• Title/Summary/Keyword: WBS

Search Result 220, Processing Time 0.025 seconds

A study of actual planning how to increase IT productivity by COCOMO II Model (IT산업 생산성 향상을 위한 프로젝트 실행계획 수립 방안 연구 - COCOMO II 적용사례)

  • Park, Cheol-Gu;Kim, Chang-Eun
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.2
    • /
    • pp.147-152
    • /
    • 2010
  • Project implementation plan is a blueprint that confirms project performance activities and specifies required man-hour, period and resource imput ratio. Various figures, the results of implementation plan, are predicted through estimation, and because of superiority of objectivity and repeatability, numerical formula-based estimation model is often used overseas. COCOMO model is the representative estimation model whose theories and formulas are publicized and it predicts the total man-hour required for software system development. This model is publicized in "Software Engineering Economics" written by Professor Barry Boehm of the U.S., and is the most widely applied numerical formula-based estimation model. This study is conducted to provide a series of methods that are optimal for KTDS environment by choosing COCOMO II model among various types of COCOMO models. In establishing implementation plan, COCOMO II model alone is not sufficient, it is necessary to link with and apply standard WBS system and standard man-hour. In establishing specific implementation plan, phased standard WBS system in order of the first phase of all the activities implemented in the project, Activity, Task, and Role, and the man-hour put into this should be distributed according to standard ratio from COCOMO II model's total man-hour. This study provides explainations by establishing standard WBS system and linking with COCOMO II model.

A Study on developing WBS based QDBS(Quantity Database System) for the schedule and the cost data integration for road construction project (도로공사의 공정 및 공사비 연계활용을 위한 디지털 수량산출정보시스템(QDBS) 개발 연구)

  • Yun, Seok-Heon;Kim, Seong-Sig
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.119-127
    • /
    • 2007
  • Cost and Schedule is the most important information, and how efficiently manage this information is the key issue for Construction Project Management. Domestically, systematic scheduling method such as CPM network is not only used widely but integration of time and cost information also is. In order to effectively integrate and use the time and cost information, it is suggested that WBS(Work Breakdown Structure) based QDB(Quantity Database) should be generated from the design phase and, WBS and QDB related system tool should be supported. It could be helpful to relate and integrate other construction project information.

Human Resource Allocation Method using Similarity between Software Project Experience and WBS Activity (S/W 프로젝트 수행 경험과 WBS Activity의 유사도 측청을 통한 인력 할당 기법)

  • Kwon, Jinyong;Lee, Euijong;Baik, Doo-Kwon
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2015.04a
    • /
    • pp.530-533
    • /
    • 2015
  • 기존의 조사에 따르면 현재 소프트웨어 개발 프로젝트의 실패율은 높은 편이다. 미국의 The Standish Group의 보고서에 따르면 소프트웨어 프로젝트의 성공률은 약 32%로 낮음을 볼 수 있다. 소프트웨어 프로젝트 성공에 영향을 주는 요소 중 하나는 인력배치이다. 이는 소프트웨어 개발 프로젝트의 참여 인력 구성에 따라 생산성, 비용 및 개발기간이 달라지게 되기 때문이다. 즉 인력 구성에 따라 프로젝트 성공률에 많은 영향을 주게 될 수 있다. 프로젝트 인력할당은 WBS(Work Breakdown Structure)에 따라 PM(Project Manager) 또는 부서장이 할당하게 되는데, 이들은 프로젝트 구성원들의 상세한 정보까지 파악이 어렵기 때문에 인력구성의 어려움이 존재한다. 과거에 수행했던 개발 프로젝트에서 유사성이 높은 작업을 했음에도 불구하고 전혀 경험이 없는 작업에 할당되면 상대적으로 업무 지식습득에 어려움을 겪고 시간 지연에 따른 비용이 추가적으로 발생하게 된다. 이러한 문제를 해결하고자 본 연구는 소프트웨어 개발 프로젝트 구성원의 상세한 정보들과 소프트웨어 개발 업무와의 유사도 측정을 통해 인력을 업무에 할당하는 기법을 제안한다. 이를 위하여 제안한 기법을 프로토타입으로 구현한 후 현업에서 실제 개발되는 프로젝트에 적용하여 제안 기법의 우수함을 평가한다.

A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Lee, Sung-Woo;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.2
    • /
    • pp.127-137
    • /
    • 2019
  • In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.

Apartment house project cost schedule for integrated management BIM-based BoQ application plan (공동주택 프로젝트 비용일정통합 관리를 위한 BIM 기반 BoQ 구축 및 활용 방안)

  • Zheng, Lianyi;Kim, Woong-Gi;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.11 no.2
    • /
    • pp.1-16
    • /
    • 2021
  • Since entering the 21st century, the construction industry has developed faster and faster, and more and more technologies have been applied in the construction industry. BIM technology (Building Information Modeling) was born in this environment. The application of BIM technology can greatly improve the efficiency of cost management and help achieve the goal of cost management. But through BIM to realize project cost management, there is still no good solution. In order to solve this problem, this paper puts forward the concept of WBS structure applied to construction projects by studying the BoQ (Bill of Quantities) list based on BIM, and proposes the numbering method of the structure. The WBS (Work Breakdown Structure) structure proposed in this paper divides more than 5000 cost objects into 133 projects according to the type of work and project schedule. This structure helps to realize the application of BIM in project cost management. Although this article has studied more than 5000 data of three projects, it does not think that it can cover all cost objects in the existing construction industry. The purpose of this article is to propose a solution for cost and Process Control using BIM-based BoQ data.

A Suggestion of Contingency Guidelines According to ISDC Based on Overseas Contingency Data

  • Minhee Kim;Chang-Lak Kim;Sanghwa Shin
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.20 no.4
    • /
    • pp.541-550
    • /
    • 2022
  • When decommissioning nuclear power plant (NPP), the first task performed is cost estimation. This is an important task in terms of securing adequate decommissioning funds and managing the schedule. Therefore, many countries and institutions are conducting continuous research and also developing and using many programs for cost estimation. However, the cost estimated for decommissioning an NPP typically differs from the actual cost incurred in its decommissioning. This is caused by insufficient experience in decommissioning NPPs or lack of decommissioning cost data. This uncertainty in cost estimation can be in general compensated for by applying a contingency. However, reflecting an appropriate standard for the contingency is also difficult. Therefore, in this study, data analysis was conducted based on the contingency guideline suggested by each institution and the actual cost of decommissioning the NPP. Subsequently, TLG Service, Inc.'s process, which recently suggested specific decommissioning costs, was matched with ISDC (International Structure for Decommissioning Costing)'s work breakdown structure (WBS). Based on the matching result, the guideline for applying the contingency for ISDC's WBS Level 1 were presented. This study will be helpful in cost estimation by applying appropriate contingency guidelines in countries or institutions that have no experience in decommissioning NPPs.

Extension of IFC information Modeling for Fire Safety based on WBS (작업분류체계 기반 소방 객체 IFC 정보 모델링 확장 방안 연구)

  • Won, Junghye;Kim, Taehoon;Choo, Seoungyeon
    • Journal of KIBIM
    • /
    • v.13 no.2
    • /
    • pp.37-46
    • /
    • 2023
  • The main objective of this study is to propose a method to enhance building safety using the Industry Foundation Classes (IFC) schema in Building Information Modeling (BIM). To achieve this goal, a fire object relationship diagram is created by using the Model View Definition (MVD) and Property Set (Pset) methodology, as well as the Work Breakdown Structure (WBS) based object relationship analysis. The proposed method illustrates how to represent objects and tasks related to fire prevention and human safety during a building fire, including variables that are relevant to these aspects. Furthermore, the proposed method offers the advantage of considering both the IFC object hierarchy and the project work hierarchy when creating new objects, thereby expanding the attribute information for fire safety and maintenance. However, upon confirmation via an IFC viewer after development, a problem with the accuracy of mapping between attributes and objects arises due to the issue of proxy representation of related object information and newly added object information in standard IFC. Therefore, in future research, a mapping method for fire safety objects will be developed to ensure accurate representation, and the scope of utilization of the fire safety object diagram will be expanded. Furthermore, efforts will be made to enhance the accuracy of object and task representation. This research is expected to contribute significantly to the technological development of building safety and fire facility design in the future.

A Study on Applying Information Framework for BIM Based WBS -Focusing on Civil Construction- (BIM기반의 WBS 구축을 위한 정보프레임워크 도입방안 연구 -토목사업의 적용을 중심으로-)

  • Nam, Jeong-Yong;Jo, Chan-Won;Park, So-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.770-777
    • /
    • 2017
  • Building information modeling (BIM) has been receiving attention as an integrated information model instead of CAD since the 2000s. BIM technology was first used in the architectural field and was later introduced to the civil engineering field. However, the government announced a plan for the application of BIM to 20% of all SOC projects from 2020, so the adoption of BIM technology is expected to accelerate. In order to successfully adopt BIM, a systematic structure should be supported for integrated design information and implementation technology. Also, it is important to establish the relationship between information systems because many complicated factors are intertwined in the construction industry. In this study, we propose a framework for constructing integrated information through identifying the information relations for introducing BIM in the civil engineering industry. We applied this framework to a bridge project to confirm its effectiveness. This study can be applied to the integrated management of the construction process and costs by introduction of a work breakdown structure (WBS) to BIM. In addition, this study is expected to contribute to the adoption of BIM in the civil engineering field through the proposal of information system standardization in this field.

Association of Heat Shock Protein Beta 1 (HSPB1) Gene Expression with Tenderness in Loin Muscle of Korean Cattle (Hanwoo) (한우 등심조직 내 heat shock protein beta 1 (HSPB1) 발현과 연도와의 관련성 연구)

  • Lim, Dajeong;Lee, Seung-Hwan;Cho, Yong-Min;Choi, Bong-Hwan;Choi, Han-Ha;Seong, Hwan-Hoo;Hong, Seong-Koo;Kim, Nam-Kuk
    • Journal of Life Science
    • /
    • v.22 no.11
    • /
    • pp.1523-1528
    • /
    • 2012
  • In a previous proteomic study, heat shock protein beta 1 (HSPB1) was detected as differentially expressed protein in longissimus thoracis between low (grade 3) and high (grade 1++) meat quality groups by 2DE gel electrophoresis. The present study investigated an association of HSPB1 expression at the level of gene and protein with Warner-Bratzler shear force (WBS) measured in 20 Hanwoo steers. An analysis of variance (ANOVA) between expression values and WBS showed that WBS was affected by HSPB1 expression (p<0.05). The expression (at both gene and protein level) of the HSPB1 was 2 times higher in the low WBS group than that in the high WBS group (p<0.01). This result suggests that the HSPB1 gene may be a candidate gene associated with tenderness in longissimus thoracis of Korean cattle.