• Title/Summary/Keyword: Waiting Time

Search Result 1,083, Processing Time 0.026 seconds

Development of Left Turn Response System Based on LiDAR for Traffic Signal Control

  • Park, Jeong-In
    • Journal of the Korea Society of Computer and Information
    • /
    • v.27 no.11
    • /
    • pp.181-190
    • /
    • 2022
  • In this paper, we use a LiDAR sensor and an image camera to detect a left-turning waiting vehicle in two ways, unlike the existing image-type or loop-type left-turn detection system, and a left-turn traffic signal corresponding to the waiting length of the left-turning lane. A system that can efficiently assign a system is introduced. For the LiDAR signal transmitted and received by the LiDAR sensor, the left-turn waiting vehicle is detected in real time, and the image by the video camera is analyzed in real time or at regular intervals, thereby reducing unnecessary computational processing and enabling real-time sensitive processing. As a result of performing a performance test for 5 hours every day for one week with an intersection simulation using an actual signal processor, a detection rate of 99.9%, which was improved by 3% to 5% compared to the existing method, was recorded. The advantage is that 99.9% of vehicles waiting to turn left are detected by the LiDAR sensor, and even if an intentional omission of detection occurs, an immediate response is possible through self-correction using the video, so the excessive waiting time of vehicles waiting to turn left is controlled by all lanes in the intersection. was able to guide the flow of traffic smoothly. In addition, when applied to an intersection in the outskirts of which left-turning vehicles are rare, service reliability and efficiency can be improved by reducing unnecessary signal costs.

Waiting-time Dependent Backordering Rate Under Partial Backlogging and Finite Production Rate (품절 발생시 대기시간에 따른 Backorder 전환 비율에 관한 연구)

  • Jung, Ki-Seung;Hwang, Hark
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.33 no.1
    • /
    • pp.26-32
    • /
    • 2007
  • This study deals with waiting-time dependent backordering rate during stock-out period in the EconomicProduction Quantity (EPQ) model. Assuming that the backordering rate follows an exponentially decreasingfunction of the waiting time, the backorder rate is developed under First-Come-First-Served (FCFS) andLast-Come-First-Served (LCFS) Policy. The mathematical models are developed based on differential equations.Through numerical examples, the validity of the developed models is illustrated.

A study on Elevator Group Controller of High Building using Adaptive Dual Fuzzy Algorithm (Adaptive Dual Fuzzy 알고리즘을 이용한 고층 빌딩의 엘리베이터 군 제어에 관한 연구)

  • Choi, Seung-Min;Kim, Hum-Mo
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.18 no.4
    • /
    • pp.112-120
    • /
    • 2001
  • In this paper, the development of a new group controller for high-speed elevator is carried out utilizing the approach of an adaptive dual fuzzy logic. Some goals of control are the minimization of waiting time, mean-waiting time and long-waiting time in a high building, when a new hall call is generated, adaptive dual fuzzy controller evaluate traffic pattern and change appropriately the membership function of a fuzzy rule base. Controls for co-operation among elevators in a group control algorithm arte essential, and the most critical control function in the group controller is an effective and proper hall call assignment of elevators. The group elevator system utilizing adaptive dual fuzzy control reveals a great deal of improvement on its performance.

  • PDF

A Design for Elevator Group Controller of Building using Adaptive Dual Fuzzy Algorithm (Adaptive Dual Fuzzy 알고리즘을 이용한 빌딩의 엘리베이터 군 제어기 설계)

  • 최승민;김훈모
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2001.04a
    • /
    • pp.578-581
    • /
    • 2001
  • In this paper, the development of a new group controller for high-speed elevator is carried out utilizing approach of an adaptive dual fuzzy logic. A goals of control are the minimization of waiting time, mean-waiting time and long-waiting time in a building. when a new hall call is generated, adaptive dual fuzzy controller evaluate traffic pattern and change appropriately the membership function of fuzzy rule base. Control for co-operation among elevators in group control algorithm are essential, and the most critical control function in group controller is a effective and proper hall call assignment of elevators. Thy group elevator system utilizing adaptive dual fuzzy control reveals a great deal of improvement on its performance.

  • PDF

A Simulation of Elevator Group Controller using Adaptive Dual Fuzzy Algorithm (Adaptive Dual Fuzzy 알고리즘을 이용한 엘리베이터 군 제어 시뮬레이션)

  • 최승민;김훈모
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2000.11a
    • /
    • pp.157-160
    • /
    • 2000
  • In this paper, the development of a new group controller for high-speed elevator is carried out utilizing approach of an adaptive dual fuzzy logic. A goals of control are the minimization of waiting time, mean-waiting time and long-waiting time in a high building, when a new hall call is generated, adaptive dual fuzzy controller evaluate traffic pattern and change appropriately the membership function of fuzzy rule, base. Control for co-operation among elevators in group control algorithm are essential , and the most critical control function in group controller is a effective and proper hall call assignment of elevators. The group elevator system utilizing adaptive dual fuzzy control reveals a great deal of improvement on its performance.

  • PDF

Optimization Algorithms for a Two-Machine Permutation Flowshop with Limited Waiting Times Constraint and Ready Times of Jobs

  • Choi, Seong-Woo
    • Journal of Information Technology Applications and Management
    • /
    • v.22 no.2
    • /
    • pp.1-17
    • /
    • 2015
  • In this research, we develop and suggest branch and bound algorithms for a two-machine permutation flowshop scheduling problem with the objective of minimizing makespan. In this scheduling problem, after each job is operated on the machine 1 (first machine), the job has to start its second operation on machine 2 (second machine) within its corresponding limited waiting time. In addition, each job has its corresponding ready time at the machine 1. For this scheduling problem, we develop various dominance properties and three lower bounding schemes, which are used for the suggested branch and bound algorithm. In the results of computational tests, the branch and bound algorithms with dominance properties and lower bounding schemes, which are suggested in this paper, can give optimal solution within shorter CPU times than the branch and bound algorithms without those. Therefore, we can say that the suggested dominance properties and lower bounding schemes are efficient.

A Design for Elevator Group Controller of Building Using Adaptive Dual Fuzzy Algorithm

  • Kim, Hun-Mo
    • Journal of Mechanical Science and Technology
    • /
    • v.15 no.12
    • /
    • pp.1664-1675
    • /
    • 2001
  • In this paper, the development of a new group controller for high-speed elevators is described utilizing the approach of adaptive dual fuzzy logic. Some goals of the control are to minimize the waiting time, mean-waiting time and long-waiting time in a building. When a new hall call is generated, all adaptive dual fuzzy controller evaluates the traffic patterns and changes the membership function of a fuzzy rule base appropriately. A control algorithm is essential to control the cooperation of multiple elevators in a group and the most critical control function in the group controller is an effective and proper hall call assignment of the elevators. The group elevator system utilizing adaptive dual fuzzy control clearly performs more effectively than previous group controllers.

  • PDF

Algorithm of Optimal Traffic Signal Cycle using Neural Network and Fuzzy Rules (신경망 및 퍼지규칙을 이용한 최적 교통신호주기 알고리즘)

  • 홍용식;박종국
    • Journal of the Korean Institute of Telematics and Electronics C
    • /
    • v.34C no.8
    • /
    • pp.88-100
    • /
    • 1997
  • This paper proposes a new concept for an optimal traffic signal cycle method which will reduce the average vehicle waiting time and improve average vehicle speed. Electro sensitive traffic system can extend the traffic cycle when there ar emany vehicles in the road or it can reduce the traffic consider vehicle length, so it can cause oveflow and reduce average vechicel waiting time at the intersection, we propose on optimal traffic cycle with fuzzy ruels and neural network. Computer simulation results prove that reducing the average vehicle waiting time which proposed considering passing vehicle's length for the optimal traffic cycle better than fixe dsignal method dosen't consider vehicle length.

  • PDF

Integrated Model of Inventory and Waiting Time in EV Battery Switching Stations (배터리 교체식 전기차의 배터리 재고-차량 대기시간 통합모형)

  • Seo, Yong Won
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.37 no.4
    • /
    • pp.51-65
    • /
    • 2012
  • Battery switching EVs are considered to be a promising alternative to overcome long charging time problems in the EV adoption. The purpose of this research is to develop integrated model for battery inventory and battery switching waiting times. Due to complexity of exact analysis, a practical approximation method is developed, which provides close results to exact values. Numerical experiments show that there exist trade-offs between the battery inventory level and the number of switching stations. The proposed model can be applied to evaluate and select the minimum cost alternative in implementing the battery switching stations.

Two Queue Single Server Model for the DQDB Man

  • Noh, Seung J.
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.22 no.2
    • /
    • pp.31-44
    • /
    • 1997
  • This paper presents an approximate analytical model to estimate the mean packet walting times at the stations in the IEEE 802, 6 subnetwork of a metropolitan area network. Each station is modeled as a two queue single server system, which serves data packets and requests from downstream stations according to the DQDB protocol. The model estimates the mean waiting time of the requests and in turn, using the discrete time work conservation law, estimates the mean waiting time for packets. Simulation experiments shows that the model accurately works even under very high traffic loads.

  • PDF