• Title/Summary/Keyword: Welding cost

Search Result 328, Processing Time 0.026 seconds

An Experimental Study on the Development of Electromagnetic Shielding Concrete Wall for Shielding High-altitude Electromagnetic Pulse (HEMP) (고고도 전자기파(HEMP)차폐를 위한 전자파 차폐 콘크리트 벽체 개발에 관한 실험적 연구)

  • Choi, Hyun-Jun;Kim, Hyung-Chul;Lim, Sang-Woo;Lee, Han-Seung
    • Journal of the Korea Concrete Institute
    • /
    • v.29 no.2
    • /
    • pp.169-177
    • /
    • 2017
  • Rather than causing damage from heat, blast, and radiation of a regular nuclear weapon, recently, it is predicted that North Korea has been inventing high altitude electromagnetic pulse (HEMP) missile in order to incapacitate electronic equipment. HEMP shielding facility is used for military purpose today. Despite the electromagnetic shielding effects from high quality compression plates, problems may include such as the possibility of electromagnetic influx resulting in the welding of the compression plates, and difficulties and high cost of construction. Therefore, in this study, a high electrical conducting material was added to the concrete experimental subject to ensure the shielding effect through electromagnetic waves to for the concrete structure, instead of building a shielding facility separately for the structure. Also, among the experimental subjects, 100 ${\mu}m$ of Iron-Aluminum alloy metal spraying coat was applied to two types with the highest shielding effect, and to two types with the lowest shielding effect. The result of the experiment indicates that experimental subjects added with a high electrical conductivity material did not meet the minimum shielding criteria of MIL-STD-118-125-1 standard, but all the experimental material applied to the metal spraying coating satisfied the minimum shielding criteria. In conclusion, it is considered that 100 µm of Iron-Aluminum alloy metal spraying coat contains high efficiency in the HEMP shielding.

Study on tension-tension fatigue strength properties of underwater welded joints of SM41A-2 Plate-to-Plate (수중용접한 국산 SM41A-2강판의 편진반복 인장하중하의 피로강도특성에 관한 연구)

  • 오세규;박주성;한상덕
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.11 no.2
    • /
    • pp.71-81
    • /
    • 1987
  • Nowadays, the high development of industrial technique demands the optimal design of marine structures to be welded under the water, because the underwater welding of the ship hull and marine structures can decrease manpower and cost of production. However there is not available at present any report on fatigue behavior about underwater welded joints. In this paper under tention- tension repeated fatigue stress with frequency of 10 cycles per second by local controlled system, the fatigue strength properties of underwater welded joints of SM41A-2 Plate-to-Plate of 10 mm thickness were experimentally examined. The results obtained were as follows : 1) The fatigue strength of underwater welded joints of SM41A-2 was peaked at the heat input of about 1, 400 joule/mm(180 A, 36 V), while, at the heat input of more than about 1, 100 joule/mm (160 A, 33 V) that of the underwater welds at the higher than cycle of life rather than the lower cycle was higher than that of the base metal but lower than that of the atmosphere welds on account of both cooling and notch effects. 2) The fatigue limit of underwater welds increased with an increase of heat input resulting in a peak of that at the heat input of about 1, 400 joule/mm and then decreased gradually. 3) The fatigue strength at N cycles was peaked between the heat input of about 1, 400 and 1, 700 joule/mm where the strain was rapidly increased. 4) It was confirmed that the optimal zone of heat input condition for obtaining the underwater welds fatigue strength higher than that of the base metal exists, and if out of this zone, the fatigue strength of the underwater welds was lower than that of the base metal because of lack weld penetration, inclusion of slag, voids, etc. 5) By the fatigue test, the underwater welds fractured brittly without visual deformation, so the strain was remarkably less than of the atmosphere welds. 6) The fatigue life factor was peaked at the heat input of about 1, 600 joule/mm (200 A, 36 V) at which the mean strain is a little higher than that of the base metal but quite lower than those of the atmosphere welds, resulting in good underwater welds because both fatigue strength and ductility of the underwater welds are higher than those of the base metal at such heat input.

  • PDF

Evaluation of Resistance Spot Weldability of SGAFC1180 Steel (SGAFC1180 TRIP강재의 저항 점용접성 평가)

  • Shin, Seok-Woo;Lee, Jong-Hun;Kim, Dae-Hwan;Park, Sang-Heup
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.12
    • /
    • pp.644-649
    • /
    • 2017
  • In the automobile industry, there is growing demand for lightweight vehicles due to environmental problems and rising oil prices. Therefore, aluminum alloys and special materials are being used to reduce the weight of vehicles, but there are still many difficulties to overcome in terms of cost and strength. Therefore, the application of advanced high strength steel (AHSS)is increasing. AHSS has good strength and formability.Safety regulations are becoming stricter, and 1.2-GPa super-high-strength steels are gradually being applied for the center pillar and roof rails. Thus, the application of different kinds of steels in automobile bodiesis also increasing gradually. This study evaluates the resistance point weldability and the characteristics of a welded part of SGAFC1180 1.2t steel. A simulation was used to observe the nugget formation and its growth behavior. The prediction performance showed a similar tendency within an error rate of 10%. Also, the effect of this behavior on the process resistance and dynamic resistance was investigated,along with the correlation between the shear tensile strength and nugget diameter.

Experimental Evaluation of Seismic Column Splice with Partial Joint Penetration Welds (부분용입용접 내진기둥 이음부의 강도평가)

  • Lee, Cheol Ho;Kim, Jae Hoon;Kim, Jung Jae;Oh, Sang Hoon
    • Journal of Korean Society of Steel Construction
    • /
    • v.20 no.6
    • /
    • pp.817-827
    • /
    • 2008
  • The seismic performance of a column splice fabricated with PJP (partial joint penetration) welds for special moment frames was experimentally evaluated in this study. The steel materials that were used for the specimens included SHN490 and SN490 steel, or the newly developed structural steel for seismic application. Fabricating the column splice with PJP welds is highly attractive from the perspective of reducing the welding cost and the construction time. PJP welds in column splices are viewed apprehensively, however, because several tests have shown that PJP welds in thick members tend to become brittle under tensile loads. The column splices in this testing program were designed for the expected plastic moment of the column that current seismic codes typically require. The design strength of partial-penetration welded joints was determined according to the 2005 AISC-LRFD Specification. Three-point loading was applied monotonically, using a universal testing machine, such thatthe column splice joints were subjected to pure tension. The test results showed that the PJP welded splices, if designed properly, can develop a strength exceeding that of the actual plastic moment of the column. The specimen made of the SM490 rolled section, however, showed a brittle fracture at the splice soon after achieving the actual plastic moment of the column. The tensile coupon test results also showed that the material properties of SM490 steel are more unpredictable. Overall, although the test data are limited, the SHN490 and SN490 steel specimens showed a superior and reliable performance.

Experimental Study on Improvement of Pipe-rack Joint (Pipe-rack접합부 개선방법에 관한 실험적 연구)

  • Lee, Jong-Kun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.4
    • /
    • pp.1-9
    • /
    • 2018
  • The development of new technology and process in industrial Plant which builds integrated structures, facilities and systems. Has become a key element for strengthening its competitiveness. Although domestic industrial Plant has demonstrated excellence in technology with a persistent increase in order quantity and orders received, the technology gap between countries has narrowed due to global construction trend. Therefore, it is necessary to develop new technology that could help overcome constraints and limitations of the current one to follow the trend in the age of unlimited competition. This study has focused on assembly technology of Pipe-rack joint connection in an effort to strengthen technological competitiveness in industrial Plant. Through an analysis of earlier studies on Pipe-rack and a coMParative analysis of strengths and weaknesses of current assembly technology of it, a new design plan has been made to improve it efficiently. In doing this, standards for design factors of both structural and performance features have been drawn, and value of stress, strain, moment and rotation has been calculated using finite element analysis. As a result, installation technology of modular type Pipe-rack, which has not been developed in Korea and is differentiated from the current one, has been developed. It is considered that the technology reduces work time and saves cost due to simplified joint connection of steel structure, unlike the current one. Moreover, since it is installed without a welding process in the field, industrial accidents would be reduced, which is likely to have economic competitiveness and satisfy.

Evaluation of Steel Tube Connection in Precast Concrete Double Wall System (프리캐스트 콘크리트 더블월 시스템의 각형 강관 연결부 성능평가 )

  • Yujae Seo;Hyunjin Ju
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.2
    • /
    • pp.25-32
    • /
    • 2023
  • In this study, a double wall system is introduced, which was invented to simplify the complicated manufacturing process of the existing precast concrete (PC) double wall systems and to remove defects such as laitance that may occur during the production of concrete panels. An experimental study was conducted to investigate the tensile resisting capacity of the steel tube which is embedded in the precast concrete panel to keep the spacing between PC panels and to prevent damage of the PC panels during transportation and casting concrete onsite. The experiment was planned to determine the detail of effective steel tube connection considering the steel plate treatment method according to the formation of the opening, the presence of embedded concrete, and the reinforcement welding for additional dowel action as key variables. As a result, the ultimate tensile strength increased by 20-30% compared to the control specimen (ST) except for the steel tube specimen (ST_CP) which has steel plates bent inward at the end part of the steel tube. Since the specimen (ST_CON) filled with concrete inside the control specimen has no additional process and cost for the steel tube connections compared to the control specimen during the production of the developed double wall system, it is determined to be the appropriate detail of steel tube connection.

Case Study on Economical Fabrication and Erection of Steel Structure and Reduction in Field Erection Time (경제적 철골제작$\cdot$설치 및 공기단축 사례분석연구)

  • Ahn Jae-Bong;Choi Yoon ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.183-192
    • /
    • 2004
  • Even in Korea the number of steel structure buildings that allow internal space and easy change of their layouts in accordance with the purpose of buildings and box-type steel bridges constructed with thick plates with thickness in a rage just from a few $\beta$AE to \$100\beta$AE is increasing these days and therefore, domestic fabrication and processing technology of members for steel structures is being improved at a pace faster than in the past to meet the growing requirements of consumers for high reliability on quality control on the related steel structures. However, most domestic fabricators os steel structures who are turning out their steel products in accordance with the designs prepared by engineering companies in their respective works for the sake of cost cut more than anything else, hesitating to introduce any advanced new technology into themselves. In the case of the steel structure design application for small and mid-size buildings in particular, it is quite meaningful not only for those who are involved in steel structure business, but also for the people working at construction work fields to review the result of the study on the connections of steel structure members deigned to obtain superb quality of steel structures within short period for steel fabrication and erection at fields in economical ways, as there is a glowing tendency seeking standardization of connection of steel structure members as well as whole structure together with the development on design of construction system of buildings including their exterior and interior decoration materials, manufacture of the related members and fabrication technique structure. This paper has been prepared with the aim to review the peculiar characteristics of buildings constructed with the main frames of steel structures and actual cases of the change made ing the connections between steel structure columns and between columns and girder members in order to reduce the work period necessary for fabrication and erection of steel structures at the maximum as well as the some examples of steel structures fabricated through automatic welding by robots for box-type columns in addition to the description of the problems found in the course of fabricating those steel structures, suggesting possible counter-measures to solve them.

Development and Experimental Performance Evaluation of Steel Composite Girder by Turn Over Process (단면회전방법을 적용한 강합성 소수주거더 개발 및 실험적 성능 평가)

  • Kim, Sung Jae;Yi, Na Hyun;Kim, Sung Bae;Kim, Jang-Ho Jay
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.5A
    • /
    • pp.407-415
    • /
    • 2010
  • In Korea, more than 90% of the total number of steel bridges built for 40~70 m span length is a steel box-girder bridge type. A steel box-girder bridge is suitable for long span or curved bridges with outstanding flexural and torsional rigidity as well as good constructability and safety. However, a steel box-girder bridge is uneconomical, requiring many secondary members and workmanship such as stiffeners and ribs requiring welding attachments to flanges or webs. Therefore, in US and Japan, a plate girder bridge, which is relatively cheap and easy to construct is generally used. One type of the plate girder bridge is the two- or three-main girder plate bridge, which is a composite plate girder bridge that minimizes the number of required main girders by increasing the distance between the adjacent girders. Also, for the simplification of girder section, the stiffener which requires attachment to the web is not required. The two-main steel girder plate bridge is a representative type of plate girder bridges, which is suitable for bridges with 10 m effective width and has been developed in the early 1960s in France. To ensure greater safety of two- or three-main girder plate bridges, a larger steel section is used in the bridge domestically than in Europe or Japan. Also, the total number of two- or three-main girder plate bridge constructed in Korea is significantly less than the steel box girder bridge due to a lack of designers' familiarity with more complex design detailing of the bridge compare to that of a steel box girder bridge design. In this study, a new construction method called Turn Over method is proposed to minimize the steel section size used in a two- or three-main girder plate bridge by applying prestressing force to the member using confining concrete section's weight to reduce construction cost. Also, a full scale 20 m Turn Over girder specimen and a Turn Over girder bridge specimen were tested to evaluate constructability and structural safety of the members constructed using Turn Over process.