Journal of The Korean Society of Agricultural Engineers
/
v.53
no.4
/
pp.39-47
/
2011
The aim of the study is to predict potential evapotranspiration and crop water requirement using meteorological data from MIROC3.2 with A1B scenario. Increase of evapotranspiration due to temperature rise can be observed out of the analysis, while effective rainfall decreased. The evapotranspiration elevation results in large amount of crop water requirement in the paddy farming. It can be seen that rainfall intensification at non-irrigation period brings effective rainfall decrease, while contributes to higher demand of crop water at irrigation period. It is necessary to secure additional water resources to adapt the climate change. It is expected that estimation on potentialevapotranspiration in this study can be used for formulation of master plan of water resources.
Kim, Yonsoo;Kang, Narae;Jung, Jaewon;Kim, Hung Soo
Journal of Wetlands Research
/
v.18
no.1
/
pp.100-112
/
2016
In recent, the direction of water resources policy is changing from the typical plan for water use and flood control to the sustainable water resources management to improve the quality of life. This change makes the information related to water resources such as data collection, management, and supply is becoming an important concern for decision making of water resources policy. We had analyzed the structured data according to the purpose of providing information on water resources. However, the recent trend is big data and cloud computing which can create new values by linking unstructured data with structured data. Therefore, the trend for the management of water resources information is also changing. According to the paradigm change of information management, this study tried to suggest an application of big data and cloud computing in water resources field for efficient management and use of water. We examined the current state and direction of policy related to water resources information in Korea and an other country. Then we connected volume, velocity and variety which are the three basic components of big data with veracity and value which are additionally mentioned recently. And we discussed the rapid and flexible countermeasures about changes of consumer and increasing big data related to water resources via cloud computing. In the future, the management of water resources information should go to the direction which can enhance the value(Value) of water resources information by big data and cloud computing based on the amount of data(Volume), the speed of data processing(Velocity), the number of types of data(Variety). Also it should enhance the value(Value) of water resources information by the fusion of water and other areas and by the production of accurate information(Veracity) required for water management and prevention of disaster and for protection of life and property.
This study aims at hydrologically demonstrating the universality of power law distribution by analyzing runoff aggregation structures of river basins. Power law distribution is fitted to cumulative drainage area of basins of interest by maximum likelihood, which results in the power law exponents. And then those exponents are assessed in terms of the shape of catchment plan-form. As a main result all of the basins in this study have similar distributions of catchment area. The exponents from this study tend to be higher than the ones from previous researches reflecting self-similar property of the catchment plan-forms of interest. Further study is required about the universality of power law distribution by means of the more realistic flow routing scheme within the framework of DEM.
On the premise of flood control procedure, flood forecasting-warning, system(FFWS) is one of actions for disaster prevention. It makes public announcements for flood situations timely in order to mitigate damage from floodings. Multi-purpose dam which has flood control storage plays an important role in river basin at flood time. In FFWS, it is reservoir operation module that is related to reservoir operation of multi-purpose dam. This study considers the current conditions and problems in reservoir operation module of FFWS in Han River and improves reservoir operation module under limited research scope. As results, additional reservoir operation modules such as Technical ROM(Reservoir Operation Method) and ARD(Approved Release Discharge) ROM were built in FFWS. Using these newly built reservoir operation modules. Han River Flood Control Office will plan and work for flood control and flood forecasting. Firstly, it may plan for flood control by Technical ROM which is deterministic simulation model, and work for final flood control and flood forecasting by ARD ROM according to approved release discharge afterward.
The purpose of this research is to develop an Integrated Water Resources Evaluation Index (IWREI) which can used to assess the performance of water resources projects in a regional perspective focusing on three major sectors including water use, flood, and river environment in water resources policies. The IWREI is estimated by integrating the Water Use Vulnerability Index (WUVI), the Flood Vulnerability Index (FVI), and the River Environment Vulnerability Index (REVI) which represent the vulnerability in each sector. These indices consist of total 26 indicators selected from the pressure indicators representing the causes of damages in water use, flood, and river environment, the state indicators and the response indicators. The estimated index describes the vulnerability and effectiveness of policies with five levels: Low, Medium Low, Medium, Medium High, and High. The results of evaluating total 115 hydrological units in Korea using the WUVI, FVI, REVI, and IWREI indicate that the project effectiveness in water resources policies is clearly verified by the improved index results compared to the past (early 1990s). Regional vulnerability and evaluation indices developed in this research could be used to establish goals of water resources policy and to select priority regions for project implementation.
Journal of the Korean Society of Environmental Restoration Technology
/
v.11
no.4
/
pp.12-23
/
2008
This study has a purpose of setting applicable ecological environment plan items when establishing city development plan. To achieve this purpose, multiple methods of data gathering, documentary surveys, and questionaries research were used in this study. The main findings of this study can be summarized as follows; 1. The appliance of ecological environment plan is appropriate to apply before the establishment of development plan. 2. The items applicable to ecological environment plan establishment step by step is the following. First, it is necessary to prepare the environment improvement plan and ecology restoration on the stage of assigning the area. Second, on the stage of planning development plan, it is required to set the restoration plan of ecological resources and step by step ecological environment plan. Third, on the stage of plan implementation, it is required to set the maintenance guide on ecological environment. 3. The planning items of ecological environment plan are "geographical features and soil", "water resource", "wind resource", "green resource", "circulation of resource", "usage of nature energy" and "habitats", etc. 4. To apply ecological environment plan to the planning of development, it is necessary to specify the clear concepts and specific plan. 5. This study is limited to select generalized planning items and later on, it is necessary to develop detailed planning contents.
Proceedings of the Korea Water Resources Association Conference
/
2007.05a
/
pp.67-73
/
2007
Anhui Province, with a total north-south length of 570km and an east-west width of 450km and a total area of 139.6 thousand km2, accounts for 1.45% of China's total area. The landform and land feature of Anhui Province is diverse, and generally it can be divided into 5 natural regions: (1) Huaibei Plain; (2) Jianghuai Hillocks; (3) Dabie Mountains in the West of Anhui Province; (4) Yanjiang Plain, (5) Mountain Area of southern Anhui Province. Anhui Province is located in the transitional zone of warm and humid zone and subtropical zone, and its mean annual precipitation is 800-1800mm. The province, which has diverse climate, multiple land forms and many rivers and lakes, passes three basins (Huaihe River, Yangtze River and Xin'an River) and has large differences in the time distribution and regional distribution of water resource. Therefore, the development and usage conditions of the water resource in different regions are different.
Journal of the Korean Institute of Landscape Architecture
/
v.35
no.6
/
pp.48-63
/
2008
This research is to apply suitable natural ecosystem evaluation criteria in order to develop the ecosystem conservation, restoration and ways to build substitute habitats as a compensation plan for damaged soundly natural ecosystems in small-scale projects such as resource recovery facility, filtration, etc. The environmental ecology evaluation i.e. generally based on their actual vegetation, community structure, wildlife, water system survey were measured the primary plans for reflecting unique natural environment level of site. As a result, it is necessary to conserve the land in fallow type of wetland, good conservative condition of deciduous forest, wetlanded watercourse for amphibia and reptiles crossing. However, the plan of filtration plant was destroyed wetland(sound ecosystem), natural forest, asian toad spawning area. According to the result of it schemed to build alternative wetland and spawning area, plan to healthy ecosystem and surface soil transplantation as compensation plan. The alternative wetland and spawning area are not only created a various water levels like depth of water is $0{\sim}30cm,\;30{\sim}60cm$, more than 1.5m but also it leads to asian toad spawning and wildlife inhabitant. Moreover, the ecosystem and surface soil transplantation be applied to use the Quercus acutissima forest resources(114 upper trees, 71 canopy trees, 401 shrubs) and surface soil$(5,072m^3)$ in ecology creation sets.
In recent, the integrated water resources management should consider not only existing management objects such as water supply, power generation, and instream flows but also new management objects such as water quantity, water quality, and water habitats which management system is large and complex. Moreover, integrated basin plan or operation are needed for solving conflicts problems between basins and between water usages and to maximize water resources usages. To increase use of optimization method for actual operation and apply various objects, a reservoir operation rule was developed and the KModSim's hydrologic states for integrated water resources management were tested in this study. The simulation results show that the developed operation rules applied in hydrologic states good represent the actual storages of both the Yongdam and the Daecheong Reservoirs so, it is possible to improve the water allocation method usually used in the basin management and manage the integrated basin water resources if new operating rules are applied in optimized programming.
The Tidal Power Plant Management is defined to devise the optimum operating plan and control generating output automatically to obtain maximum production by using adaptive control method. The method to use tidal level observation results is suggested as two(2) kinds of manner, that is the two(2) layer design method by power model simulation and power automatic control.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.