• 제목/요약/키워드: Water Treatment Process

검색결과 2,488건 처리시간 0.042초

Struvite 결정화 공정을 이용한 새우가공폐수처리 (Treatment of shrimp processing wastewater using struvite crystallization process)

  • 정병곤
    • 수산해양기술연구
    • /
    • 제52권3호
    • /
    • pp.271-275
    • /
    • 2016
  • Recently, pollution problem in coastal water has become more serious and pollution including red tide serves as a main reason for reduction of fishes resources. Particularly, nutrients such as nitrogen and phosphorus are the most serious pollutants. Normally, biological wastewater treatment process is used in removing such nutrients. However, it is difficult to adopt the biological wastewater treatment process to a small-scale fish processing factory in case of using seawater as wash water. Thus, removing nutrients through struvite crystallization is investigated in this study for treating shrimp processing wastewater. Experiments were conducted by varying molar ratio of $Mg^{2+}:NH^4-N:PO^4-P$ from 1:1:1 to 2:1:1. It can be concluded that optimum molar ratio is 1:1:1. Struvite crystallization process is compared with chemical coagulation process using PAC and struvite crystallization process is proven as the more effective process in removing nutrients from wastewater. In view of results obtained from these experiments, struvite crystallization process is a promising method in removing nitrogen and phosphorus from wastewater; however, not so good in removing organics. Thus, struvite crystallization process is suitable as the pre-treatment process in treating shrimp processing wastewater and additional biological process is needed to remove organics.

Fundamental study on sustainable treatment system of mine water using magnetized solid catalyst

  • Mukuta, Chisato;Akiyama, Yoko
    • 한국초전도ㆍ저온공학회논문지
    • /
    • 제21권2호
    • /
    • pp.15-21
    • /
    • 2019
  • In the mine exploration sites, sustainable treatment system of mine water with energy saving and minimized chemical additives is required. Since most of the mine water contains highly-concentrated ferrous ion, it is necessary to study on the removal method of iron ions. We propose the system consisting of two processes; precipitation process by air oxidation using solid catalyst-modified magnetite and separation process combining gravitational sedimentation and magnetic separation using a permanent magnet. Firstly, in the precipitation process (a former process of the system), we succeeded to prepare solid catalyst-modified magnetite. Air oxidation using solid catalyst-modified magnetite using $Fe_2(SO_4)_3$ as a starting material showed high iron removal capability. Secondly, in the separation process (latter process of the system), solid catalyst-modified magnetite using $Fe_2(SO_4)_3$ as a starting material can be separated by a superconducting bulk magnet and a permanent magnet.

초순수 생산을 위한 최적공정 조합 평가 (A Study of the Optimization Process Combination on the Ultrapure Water Treatment System)

  • 이경혁;김동규;권병수;정관수
    • 대한환경공학회지
    • /
    • 제38권7호
    • /
    • pp.364-370
    • /
    • 2016
  • 본 연구에서는 초순수 생산을 위한 개별공정들의 특성을 고려하여 공정조합 최적화 방안을 결정하는 기법을 연구하였다. 산업 활동에 사용하는 공업용수 중 고도의 기술집합 산업에서 요구되는 고순도 용수인 초순수를 생산하는 공정은 여과, 이온교환, 역삼투, 탈기, 자외선 산화 등 이 있다. 초순수 공정은 다양한 15~20개 정도의 수처리 단위 공정이 조합을 이루고 있다. 본 연구에서는 초순수 생산 모형플랜트를 운영하여 다양한 처리 공정의 조합을 통해 수질 및 경제성을 고려하여 평가하였다. 평가된 19종류의 공정조합 중 11개 공정조합이 목표로 하는 최종 수질을 만족했다. 이러한 11종의 공정조합에 대해 안정성과 경제성을 평가하였다.

정유량 막여과 파울링 모델을 이용한 막여과 정수 플랜트 공정 진단 기법 (A process diagnosis method for membrane water treatment plant using a constant flux membrane fouling model)

  • 김수한
    • 상하수도학회지
    • /
    • 제27권1호
    • /
    • pp.139-146
    • /
    • 2013
  • A process diagnosis method for membrane water treatment plant was developed using a constant flux membrane fouling model. This diagnosis method can be applied to a real-field membrane-based water treatment plant as an early alarming system for membrane fouling. The constant flux membrane fouling model was based on the simplest equation form to describe change in trans-membrane pressure (TMP) during the filtration cycle from a literature. The model was verified using a pilot-scale microfiltraton (MF) plant with two commercial MF membrane modules (72 m2 of membrane area). The predicted TMP data were produced using the model, where the modeling parameters were obtained by the least square method using the early plant data and modeling equations. The diagnosis was carried out by comparing the predicted TMP data (as baseline) and real plant data. As a result of the case study, the diagnsis method worked pretty well to predict the early points where fouling started to occur.

정수장 응집공정의 최적운전조건 결정 사례 (Experiences of Optimization of Flocculation Basins in Water Treatment Plants)

  • 한무영;정영균;박용효;김정현
    • 상하수도학회지
    • /
    • 제14권4호
    • /
    • pp.311-317
    • /
    • 2000
  • The operation of flocculation process and the evaluation thereof have been mainly based on G, t and $G{\times}t$ values which are available from design guidelines and texts. However, their suggested ranges are too wide to find the optimum condition specific to a particular water treatment plant and none of the existing method can be used to evaluate and suggest the optimum operational condition. Recently, a commercially available particle counter is found to be useful in determining the flocculation process based on the particle dynamics. The optimum condition is defined as one that best suits the purpose of flocculation; the number of small particles should decrease, while that of large particles should increase. The experiments were performed at two conventional water treatment plants in Korea, one with horizontal mechanical flocculators, and another with vertical type mechanical flocculators. In this paper, experiences to evaluate the flocculation process and to suggest the optimum operation condition will be presented. Although particle counting method is found to be beneficial compared to any other existing methods, the optimum condition is very much site-specific and should be evaluated at each water treatment plant for different conditions.

  • PDF

정수처리용 활성탄 공정의 적정 역세척 시점 선정을 위한 영향인자들 평가 (Evaluation of Influence Factors for Determination of Proper Backwashing Time of Biological Activated Carbon (BAC) Process in Drinking Water Treatment Process)

  • 김상구;박홍기;손희종;염훈식;류동춘
    • 한국환경과학회지
    • /
    • 제24권12호
    • /
    • pp.1551-1558
    • /
    • 2015
  • In Korea, many drinking water treatment plants (DWTPs) have introduced and are going to introduce biological activated carbon (BAC) process to treated dissolved organic matter (DOM) in water which are difficult to control by conventional water treatment processes. Even though more decade have passed since introduced BAC in Korea, most of BAC operating method was followed to the modified sand filter operating manuals. In case of BAC backwashing, many DWTPs set the periods of backwashing about 3~5 days. In this study, we have collected data to set the proper BAC backwashing periods from both pilot-plant and real DWTPs. We had measured heterotrophic plate count (HPC), turbidity, water temperature, dissolved organic carbon (DOC) and headloss from just after backwashing to the next backwashing time for two years. Considering water quality factors, the BAC run time from backwashing to the next backwashing could extend more 30 days without water quality deterioration if the head loss do not reach the limited level which depends on each BAC facilities' condition. It means the BAC treated water could be saved in the proportion of extended the backwashing period to the existing backwashing period.

파일럿 플랜트 규모에서 일체형 침전부상공정 (SeDAF)의 설계인자 및 운전특성에 대한 실증적 평가 (Empirical evaluation for design parameters and operating characteristics of the integrated sedimentation and dissolved air flotation (SeDAF) process at the pilot-scale plant)

  • 장여주;정진홍;임현만;김원재
    • 상하수도학회지
    • /
    • 제35권1호
    • /
    • pp.1-14
    • /
    • 2021
  • Eutrophication and algal blooms can lead to increase of taste and odor compounds and health problems by cyanobacterial toxins. To cope with these eco-social issues, Ministry of Environment in Korea has been reinforcing the effluent standards of wastewater treatment facilities. As a result, various advanced phosphorus removal processes have been adopted in each wastewater treatment plant nation-widely. However, a lot of existing advanced wastewater treatment processes have been facing the problems of expensive cost in operation and excessive sludge production caused by high dosage of coagulant. In this study, the sedimentation and dissolved air flotation (SeDAF) process integrated with sedimentation and flotation has been developed for enhanced phosphorus removal in wastewater treatment facilities. Design and operating parameters of the SeDAF process with the capacity of 100 ㎥/d were determined, and a demonstration plant has been installed and operated at I wastewater treatment facility (located in Gyeonggi-do) for the verification of field applicability. Several empirical evaluations for the SeDAF process were performed at demonstration-plant scale, and the results showed clearly that T-P and turbidity values of treated water were to satisfy the highest effluent standards below 0.2 mg/L and 2.0 NTU stably for all of operation cases.

미량오염물질 관리를 위한 산화 및 흡착 기반 하수 방류수 강화처리 기술의 연구 동향 및 시사점 (Enhanced sewage effluent treatment with oxidation and adsorption technologies for micropollutant control: current status and implications)

  • 최상기;이웅배;김영모;홍석원;손희종;이윤호
    • 상하수도학회지
    • /
    • 제36권2호
    • /
    • pp.59-79
    • /
    • 2022
  • Conventional wastewater treatment plants (WWTPs) do not fully remove micropollutants. Enhanced treatment of sewage effluents is being considered or implemented in some countries to minimize the discharge of problematic micropollutants from WWTPs. Representative enhanced sewage treatment technologies for micropollutant removal were reviewed, including their current status of research and development. Advanced oxidation processes (AOPs) such as ozonation and UV/H2O2 and adsorption processes using powdered (PAC) and granular activated carbon (GAC) were mainly discussed with focusing on process principles for the micropollutant removal, effect of process operation and water matrix factors, and technical and economic feasibility. Pilot- and full-scale studies have shown that ozonation, PAC, and GAC can achieve significant elimination of various micropollutants at economically feasible costs(0.16-0.29 €/m3). Considering the current status of domestic WWTPs, ozonation and PAC were found to be the most feasible options for the enhanced sewage effluent treatment. Although ozonation and PAC are all mature technologies, a range of technical aspects should be considered for their successful application, such as energy consumption, CO2 emission, byproduct or waste generation, and ease of system construction/operation/maintenance. More feasibility studies considering domestic wastewater characteristics and WWTP conditions are required to apply ozonation or PAC/GAC adsorption process to enhance sewage effluent treatment in Korea.

T-N 제거공정 개선을 위한 하수처리장 공정 분석 (Analysis of sewage treatment process for the improvement of T-N removal process)

  • 신춘환
    • 한국환경과학회지
    • /
    • 제27권2호
    • /
    • pp.99-107
    • /
    • 2018
  • In order to design the improvement process for T-N removal, the treatment process of Suyoung, Gangbyeon, and Noxan sewage treatment plants (STP) in Busan was anlayzed. Suyoung STP shows a T-N removal efficiency of about 69.8% with MLE(Modified Ludzack ettinger) and A2O+MBR. However, it is necessary to improve the process to maintain over DO of 1 mg/L and is required to install a flow control tank to minimize the rainfall effect. Gangbyun STP shows a about 70.2% T-N removal efficiency with A2O+GFF(gravity fiber filtration). However, in order to improve T-N removal efficiency, it is needed to install MLE process to treat recycle water. Noksan STP shows a T-N removal efficiency of about 71.0% with MLE+Chemical treatment and shows stable T-N concentration in effluent. However, it is required a toxic chemical management process because bad wastewater flows into the STP, also is necessary a process improvement in order to increase internal recycling ratio. Especially, it is required a process improvement to increase HRT of nitrification tank because Suyoung and Gangbyeon STPs shows low nitrification efficiency during winter season.

정수처리 응집·한외여과 시스템의 연속운전을 통한 운전조건 결정 및 막오염 특성에 관한 연구 (Determination of operating factor and characteristics of membrane fouling on hybrid coagulation pretreatment-UF system in drinking water treatment)

  • 문성용;윤종섭;김승현
    • 상하수도학회지
    • /
    • 제22권2호
    • /
    • pp.267-274
    • /
    • 2008
  • This study is about efficiency of pretreatment process and operating factor to membrane process at continuous coagulation/ultrafiltration process in water treatment. The capacity of pilot plant was $0.06{\beta}(C)/d$. The raw water used was from Nakdong stream which was characteristized by high organic matter and high turbidity. The result of the test was that coagulation is good process as to high removal rate to organic matter and turbidity but It caused problem to membrane pore blocking. This paper is to determine the membrane fouling potential under different membrane flux, backwash pressure and linear velocity. Backwash pressure and flux is important parameter on operation of membrane system. Those are directly affected on membrane system. When backwash pressure increased from 150 kPa to 200 kPa, the result showed that fouling (pressure increase rate) changed from 3.69 kPa/h to 0.93 kPa/h and the recovery rate changed from 90.7 % to 82.0 %. Linear velocity had slightly effect on fouling. Linear velocity increased from 0.2 m/s to 0.5 m/s, the corresponding pressure rate changed from 0.93 kPa/d to 0.77 kPa/d.