Simulation of Water Hammer Mitigation at Seobyun Pumping Station (서변 가압장에서 수격현상 완화에 대한 연구)

  • Kim, Sang Hyun;Park, Nam Sik;Jung, Bong Seog;Lee, Dong Hyun
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.13 no.2
    • /
    • pp.95-104
    • /
    • 1999
  • A simulation of water hammer, introduced by abruptly varied motion of a pumping machine, was performed at a one of typical pumping station in Korea. Impact of hydraulic structure such as check valve, pressure relief valve and air valve in mitigating water hammer effect was estimated gradually. Method of characteristic was employed for the effective calculation of discharge and head. The relationship between various hydraulic structures and flow was properly integrated on the base of the method of characteristic. The methodology in this approach can provide significant contribution in decision making procedure for the design of hydraulic structure at a typical pumping station in Korea.

  • PDF

Study on the Effects of Flows on the Acceleration of the Grooving Corrosion in the ERW Pipe (ERW강관에서 홈부식의 가속화에 미치는 유동의 영향에 관한 연구)

  • Kim, Jae-Seong;Kim, Yong;Lee, Bo-Young
    • Journal of Welding and Joining
    • /
    • v.26 no.4
    • /
    • pp.85-91
    • /
    • 2008
  • The grooving corrosion is caused mainly by the different microstructures between the matrix and weld which is formed during the rapid heating and cooling cycle in welding. By this localized corrosion reaction of pipes, it evolves economic problems such as the early damage of industrial facilities and pipe lines of apartment, and water pollution. So lots of researches were carried out already about grooving corrosion mechanism of ERW carbon steel pipe but there is seldom study for water hammer happened by fluid phenomenon and corrosion rate by flow velocity. In this study, the analysis based on hydrodynamic and fracture mechanics was carried out. ANSYS, FLUENT and STAR-CD were used for confirmation of flow phenomenon and stress on the pipe. As the results, fatigue failure is able to be happened by water hammer and grooving corrosion rate is increased cause by turbulent. Grooving corrosion is happened on the pipe, then friction loss of fluid is occurred from corroded part. Erosion can be happened enough in corroded region of microscopic size that wear "V" form. Also pipe is able to be damaged by water hammer effects because of corroded region is general acting as a notch effects. Corrosion depth was more than half of total thickness, it can be damaged from water hammer pressure.

Experimental Investigation on Water Hammer Phenomenon in the Recirculation Line of a Liquid Rocket Engine (액체로켓엔진 재순환 유로에서의 수격현상에 관한 실험적 연구)

  • Kim, Bokyem;Hong, Moongeun;Lee, Jisung;Kim, Junghan
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.25 no.2
    • /
    • pp.110-118
    • /
    • 2021
  • In a liquid rocket engine system, the flow of oxidizer into the combustion chamber is controlled by the main oxidizer shut-off valve. When the valve is closed, the oxidizer flows via the recirculation line, not into the combustion chamber. In this situation, the measured pressure could be much higher than a design value because of the water hammer phenomenon. In this paper, the experiments on the water hammer in the recirculation line with different initial conditions were conducted in order to study the pressure wave produced in each case. According to the experimental results, characteristics of the pressure wave in the recirculation line depend on the initial condition. To be specific, the pressure surge is maximized in case that the shock is condensation-oriented in the end of the recirculation line.

Water-hammer in the Pump Pipeline System with and without an Air-Chamber (에어챔버 설치에 따른 펌프관로계의 수격현상)

  • Lee, Sun-Kon;Yang, Cheol-Soo
    • Journal of the Korean Society of Safety
    • /
    • v.26 no.1
    • /
    • pp.1-7
    • /
    • 2011
  • When the pumps stopped in the operation by the power failure, the hydraulic transients take place in the sudden change of a velocity of pipe line. Each and every water hammer problem shows the critical stage to be greatly affected the facts of safety and reliability in case of power failure. The field tests of the water hammer executed at Cheong-Yang booster pump station having an air chamber. The effects were studied by both the practical experiments and the CFD(Computational Fluid Dynamics : Surge 2008). The result states that the system with water hammering protection equipment was much safer when power failure happens. The following data by a computational fluid dynamic analysis are to be shown below, securing the system stability and integrity. (1) With water hammering protection equipment. (1) Change of pressure : Up to $15.5\;kg/cm^2$ in contrary to estimating $16.88\;kg/cm^2$. (2) Change rate of water level : 52~33% in contrary to estimating 55~27%. (3) Note that the operational pressure of pump runs approx. 145 m, lowering 155 m of the regularity head of pump. (4) Note that the cycle of water hammering delays from 80 second to 100 second, together with easing the function of air value at the pneumatic lines. (2) Change of pressure without water hammering protection equipment : Approximate $22.86\;kg/cm^2$. The comprehensive result says that the computational fluid dynamics analysis would match well with the practical field-test. It was able to predict Max. or Min. water hammering time in a piping system. This study aims effectively to alleviate water hammering in a pipe line to be installed with air chamber at the pumping station and results in making the stability of pump system in the end.

The Optimum Control Study for Improving Efficiency of the Small Hydropower Generation in Water Pipe (수도관로 소수력발전 운영효율 향상을 위한 최적제어 방안)

  • Hong, Jeong-Jo;Rim, Dong-Heui;Kim, Soo-Sang
    • New & Renewable Energy
    • /
    • v.4 no.2
    • /
    • pp.31-38
    • /
    • 2008
  • Using a surplus head in presented water supply pipes, we have studied to improve the operating efficiency of small hydro generator, which was chosen for a test model with 00 hydro power plant. With regard to power control and countermeasure of water hammer impact, Finally we have represented the optimal control method through the synthetical analysis of existing system symptoms, operation efficiency, the effect of water hammer impact and system configuration.

  • PDF

The Development of Dynamic Model for Long-Term Simulation in Water Distribution Systems (상수관망시스템에서의 장기간 모의를 위한 동역학적 모형의 개발)

  • Park, Jae-Hong
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.4
    • /
    • pp.325-334
    • /
    • 2007
  • In this study, a long-term unsteady simulation model has been developed using rigid water column theory which is more accurate than Extended-period model and more efficient comparing with water-hammer simulation model. The developed model is applied to 24-hours unsteady simulation considering daily water-demand and water-hammer analysis caused by closing a valve. For the case of 24-hours daily simulation, the pressure of each node decreases as the water demand increase, and when the water demand decrease, the pressure increases. During the simulation, the amplitudes of flow and pressure variation are different in each node and the pattern of flow variation as well as water demand is quite different than that of KYPIPE2. Such discrepancy necessitates the development of unsteady flow analysis model in water distribution network system. When the model is applied to water-hammer analysis, the pressure and flow variation occurred simultaneously through the entire network system by neglecting the compressibility of water. Although water-hammer model shows the lag of travel time due to fluid elasticity, in the aspect of pressure and flow fluctuation, the trend of overall variation and quantity of the result are similar to that of water-hammer model. This model is expected for the analysis of gradual long-term unsteady flow variations providing computational accuracy and efficiency as well as identifying pollutant dispersion, pressure control, leakage reduction corresponding to flow-demand pattern, and management of long-term pipeline net work systems related with flowrate and pressure variation in pipeline network systems

Analysis of Flow on Grooving Corrosion at the Weld of a Carbon Steel pipe made by Electrical Resistance Welding (전기저항 용접강관의 홈부식에 미치는 유동 해석)

  • Kim, Yong;Jang, Hyeuk;Ryu, Duck-Hee;Kim, Jae-Seong;Lee, Bo-Young;Boo, Joon-Hong
    • Proceedings of the KSME Conference
    • /
    • 2004.11a
    • /
    • pp.1-6
    • /
    • 2004
  • Lots of researches were gone already about grooving corrosion mechanism of ERW carbon steel pipe. But there is seldom study for water hammer happened by fluid and acceleration of corrosion rate by incresed flow velocity. Therefore, in this study carried out the analysis based on hydrodynamic and fracture mechanics. Analyzed stress that act on a pipe using ANSYS as a program, and also FLUENT and STAR-CD were used for flow phenomenon confirmation. As the result, fatigue failure is happened by water hammer and corrosion rate was increased because of turbulent flow.

  • PDF

Evaluation of the parameters affecting the Schmidt rebound hammer reading using ANFIS method

  • Toghroli, Ali;Darvishmoghaddam, Ehsan;Zandi, Yousef;Parvan, Mahdi;Safa, Maryam;Abdullahi, Muazu Mohammed;Heydari, Abbas;Wakil, Karzan;Gebreel, Saad A.M.;Khorami, Majid
    • Computers and Concrete
    • /
    • v.21 no.5
    • /
    • pp.525-530
    • /
    • 2018
  • As a nondestructive testing method, the Schmidt rebound hammer is widely used for structural health monitoring. During application, a Schmidt hammer hits the surface of a concrete mass. According to the principle of rebound, concrete strength depends on the hardness of the concrete energy surface. Study aims to identify the main variables affecting the results of Schmidt rebound hammer reading and consequently the results of structural health monitoring of concrete structures using adaptive neuro-fuzzy inference system (ANFIS). The ANFIS process for variable selection was applied for this purpose. This procedure comprises some methods that determine a subsection of the entire set of detailed factors, which present analytical capability. ANFIS was applied to complete a flexible search. Afterward, this method was applied to conclude how the five main factors (namely, age, silica fume, fine aggregate, coarse aggregate, and water) used in designing concrete mixture influence the Schmidt rebound hammer reading and consequently the structural health monitoring accuracy. Results show that water is considered the most significant parameter of the Schmidt rebound hammer reading. The details of this study are discussed thoroughly.

A Computational Analysis of Water-Hammer (수격현상에 대한 수치적 고찰)

  • Chun, Kwang-Min
    • The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
    • /
    • v.11 no.1
    • /
    • pp.1-10
    • /
    • 1982
  • The water-hammer phenomena caused by pump power failure are analysed by digital computer. Asan cool ins water pipe system has been chosen as a model. It is Shown that after power failure the pressure at the pump outlet drops sharply, and to prevent reverse flow, either butterfly valve or check valve can be used. After the valve closure, pressure oscillates behind the valve. To weaken the pressure wave, it is recommended to install a servo-operated valve in a bypass Line around the pamp and the check valve.

  • PDF

Study on the Fractures Types of PHC Pile by Impact Load of Follower (보조말뚝의 충격하중에 의한 PHC말뚝의 파손유형 고찰)

  • Seo, Dong-Nam;Choi, Sang-Ho;Kim, Jin-Sik;Kim, Min-Kab;Lee, Dong-Hyeon;Cho, Seong-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.144-145
    • /
    • 2021
  • This study analyzed the cases of cracks in piles due to the use of followers under construction conditions where water exists inside the piles, and confirmed whether the piles were cracked through a field test simulating the construction conditions in which water pressure inside the piles was generated by a hammer. According to the construction case, under the construction condition where the pile length is 20% to 30% shorter than the drilled length, about 80% cracks occur, so there is a high possibility of cracking due to water inside the pile. A field test was conducted to confirm the type of pile failure due to hammer under the construction condition in which water exists inside the pile. The pile head was not destroyed by the compressive load, and one or more longitudinal cracks occurred along the PC steel wire. The closed end pile generates water pressure by hammer. the follower and cushion(compression plywood) must be drilled at least 0.4D. It is expected that improved quality control will be possible as the water pressure inside the pile is reduced.

  • PDF