from question survey. As the result of this research work, we became to reflect the improving schemes on the housing Law the year of 2007.

  • PDF

Application of Rasch Analysis to the Modified Oswestry Low Back Pain Disability Questionnaire for Work-Related Low Back Pain Patients (수정된 오스웨스트리 허리기능 장애 설문지의 라쉬분석: 산업장에서의 업무관련 요통환자를 대상으로)

  • Park, So-Yeon;Oh, Jae-Seop;Yi, Chung-Hwi
    • Physical Therapy Korea
    • /
    • v.15 no.3
    • /
    • pp.26-34
    • /
    • 2008
  • The purposes of this study were to assess and modify the original classification categories of the modified Oswestry Low Back Pain Disability Questionnaire (ODQ) and to determine the unidimensionality of the modified ODQ applying Rasch Analysis. The data were obtained from 108 work-related low back pain patients by physical therapists. Construct validity of the scale using the Rasch model required the structure of the rating scale to be modified from 6 response levels to 4 response levels. Eight items from the modified ODQ fit the Rasch model. The items, "pain intensity" and "social life" showed misfit statistics. In general, the order of item difficulty of the remaining 8 items showed a logical item difficulty hierarchy with the "changing degree of pain" item being the most difficult and the "walk" item being the easiest. The results showed that further study is needed to expand the construct of ODQ including additional higher-level items related to work activities. This study may be useful for establishing a standard method to assess the functionality of low back pain patients.

  • PDF

STEP 기반 자동차 PDM

  • 오유천
    • Proceedings of the CALSEC Conference
    • /
    • 1997.11a
    • /
    • pp.443-461
    • /
    • 1997
  • ㆍProSTEP, PDES, Inc., and JSTEP announce agreement on PDM Schema ㆍ November 4, 1997 ㆍInteroperable with STEP AP203, AP2l0, AP214, and AP232 ㆍNeutral specification allows for the exchange of the following types - item master data (part identification, approval of part version) - item structure - item classification - item property (mass, costs) - document management (identification, revision… ) - work management (engineering change request, EC order, project) ㆍVendors of PDM systems are asked to join ProSTEP's PDM Round Table and PDES, Inc.'s PDMnet.(omitted)

  • PDF

Object-Parameter Integrated Schematic Estimation Model for Predicting Office Building Interior-finishing Costs (오브젝트-파라미터 통합 오피스 마감공사비 개산견적 모델)

  • Park, Sung-Ho;Koo, Kyo-Jin;Park, Sung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.159-165
    • /
    • 2008
  • For deciding the profitability and feasibility of the construction project, the schematic estimation has to not only link the design decision-making but also estimate the cost with reliability. The Object-based schematic estimation system was developed for easily linking with design-making and supports to evaluate the design alternatives in the design development stage but didn't consider the cost estimated by object supplementary and parameter work item. This research presents the Integrated Object-Parameter Schematic Estimation Model in the design development stage that can lead to more accurately estimate the cost through analyzing historical data from the high-storied office buildings. For the development of the proposed model for schematic estimation, after analyzing and classifying the work items from the Bills of Quantities(BOQs) and drawings of historical data, this research proposed the methods of estimating cost in accordance with attributes of each work item using regression analysis. In addition, a case study is performed for the effectiveness as comparing the proposed model with the previous estimating model.

  • PDF

A Study on Safety Management Indicators for Landscape Construction Field (조경시공현장 안전관리 항목에 관한 연구)

  • Park, Jae-Young
    • Journal of Environmental Science International
    • /
    • v.31 no.7
    • /
    • pp.653-663
    • /
    • 2022
  • Research activities and discussions on specialized areas reflecting the specificity of landscape construction are necessary. Therefore, this study was conducted with the purpose of presenting basic data for efficient field management by deriving items necessary for safety management in landscape construction fields through experts' opinions. A survey was conducted using Delphi analysis to derive "management items" and "safety management items according to landscape type" for landscape construction field safety for a total of 15 landscape construction specialists. The survey results showed that four top items were derived from the "management items" for the safety of landscape construction fields; they include: "safety and health management organization and education," "industrial safety and health management expenses," "payment of personal protection," and "establishment of safety measures." In addition, two to five items for each higher item appeared and resulted in a total of 13 lower items. Personnel, organization, budget, etc. for safety management are always required in the field, and the monitoring part of whether these elements are working was also taken up as a management item. In the "Management items according to each landscape construction" a total of eight landscape type were distinguished, they include: 'Reinforced concrete work', 'Masonry work', 'Plaster's work', 'Waterproof work', 'Stone masonry work', 'Pavement work', 'Facilities work', and 'Planting work'. Furthermore, two to seven sub-items for each construction type were derived, and a total of 35 management items were presented.

Development a multidimensional assessment scale for work-family spillover in working couples with children (유자녀 맞벌이 부부의 다차원적 일-가족 전이 척도 개발)

  • Jang, Yoon-Ok;Jeong, Seo-Leen
    • Journal of Family Resource Management and Policy Review
    • /
    • v.17 no.3
    • /
    • pp.59-79
    • /
    • 2013
  • The purpose of this study was to develop and validate a scale for the multidimensional assessment of work-family spillover in working couples with children. The subjects of this study were working wives and husbands with children in Daegu. Two surveys were administered, eliciting 243 respondents and 227 respondents, respectively. Then a series of tests were run to analyze the data, including item-to-total correlation, Cramer's V coefficients, item discrimination, Cronbach's ${\alpha}$, and exploratory and confirmatory factor analysis. The results yielded that, first, a preliminary 102 items were developed on the basis of the literature review, and this was narrowed down to 72 items selected with the help of experts. Through preliminary, primary and secondary survey analysis, the scale for the multidimensional assessment of work-family spillover was developed and validated, with a 36 items scale, 18 items for work to family spillover and 18 items for family to work spillover. Furthermore, the scale constructed three spillover processes - time interference, energy depletion, and psychological distraction - and consisted of four different domains of family life into which spillover occurs - namely marital relationship, parent-child relationship, leisure, and housework. The internal reliability was evaluated to show a confidence range of .85 ~.92 for each factor.

  • PDF

A Relative Importance Evaluation for the Perception of Managers on the Comprehensive Rural Village Development Project using Analytic Hierarchy Process (계층분석과정(AHP)을 활용한 권역단위 종합정비사업 사무장 의식의 상대적 중요도 평가)

  • Jang, Dong-Heon
    • Journal of Korean Society of Rural Planning
    • /
    • v.21 no.1
    • /
    • pp.41-50
    • /
    • 2015
  • In this study, the relative importance for the perception of managers on the comprehensive rural village development projects was evaluated using the AHP method. The fields for evaluation were 4 fields including human relationships, working conditions, work compensation and work burnout. Also, the relative importance for the perception of managers and priority order were analyzed through 15 evaluation items. The analysis result shows that the human relationships among 4 fields were regarded as the most important field, followed by work compensation, working conditions and work burnout. Also, the relationship with the chairperson for the human relationships, continuity of employment for the working conditions, salary for work compensation, and mental stress for work burnout were considered respectively as the most important item. Also, salary among all evaluation items was considered as the most important item for the relative importance, followed by continuity of employment, relationship with village residents and mental stress. However, work load, consulting firms, impersonal treatment and the relations between the administration showed relatively low importance and priority order. It is considered that this analysis result will be used as important preliminary data for establishing the role of manager in the comprehensive rural village development project.