• Title/Summary/Keyword: WATERSHED MANAGEMENT

Search Result 1,153, Processing Time 0.024 seconds

Integrated Approach for Watershed Management in an Urban Area (도시 유역 관리를 위한 통합적인 접근방법)

  • Lee, Kil-Seong;Chung, Eun-Sung;Kim, Young-Oh
    • Journal of Korea Water Resources Association
    • /
    • v.39 no.2 s.163
    • /
    • pp.161-178
    • /
    • 2006
  • Heathcote (1998) identified a systematic, seven-step approach to general watershed planning and management. It consists of 1) understanding watershed components and processes, 2) identifying and ranking problems to be solved, 3) setting clear and specific goals, 4) developing a list of management options, 5) eliminating infeasible options 6) testing the effectiveness of remaining feasible options, and 7) developing the final options. In this study the first five steps of that process were applied to the Anyangcheon watershed in Korea, which experiences streamflow depletion, frequent flood damages, and poor water quality typical of highly urbanized watersheds. This study employed four indices: Potential Flood Damage(PFD), Potential Streamflow Depletion(PSD), Potential Water Quality Deterioration(PWQD) and Watershed Evaluation Index(WEI) to identify and quantify problems within the watershed. WEI is the integration index of the others. Composite programming which is a method of multi-criteria decision making is applied for the calculation of PSD, PWQD and WEI (Step 2). The primary goal of the study is to secure instreamflow in the Anyangcheon during dry seasons. The second management goals of flood damage mitigation and water quality enhancement are also set (Step 3). Management options include not only structural measures that can alter the existing conditions, but also nonstructural measures that rely on changes in human behavior or management practices (Step 4). Certain management options which are not technically, economically, and environmentally feasible, are eliminated (Step S). Therefore, this study addresses a Pre-feasibility study, which established a master plan using Steps 1 through 5.

Watershed Management in Changjiang River

  • Fuxuan, Chang;Jin, Chen;Wei, Huang;Zhouying, Zhang
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.102-110
    • /
    • 2004
  • In this paper, we introduce the watershed management (WSM) in Changjiang river. The Changjiang river and Changjiang Water Resources Commission (CWRC) are introduced. Then the acheivements and problems of Changjiang river watershed management are discussed. Lastly, the challenge and task are prospected.

  • PDF

Applicability of Impervious Cover Index for Water Environment Management (물 환경관리를 위한 불투수면 지표의 적용성 연구)

  • Choi, Ji-yong;Kim, Byung-ik;Park, Baek-soo;Chung, Eun-sung
    • Journal of Korean Society on Water Environment
    • /
    • v.24 no.6
    • /
    • pp.767-772
    • /
    • 2008
  • Studies regarding the application of the impervious cover rate as a watershed management index have increased in number due to concerns over watershed management. The impervious cover rate is suggested as an index that can manage not only water quality but also water volume and the water ecosystem. This study intends to prove its applicability through the interconnection of the impervious cover rate and the water environment in Korea. Analysis of a selected watershed with reference to impervious cover rates showed that a watershed with an impervious cover rate of over 30% had a direct runoff in excess of 60% of precipitation, while a watershed with an impervious cover rate of 7% had a direct runoff of 39%. Watersheds with higher impervious cover rates were also found to have higher BOD, though different watersheds showed slightly different aspects in connection with BOD. Monitoring of benthic macroinvertebrates showed that species inhabiting clean water appear more frequently in areas with lower impervious cover rates than areas with higher impervious cover rates, and in mainstream areas, relatively larger numbers of species appeared in areas with lower impervious cover rates. This suggests that impervious cover rates can be appropriately used as an index for watershed management, as it effectively represents changes to the water environment.

Development and Application of Freshwater Lake Water Quality Management System(ELAQUM) through the Linkage of Watershed and Freshwater Lake (유역과 담수호를 연계한 담수호 수질관리 시스템 개발 및 적용)

  • 김선주;김성준;김필식
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.44 no.6
    • /
    • pp.124-136
    • /
    • 2002
  • A freshwater lake water quality management system(FLAQUM) was developed to help regional manager for the water quality of a rural basin. The integrated user interface system FLAQUM written in Visual Basic, includes three subsystems such as a database management system, basin pollutant loads simulation model using SWMM model and freshwater lake water quality simulation model using WASP5 model. Pollutant load simulation model was applied to simulate the discharge and pollutant loading from the watershed, and freshwater lake water quality model was applied to analyze the changes in water quality with respect to watershed pollutant loads, and this model could be used in planning to control watershed pollutant source for water quality management. Database management system was constructed fur all input and output data processing, and it can be used to analyze statistical characteristics using constructed data. Results are displayed both graph and text for convenience of user. The results of FLAQUM application to Boryeong freshwater lake showed that the lake was in eutrophic condition. The major contribution of pollution comes from tributary No.1 and No.4, which have a large number of livestock farms. Therefore, water quality management must be focused on appropriate management of the livestock farming in the two breanchs.

Study on the Application of Spatial-analysis of Pollutants and Load Duration Curve for Efficient Implementation of TMDLs system (오염원 공간분석 및 오염부하지속곡선을 통한 맞춤형 수질오염총량제 추진방안 연구)

  • Park, Baekyung;Ryu, Jichul;Na, EunHye;Seo, Jiyeon;Kim, Yongseok
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.39 no.12
    • /
    • pp.655-663
    • /
    • 2017
  • It is difficult to manage hotspot area and to establish the reduction plan considering with spatial-distribution on Korea TMDLs (Total Maximun Daily Loads) system. To solve this problems, methods of Load Duration Curve (LDC) using long-term flow and water quality data, and spatial-analysis were applied on present TMDLs. Jinwi A watershed which is enforced TMDLs plan were selected to study area. Results of application of suggested methods in this study to Jinwi watershed, Hwangguji tributary was selected to hotspot area and Jinwi tributary was exclued. Also, middle area of Hwangguji tributary was needed a reduction plan for the protection of non-point source pollution. In downstream area, livestock manure should be managed additionally. The new methods suggested in this study were useful to increase healthiness for total watershed.

A Study on Determination of an Optimum Riparian Buffer Zone Based on Analytical Hierarchy Process (계층분석법을 이용한 적정 수변구역 결정에 관한 연구)

  • Han, Haejin;Park, Seok-Soon
    • Journal of Korean Society on Water Environment
    • /
    • v.20 no.6
    • /
    • pp.555-562
    • /
    • 2004
  • This paper presents the development and application of a riparian buffer zone design model(RBZDM). The model was developed as a decision-making tool for watershed management, by integrating geographic information system(GIS) and analytical hierarchy process(AHP) theory. Several factors for watershed management, such as pollution removal capacity, land aquisition cost, distribution of point and non-point pollution sources, and possibility of new pollution source location, were analyzed based on AHP theory. The vegetated buffer zone width was designed using GIS-based riparian buffer analysis. The developed model was applied to the Kyoungan Stream watershed, which is an important part of Paldang lake catchment area. The Kyoungan stream watershed was divided into sixteen subbasins. Six of them belong to the main stem, where the model was applied. Ten alternatives of buffer zone width and five hierarchial levels were designed. The relative importance and the relative preference were computed by pair-wise comparison of evaluation criteria given in hierarchial levels. The buffer zone width was determined by linear function of the given alternatives and relative preferences. From this study, it was determined that the six buffer zone widths of Kyoungan main stems would be 1,594, 1,744, 1,856, 1,782, 1,338, 1,780 meter, from upstream to downstream.

The Effects of Hydrologic Characteristics on Sediment Discharge in Streams with Small and Medium Size Watersheds (중소유역의 수문학적 특성이 하천유사량에 미치는 영향)

  • 김활곤;서승덕
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.38 no.3
    • /
    • pp.127-136
    • /
    • 1996
  • The purpose of this study is to provide with information for the water resources development and management in stream management planning, such as information on the sediment trensport, design of dam and water facilities, river improvement and flood plains management. The major results obtained from the field measurement and analysis of the watershed characteristics, hydraulic and sediment characteristics are as follows ; 1. The rating curve formulas obtained from the analysis of the hydraulic characteristics data collected are ; Q-=110.563 $(H-0.474)^2$ for 0.7m$(H-0.146)^2$ for 0.4m$Sr=aX{^2} {_1} X^{c}{_2}$, in the experimental watershed.

  • PDF

Public Perceptions and Support of Environmental Management in the Source Area of Drinking Water for Beijing, China

  • Wang, Xiaoyan;Feng, Qing;Zhang, Yafan;Duan, Shuhuai;Novotny, Vladimir
    • Environmental Engineering Research
    • /
    • v.15 no.1
    • /
    • pp.49-56
    • /
    • 2010
  • Based on a survey of citizens and data analysis on the environmental status of the Miyun Reservoir watershed, China, the environmental awareness of citizens residing in the watershed and the impacting factors are discussed. The contingent valuation method was used to evaluate the willingness of villagers to pay (WTP) for abatement of the rural domestic pollution and to assess the intensity level of the villagers' desire for improving environmental conditions in the Miyun Reservoir watershed. It was found that rural watershed residents had a fundamental cognitive understanding of the pollution status and protection measures of the Miyun Reservoir. However, based on the survey, local residents had only a small interest in their participation to improve the environmental status of the reservoir, despite their general attitude to protect the reservoir being very positive. Gender and family income were closely associated with the overall attitudes of the population. Public media are the most preferable means for conveying knowledge of environmental protection to people living in the watershed. Increasing the educational level, along with income, are the best ways to enhance the desire of the villagers to improve the environmental quality and management.

THE WATERSHED MANAGEMENT AND ASSESSMENT USING GIS BASED ON HYDROLOGICAL AND LANDSCAPE ECOLOGICAL ANALYSIS

  • Lee, Ju-Young;Hopkins, James
    • Water Engineering Research
    • /
    • v.7 no.1
    • /
    • pp.9-20
    • /
    • 2006
  • The watersheds are functional geographical areas that integrate a variety of environmental and ecological processes and human impacts on landscapes. Geographical assessments using GIS recognize the relationship between interdependence of resources and ecological/environmental components in watersheds. They are useful methodology for viable long term natural resource management. This paper performs through the using hydrological analyses, landscape ecological analyses, remote sensing, and GIS. Indicators are items or measures that represent key components of the small watersheds, and they are developed to be evaluated. Some indicators are described that they represent watershed condition and trend as well as focus on physical, biological and chemical properties of small watershed. Also, ecological functions such as stability, resilience, and sensitivity are inferred from them. The model implemented in GIS allows to reflect the ecological and hydrological functioning of watershed. Methodology from image analysis, landscape ecological analysis, spatial interpolation, and numerical process modeling are integrated within GIS to provide assessment for eco-logical/environmental condition. Results are described from the small watershed of Gwynns Falls in Baltimore County and Baltimore City, Maryland, an area of about 66.5 square miles. The small watershed within Gwynns Falls watershed are subject to a number of land-use. But it is predominantly urban, with significantly lesser amounts of forest and agriculture. The increasing urbanization is ass-coiated with ecological/environmental impacts and citizen conflicts.

  • PDF

A Study on the Activation of Non-government Participation in Total Maximum Daily Load System using Private Discharge Facilities Reduction Potential Analysis (개별배출시설 삭감잠재량 분석을 통한 수질오염총량제의 민간참여 활성화 방안 연구)

  • Kim, Hongtae;Shin, Dongseok;Kim, Hyeonjeong;Choi, Inuk;Lee, Miseon;Kim, Yongseok
    • Journal of Korean Society on Water Environment
    • /
    • v.31 no.6
    • /
    • pp.715-722
    • /
    • 2015
  • Four major river basin in Korea has been managed with Total Maximum Daily Load(TMDL) System. Water quality indicators as targeted pollutants for TMDL were BOD and TP. In order to satisfy water quality criteria, government allocation using public treatment facilities and its action plan has been used. However, the role to improve water quality were recently faced to its limitation. It is time to require the role of non-government allocation in private discharge facilities to control good water quality. This study investigated three different scenarios in reduction demands of non-government allocations about industry and private sewages. The three different scenarios were discharge under 1) legal water quality standard, 2) water quality level in 2011 and 3) current water quality level with maximum value in group. The results showed that reduction potential in water discharge for TP indicator was 1,118kg/day, under second scenario with 20% of deduction. This results arrived at 42% of whole reduction potential costs and 0.012mg/L improvement in water quality. In conclusion, to intrigue voluntary participation in non-government allocation, various benefits such as tax reduction, tax exemption, and water quality trading should be provided.