The purpose of this study is to develop an optimal, long-term planning model for improvement of water distribution networks. The water distribution system is divided into sub-zones and the decision of improvement plan is made for each sub-zone. Costs for replacement, rehabilitation and repair, benefits including reduced pumping and leakage costs, and hydraulic reliability are considered to make optimal decision for improvement planning of water network. Harmony search algorithm is applied to optimize the system and hydraulic analysis model EPANET is interfaced with the optimal decision model to check the hydraulic reliability, The developed model is applied to actual water distribution system in Daegu-city, South Korea. The new model which use durability, conveyance and cost as a decision variable is different from existing methods which use only burying period and pipe type and can be used as optimal decision making system for water distribution network.
Lee, Sanguk;Hur, Young Teck;Kim, Youngsung;Kang, Bo-Seung
Proceedings of the Korea Water Resources Association Conference
/
2018.05a
/
pp.459-459
/
2018
서낙동강은 당초 낙동강 본류였으나 1934년 김해평야 일원의 농업용수 공급을 위하여 건설된 대저수문과 녹산수문의 완공 이후 현재의 상태로 유지되고 있다. 서낙동강은 대저수문을 통한 유입과 녹산수문, 녹산배수펌프장을 통한 방류가 시행되고 있으며, 이러한 운영은 외해 조위조건에 따라 간헐적으로 운영되고 있어서, 수체의 정체로 인한 오염도가 높은 실정이다. 또한, 서낙동강 유역은 에코델타시티 등 다양한 개발계획이 수립됨에 따라 수질관리를 위한 여건도 변화할 것으로 예상되며, 이러한 개발에 따른 다양한 수질개선에 대한 사회적 요구가 증대됨에 따라 이를 위한 물순환 개선과 유역에서의 오염부하 저감 등 다양한 수질개선 대책이 필요하다. 본 연구에서는 그간 서낙동강을 대상으로 시행되었던 연구결과와 현재 시행중인 물순환에 대한 효과를 검토하고, 이를 정량화하기 위한 2차원 수리 수질모형(CE-QUAL-W2)을 구축 활용하여 현행 물순환 방안의 운영 효과를 분석하고자 하였다. 당초 환경영향평가시 제시되었던 대저수문과 맥도수문을 통한 유입과 맥도배수펌프장을 통한 유출로 서낙동강, 평강천, 맥도강의 수질을 개선하고자 했던 물순환 계획은 여러 가지 여건으로 인해 시행되지 못하고 있으며, 현재는 매주 강서구청에서 맥도배수펌프장을 이용하여 평강천과 맥도강의 수위를 저하시킨 이후 서낙동강의 하천수를 유입시키는 형태로 물순환을 시행하고 있다. 이러한 현행 물순환 방안에 대한 분석을 위하여 서낙동강, 평강천, 맥도강 구간에 대하여 2차원 수리 수질모형(CE-QUAL-W2)을 이용하여 모의한 결과 현재의 물순환 방법으로는 물순환 유량이 증가하더라도 수질개선에 한계가 있는 것으로 나타났다. 이는 서낙동강에 낙동강 하천수가 대저수문을 통하여 유입된 이후 장기간 체류함에 따라 유역에서의 오염물질 유입의 영향이 크게 나타나며, 이에 따라 평강천과 맥도강에 유입되는 경우 수질개선이 제한적인 것으로 판단된다. 추가적으로 현재 서낙동강 대비 상대적으로 수질이 양호한 낙동강 본류의 하천수를 신규 수문 등의 시설물을 통하여 유입시키는 조건에 대한 분석 결과 현행 물순환 대비 효과가 크며 당초 예상했던 환경영향평가시 목표수질을 달성할 수 있을 것으로 판단보다 상세한 분석과 검토가 필요할 것으로 판단된다.
Journal of the Korea Organic Resources Recycling Association
/
v.31
no.2
/
pp.39-44
/
2023
This study was conducted to analyze problems related to non-water-soluble sanitary products during the treatment of water regeneration centers in E.T.F. and S.T.F. at a time when the demand and supply of non-water-soluble sanitary products are increasing. As a result, the improvement plan of the W.R.C. should focus on pretreatment facilities. When replacing facilities in the future, various dust removers suitable for the facility's reality will be installed in the pretreatment of S.T.F., and it is proposed to link a bar-racks screen with a comprehensive treatment device or install a comprehensive treatment device for impurities alone in the pretreatment of E.T.F.. In addition, a microscreen screen must be installed on the front end of the excretory treatment unit. to separate non-water-soluble materials, and it is necessary to secure a maintenance space for the excretory treatment unit.
Water resources projection typically consists of several stages including emission scenarios, global circulation models (GCMs), downscaling techniques, and hydrological models, and each stage is a source of total uncertainty in water resources projection. Several studies proposed methods to quantify the relative contribution of each stage to total uncertainty, and we call such analysis uncertainty decomposition. Uncertainty decomposition enables us to investigate the stages yielding large uncertainties and to establish the uncertainty reduction plan that reflects them. Interactions between stages is one of the important issues to be considered in uncertainty decomposition. This study suggests a new uncertainty decomposition method considering interaction effect. The proposed method has an advantage of decomposing the total uncertainty to the uncertainty from each stage considering both the main and interactions effects. We apply the proposed method to streamflow projection for Chungju Dam basin. The results show that the uncertainties from the main effects are larger than the uncertainties from interaction effects in both summer and winter. Using the proposed uncertainty decomposition method, we show that the GCM stage is the largest source of the total uncertainty in summer and the downscaling technique stage is the one in winter among the following four stages: emission scenarios, GCMs, downscaling techniques, and hydrological models.
Journal of the Korean Society of Environmental Restoration Technology
/
v.10
no.1
/
pp.1-8
/
2007
The Anyang River which located in an urban area near Seoul had been managed focusing on supplying home and industrial water and preventing floods, coping with rapid industrialization and urbanization. Consequently, it was changed into a deadly river during 25 years. Its channel was straightened by concrete and water quality deteriorated to BOD 190mg/l. In addition, water quantity has been rapidly decreased and has been drying up. Also, as the river ecosystem, landscape, water-friendly function, and so forth were seriously deteriorated, people turn away from the urban river. From 2001, the master plan under the 10-year has been actively carried out centering on the preceding items, which are healthy river in which fishes inhabit, safe river free from floods and droughts, and pleasant river where citizens visit. As a result, its water quality was remarkably improved by BOD 5mg/l in 2005 and some upper zones were improved enough to allow people to swim. Moreover, various animals including fish and birds gather around the river. Now, the 'Anyang River Restoration Project' is recognized as the first comprehensive and systematic nature-friendly urban river improvement in Korea.
Residual wall thicknesses, corrosion rates, and residual life of thirty four samples of cast iron pipes(CIPs) and ductile cast iron pipes(DCIPs) collected from water mains of B city were studied to estimate their remaining service life or optimum time of rehabilitation. The internal maximum corrosion depths of samples measured using a dial gauge after shot blasting were twice higher than the external in most cases. Therefore corrosion of water pipes was much more affected by internal water quality than soil. Residual wall thicknesses of DCIPs were higher than those of CIPs. That reason was thought to be that DCIPs have been protected from internal corrosion by lining cement mortar. Residual life calculated by maximum corrosion rate was ranged up to 44 years with 12.40 years average. Since most CIPs were much deteriorated, rehabilitation plan should be established soon in B city. Residual life of DCIP was 33.52 years average. When cement mortar lining is used up by neutralization of DCIPs. DCIP also should be rehabilitated.
In recent years, interest in river environment such as riparian landscape, water quality and ecological conservation has been growing with increasing recreation on agricultural river watershed. That caused the increase of necessity of water resources development, one of solutions for the diversification of agricultural water demand and shortages. In this respects, heightening irrigation dam, as a part of the 4-major river restoration project, is necessary to secure not only additional agricultural water but also instream flow for water quality improvement. However, operation plan of irrigation dam still not be clear. In this study, additional storage which secured through heightening irrigation dam was estimated using SWAT model. And instream flow effects on water quality of downstream were evaluated. The findings show that the additional water supply will contribute positively to water quantity and quality of downstream. The results show a 2~10% water quality improvement effect on nutrients, as well as an 1~8% water quantity increasing effect. In particular, additional storage can be effectively supplied from February to April by the reservoir operation. However, maintaining better water quality in irrigation reservoirs is important because the water quality of irrigation reservoirs can be negatively impacts the water quality in downstream of reservoirs.
Proceedings of the Korea Water Resources Association Conference
/
2006.05a
/
pp.1444-1449
/
2006
Korea is about 70% of all country to mountain, and basin is consisted of various terrain, soil, vegetation, land use etc. because use land as intensive. Also, need basin hydrologic model that can analysis base outflow as well as outflow directly for calculation of discharge to establish irrigation plan. Inconvenient in use method and user interface offer side is causing by way that existing USGS WEASEL runs in PC Arc/Info, and ArcGIS with development of present GIS technology is applied in many fields offering convenience in analysis that use GIS. In this research, wished to develop suitable outflow parameter extraction system, For this, develop pre-processor and post-processor that effectively draw of hydrologic model input data from water resources DB through van example benchimarking, and developed input/output component of GIS base applicable to various hydrologic and water quality model.
This study performed prediction of extreme rainfall uncertainty and its frequency analysis based on climate change scenarios by Coupled Model Intercomparison Project Phase 5 (CMIP5) for the selected nine-General Circulation Models (GCMs) in the near future (2011-2040) over the Korean Peninsula (KP). We analysed uncertainty of scenarios by multiple model ensemble (MME) technique using non-parametric quantile mapping method and bias correction method in the basin scale of the KP. During the near future, the extreme rainfall shows a significant gradually increasing tendency with the annual variability and uncertainty of extreme ainfall in the RCP4.5, and RCP8.5 scenarios. In addition to the probability rainfall frequency (such as 50 and 100-year return periods) has increased by 4.2% to 10.9% during the near future in 2040. Therefore, in the longer-term water resources master plan, based on the various climate change scenarios (such as CMIP5 GCMs) and its uncertainty can be considered for utilizing of the support tool for decision-makers in water-related disasters management.
Proceedings of the Korea Water Resources Association Conference
/
2023.05a
/
pp.253-253
/
2023
유역의 수량, 수질, 수생태, 지하수, 하천환경, 기후변화, 오염원, 하천 친수공간, 농업경작지 등 수자원 관점의 물순환의 범위를 넘어서 환경, 기후변화 적응, 경제성, 사회문화 등 다양한 분야를 포함한 통합적인 유역의 물관리 이슈와 문제점을 해결할 필요가 있다. 물순환 관리의 개념은 국토개발과 도시화에 따라 파생된 물순환 왜곡 및 그에 따른 제반 물문제(홍수량 증가에 따른 침수피해, 직접 유출량 증가에 따른 가용 수자원의 감소 등)의 해결을 위한 물관리 행위 전체로 볼 수 있다. 물순환 관리의 범위는 홍수량 감소를 위한 홍수관리, 가용 수자원의 증대를 위한 물 확보 등 물관리 전반을 포함해야 한다. 기존의 물순환 사업은 비점오염 관리에 중점을 두고 LID를 활용한 빗물 침투율 증대와 빗물 재이용 등의 관련 정책을 추진하였으나 이는 물순환 체계 전반을 다루고 있지 못하고 수질 개선에그 효과가 집중되었다. 따라서, 수량·수질·수생태·재이용 등을 종합적으로 고려한 물순환 관리에 대한 연구가 필요하며, 이를 통하여 개별적이고 시설물 중심인 기존 대책의 한계를 극복하고 통합물관리 관점의 물순환 건전성을 기반으로 유역의 안심공간 조성방안을 수립할 필요가 있다. 본 연구에서는 물순환 전반을 연계한 통합적인 물관리를 통하여 물 안심공간을 조성하기 위한 토대를 제시하는 것을 목표로 하며, 통합물관리 관점의 물순환 관련 데이터 수집, 유역별 물순환 수준의 진단 및 평가를 통하여 시범사업 모델을 마련하고, 사업에 따른 효과분석을 기반으로 중장기 추진계획 수립을 통한 실행력을 확보하는 것을 목적으로 한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.