A Study on the Work Breakdown Structure of Agricultural Facilities for Developing a Construction and Maintenance Information System -Focused on Vinyl house, Glass greenhouse, Cattle shed- (농촌시설물 시공 및 유지관리 정보화 시스템 구축을 위한 작업분류체계 구축에 관한 연구 -비닐하우스, 유리온실, 축사를 중심으로-)

  • Choi, Oh-Young;Kim, Tae-Hui;Kim, Jae-Yeob;Kim, Gwang-Hee;Choi, Eung-Kyoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.4
    • /
    • pp.147-155
    • /
    • 2009
  • Recently, the scale and technical complexity of agricultural production has been growing. Therefore, agricultural facilities are being gradually diversified, expanded, and made more complex. To furnish Korea's agricultural industry with international competitiveness, it is thus necessary to introduce new management techniques. The PCM (procurement-construction-maintenance) information management system for agricultural facilities is established by setting up its WBS (work breakdown structure). In this study, the WBS of a facility such as facility, space, element, works, and resources is analyzed. Following this analysts, a WBS of an agricultural facility that is appropriate for the PCM information system of an agricultural facility, is proposed by deriving it from actual WBS.

Analysis of the Work Breakdown Structure and Cost-Rate for Small Interior Works in Apartment (아파트 소규모 인테리어공사의 공종별 분류와 보할의 분석)

  • Kim, Chae-Yong;Lee, Jong-Gyu;Lee, Jae-Yong;Lee, Soo-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.213-219
    • /
    • 2010
  • The research, based on 200 cases of small interior works in6 different floor area types of apartment in Busan, intended to compare the architectural work with the breakdown structure and analyze the cost of general small-scale interior work, by work type. The outcome of the research is outlined as follows. (1) Given the cost of small interior works for apartmentsranges from 10 million to 15 million won, which correspond to apartments ranging in size from $79.2m^2$ (24PY) to $105.6m^2$, it is necessary to implement a cost analysis for material cost and labor cost for these two types. (2) Given that small interior work for apartments comprises mostly finishing work, unlike the categoriesof general architectural work, it is more reasonable to classify the works into 9 categories,which include embellishment, wood, tile, paint, metal, toilet, sink & furniture, electric & mechanical and other works, instead of the 22 divisions stipulated in the Korean Architectural Standard Specification. (3) After reviewing the average cost of small interior work and rate by floor area, it was found thatthe average cost of 24PY was 10.5 million won, of which metal work accounts for 12.8%, embellishment work 17.8%, and toilet 19.7%, while sink & furniture appeared to be the highest with 22.1%, while for 32PY, average cost was 12.5 million won,which comprises 7.4% wood work, sink & furniture 20.2%, toilet 23.4% and embellishment work the highest at 28.6%, indicating that embellishment work accounts for the greater portion.

Conceptual WBS Model for a Large-Scale Information System Acquisition Project (대규모 정보시스템 개발 프로젝트를 위한 개념적 작업분담구조도의 모형화에 관한 연구)

  • Nam Yong Lee
    • The Journal of Society for e-Business Studies
    • /
    • v.6 no.1
    • /
    • pp.55-67
    • /
    • 2001
  • Over the past decade, the topic of work breakdown structure (WBS) has gained an increasing amount of attention from information technology Professionals as an effective tool for managing the complexity of a large-scale information system development project. It is a method for planning and controlling a large-scale information system development. A WBS provides the basis for project organization, cost estimation, task scheduling, and contract management. Based on the authors' practical experience, this paper discusses how to establish a specific WBS and some considerations for developing a well-defined WBS. The model of WBS suggested in this study will provide useful insight and guidelines for establishing the spec-ific WBS for a large-scale information systems development.

  • PDF

A Study on the Efficiency of Earned Value Management System for Practical Application (공정${\cdot}$공사비 통합관리시스템의 실무적용 효율화 방안)

  • Lee Woo-Sik;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.500-503
    • /
    • 2003
  • Considering that our construction market is recognizing the necessity of EVMS(Earned Value Management System) and that the EVMS will be applied to the construction projects with large scale. the suggested methodologies to link WBS(Work Breakdown Structure) with EVMS results and the developed web-based EVMS can be a tentative system for practical application.

  • PDF

A study on MBSE(Model-Based Systems Engineering) application method for concept design of submarine (잠수함 개념설계에 모델기반 시스템 엔지니어링을 적용하기 위한 방법에 대한 연구)

  • Bae, Jeong-Hoon;Kim, Byung-Mok;Kim, Mi-Hee;Shin, Sung-Chul;Kim, Soo-Young;An, Chin-Woo
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.9 no.2
    • /
    • pp.7-14
    • /
    • 2013
  • Because submarine is high-technology and very complex system, it takes a lot of time, cost and manpower for design. For efficient concept design, application of systematic method is required such as system engineering. In this study, we studied application method of MBSE for submarine concept design with SWBS (Ship Work Breakdown Structure). Components of submarine system from SWBS were classified and organized as system architecture with 'Vitech CORE'. Through the MBSE application for concept design, systematic, efficient and traceable concept design of submarine was considered.

A Study on Project Management Scheduling Module Development using the Rule and CBR (규칙(Rule) 과 CBR 기법을 활용한 프로젝트 일정관리 모듈 구현에 관한 연구)

  • Sin, Ho-Gyun;Kim, Yeong-Jun;Jeon, Seung-Ho
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2004.05a
    • /
    • pp.343-354
    • /
    • 2004
  • A Project planning is one of the most important processes that determines success and failure of the project. Scope management for project planning is also essential job in system integration project. However project planning is very difficult because lots of factor and their relationships should be considered. Therefore project planning of SI project has been done by project manager s own knowledge and experiences. It is necessary to develop an algorithm of WBS(Work Breakdown Structure) identification & document selection along to project's specificity in project management system using AI technique. This study also present method (ODW model) to cope with the limitations of the existing study that has uniformly customizing the methodology by only project complexity. We propose PPSM(Project planning support module) that apply Rule for determination of route map and document level, and CBR for WBS identification.

  • PDF

An Establishment the Work Breakdown Structure for Owners in the Multi-Complex Project (입체·복합 프로젝트에서 발주자 중심의 WBS 구축방향)

  • Ko, Dae-Jun;Choi, Eun-A;Seo, Young-Chil;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.127-131
    • /
    • 2008
  • The successful project management is based on definition of project goals in construction industry. The WBS(Work Breakdown Structure) is one of the major factors which defines works related to project goals. The necessity of the WBS for owners in multi complex projects which would help them to understand the whole project is rising because the multi-complex project in the construction industry has increasing recently. Therefore, this study suggests directions to establish the WBS for owners through investigating a concept of the multi-complex project first and analyzing types of project, domestic and foreign WBS, and case studies.

  • PDF

Application of Computer-Aided Systems Engineering to Light Rail Transit System Development (전산지원 시스템공학을 응용한 경량전철 시스템 개발)

  • 박중용;박영원;이중윤;안장근;목재균;이우동
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2000.10a
    • /
    • pp.435-435
    • /
    • 2000
  • Light Rail Transit (LRT) system is a complex and large system in which there are many subsystems, interfaces, functions and demanding performance requirements. Because many contractors participate in the development, it is necessary to apply methods of sharing common objectives and communicating effectively among all of the stakeholders. This paper shows not only the methodology and the results of computer-aided systems engineering including requirement management, functional analysis and architecting LRT system, but also propose a tool to help manage a project by linking WBS (Work Breakdown Structure), work organization and PBS (Product Breakdown Structure). The application of computer-aided tool RDD-100 provides the capability to model product design knowledge and decisions about important issues such as architecting the top-level system. The product design knowledge will be essential in integrating the following life-cycle phase activities over the life of the LRT system. Additionally, when a new generation train system is required, the reuse of the database can increase the system design productivity and effectiveness significantly.

  • PDF

Work Breakdown Structure for advanced urban transit system (차세대 첨단 도시철도시스템 기술개발사업의 업무분류체계(WBS) 구성에 관한 연구)

  • Park Sung-Hyuk;Oh Seh-Chan;Yeo Min-Woo
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.921-927
    • /
    • 2005
  • Concurrent engineering is considered in the 21st century product development and H&D. Moreover, advancements in IT and advanced system engineering technology enables to produce high-quality article and shorten the period of R&D. The paper propose work breakdown structure(WBS) based on the product data management(PDM), WEB based system engineering technique, to introduce and operate advanced system engineering technique. We will manage systematically all data produced in advanced urban transit system project based on the proposed WBS. Besides, we provide strategic information for improving efficiency of R&D in advanced urban transit system project. Futhermore, we manage data such as images, design drawings, documents as well as numerical data, and will establish PDM system for sharing the data.

  • PDF

A Linkage Method for the Life Cycle Cost Breakdown Structure through an Analysis of Boundary Conditions (경계조건 분석을 통한 LCCBS 연계방안)

  • Jeong, Jae-Hyuk;Kim, Tae-Hui
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.321-332
    • /
    • 2013
  • Costs and expenses are intertwined and incurred throughout an entire construction project, even from the pre-construction phase, and each phase has a different impact on the life cycle cost (LCC). However, the cost breakdown structure (CBS) is different in each phase of a building construction project, which makes it hard to reasonably calculate construction cost. For this reason, the boundary conditions were analyzed in this study based on the life cycle cost break structure (LCCBS). In addition, breakdown factors were analyzed based on the boundary conditions to derive a linkage method. The validity of the linkage method was verified through application to actual construction projects. Through the analysis, it was found that the problem of items being left out was reduced by more than 97.2 percent, and the work was done an average of 6 hours faster compared to the conventional method. It is expected that by applying the new LCC system, LCC will be both reduced and calculated in a more efficient manner.