• Title/Summary/Keyword: Verification of equipment

Search Result 512, Processing Time 0.027 seconds

Implementation of a 32-Bit RISC Core for Multimedia Portable Terminals (멀티미디어 휴대 단말기용 32 비트 RISC 코어 구현)

  • 정갑천;기용철;박성모
    • Proceedings of the IEEK Conference
    • /
    • 2000.06b
    • /
    • pp.226-229
    • /
    • 2000
  • In this paper, we describe implementation of 32-Bit RISC Core for portable communication/information equipment, such as cellular telephones and personal digital assistants, notebook, etc. The RISC core implements the ARM$\^$R/V4 instruction set on the basis of low power techniques in architecture level and logic level. It operates with 5-stage pipeline, and has harvard architecture to increase execution speed. The processor is modeled and simulated in RTL level using VHDL. Behavioral Cache and MMU are added to the VHDL model for instruction level verification of the processor. The core is implemented using Mentor P'||'&'||'R tools with IDEC C-631 Cell library of 0.6$\mu\textrm{m}$ CMOS 1-poly 3-metal CMOS technology.

  • PDF

Operating Vibration Reduction Effect Evaluation of EDG at the NPP Site (원자력발전소 비상디젤발전기의 가동중 진동저감 효과)

  • Kim, Min-Kyu;Choun, Young-Sun
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2006.11a
    • /
    • pp.111-118
    • /
    • 2006
  • The Emergency Diesel Generator(EDG) is a very important piece of equipment for the safety of a Nuclear Power Plant(NPP). In this study, the operating vibration or three kinds or EDG system was measured. The target EDG systems art Yonggwang 5 unit, Ulchin 2 unit and Ulchin 3 unit. The Yonggwang 5 and Ulchin 3 unit EDG system is the same type but the foundation systems are different. One is an anchor bolt type and the other is a spring and viscous-damper type. The purpose of this measurement is for a verification of the vibration isolation effect according to the foundation system. As a result. it can he said that the spring and viscous damper system of the EDG performed well for the vibration isolation.

  • PDF

Structural Vibration Analysis of Smart UAV 4-Degree of Freedom Ground Test System (스마트 무인기 4자유도 지상시험치구 구조진동해석)

  • Park, Kang-Kyun;Choi, Hyun-Chul;Kim, Dong-Man;Kim, Dong-Hyun;Ahn, Oh-Sung
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2009.04a
    • /
    • pp.593-598
    • /
    • 2009
  • In this study we present results for the design of ground test system for 4 degree of freedom(DOF) control test is one of the smart UAV ground test. This system is equipped with real smart UAV and Z direction DOF and 3 direction rotation DOF, Ensuring safe operation of the Smart UAV is a top priority. To this end, it is required to do structure analysis and test verification to confirm the design margin and safety. Based on the analysis, the ground test system has been redesigned to meet the structural conditions.

  • PDF

Experiment and verification of the O-ring test (O-링 테스트의 실험적 검토)

  • 최기훈;김영탁;여인철
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2000.11a
    • /
    • pp.64-67
    • /
    • 2000
  • It is usual that the medical examination of human body need special knowledpe and equipments. Thus we have to spend Lime and energy on going to special place such as hospital where doctors and equipments are. Which often cause missing a good chance af medical treatment as well as giving us inconvenience. However many simple and convenient equipments were developed for checking our health conditions recently. O-ring test is accepted a3 one of useful methods to examine our heallb conditions. Also the test is recognized as a uscful means to judge, withoul any special equipment and medical knowledge, if some medical substances or foods are beneficial or harmful to our health. However, the judgement may be mcorrect because it depend on doctor's subjective point of view.In this study, we developed an automatic O-ring t a r mach~ne which enable us to check our health conditions objectively and quantitatively. The validity of the idea to develope the machine was proved by experiments.

  • PDF

Virtual Prototyping of Spent Fuel Disassembling Process Using Graphic Simulator (그래픽 시뮬레이터에 의한 사용후핵연료 집합체 해체공정 가상모형)

  • 이종열;송태길;김성현;김영환;홍동희;윤지섭
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2001.04a
    • /
    • pp.760-763
    • /
    • 2001
  • In this study, the graphical design system is developed and the digital mock-up is implemented for designing the spent fuel handling and disassembling processes. This system is used throughout the design stages from the conceptual design to the motion analysis. By using this system, all the processes involved in the spent fuel handling and disassembling precesses are analyzed and optimized. Also, this system is used in developing the on-line graphic simulator to enhance the reliability and safety of the spent fuel handling process by providing the remote monitoring function of the process. The graphical design system and the digital mock-up system can be effectively used for designing the process equipment, as well as the optimization of the main processes and maintenance processes of the spent fuel management.

  • PDF

Modelling and Test of Down-the-Hole Hammer (다운더홀(DTH) 해머의 모델링 및 실험)

  • Hwang, U.K.
    • Journal of Drive and Control
    • /
    • v.12 no.2
    • /
    • pp.34-38
    • /
    • 2015
  • Research and development of mineral resource related products has progressed with the increased need to develop mineral resources. The DTH hammer is one a resultant product. However, due to particular work conditions of underground drilling, it is difficult to obtain direct data on the DTH Hammer. A DTH drill rig requires a lot of money and time for actual testing. This thesis aimed to resolve this problem by using CAE. First, the structure of the DTH hammer and the movement was analyzed. Next, a standard model based on simulation was proposed and then experimentation and comparison verification was conducted. In addition, the verified models were applied to products of various sizes, and the models used in simulation were compared by conducting field tests.

The Study of Commercial Technique for Korean High Speed Railway Main Power Conversion Equipment (한국형 고속열차 주전력변환장치의 상용화 기술 확보에 관한 연구)

  • Cho, Sung-Joon;Lee, Kwang-Joo;Kim, Tae-Wan;Woo, Myung-Ho;Ko, Young-Cheol;Kim, Du-Sik
    • Proceedings of the KIPE Conference
    • /
    • 2005.07a
    • /
    • pp.363-365
    • /
    • 2005
  • KHSR(Korean High Speed Railway) had achieved the maximum speed of 350 km/h last year. And then, we have concentrated to improve the reliability of the overall system, in particular, motor block of the locomotive. In this paper, simple technique for operating PWM converters under the voltage distortion is introduced. In addition, the electrical braking technique is also made to have the braking capability under the dead zone. Test results revealed the verification of the proposed techniques.

  • PDF

Configuration and Construction for the KASS KRS Site Infrastructure

  • Jang, HyunJin;Jeong, Hwanho;Son, Minhyuk;Lee, ByungSeok
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.10 no.2
    • /
    • pp.139-144
    • /
    • 2021
  • In this paper, we described configuration and construction of infrastructure for the KASS Reference Station (KRS), subsystem of Korea Augmentation Satellite System (KASS). KASS system consists of three subsystems(KRS, Mission Control Center (MCC), KASS Uplink Station (KUS)). One of these subsystems, KRS receives GNSS data for generating range error and integrity verification and sends to MCC. It is needed to antenna facilities for mounting GNSS antenna and shelter for operating KRS and infra equipment(power and network system, lightning and grounding system, fire extinguish) for operating KRS. For this reason, we have established the requirements for KRS infrastructure and constructed infrastructure for KRS to meet the requirements of KRS infrastructure.

The Development of Simulator for Integrated Onboard Signalling System(IOSS) (통합 차상신호장치 테스트용 시뮬레이터 개발)

  • Kim, Seok-Heon;Han, Jae-Mun;Park, Tan-Se;Cho, Yong-Gee
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.363-367
    • /
    • 2011
  • In this paper a simulator for Integrated Onboard Signalling System(IOSS) will be presented and illustrated. IOSS which is integrated with there signalling systems such as ERTMS/ETCS Level 1 ATP(Automatic Train Protection), ATC(Automatic Train Control) and ATS(Automatic Train Stop) is a signalling system for HEMU-400X(Highspeed Electric Multiple Unit - 400km/h eXperiment). HEMU-400X is under development as the next generation high-speed train in Korea. Before conducting a trial run of HEMU-400X with IOSS, we must carry out functional test of IOSS. The simulator is suggested in this paper for testing and verification of IOSS. The simulator can help to test all function of IOSS although a real train and trackside equipments are not existed. Also the simulator can make a fault in trackside equipment intentionally. In that scenario, we can figure out how IOSS handle emergency situations.

  • PDF

Electric power system design and analysis for FLNG vessel

  • Lee, Geunbo;Jang, Jaehyeoung;Lyu, Sungkak;Yu, Jinyeol
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.38 no.5
    • /
    • pp.573-580
    • /
    • 2014
  • The electrical reliability of the power generation and distribution system of Floating Liquefied Natural Gas vessels has been analyzed according to the operating modes using Electrical Transient Analysis Program in this paper. Electricity is used for the topside processes, cargo pumps for off-loading, thrusters for heading control and marine equipment. It is very important to improve the safety, efficiency, and stability of the electrical power system for successful operation. The voltage variation of the high and the low voltage bus shall be within the primitive limitation range at normal operation loads both in steady state and in the transient state. The power system was simulated and compared with class rule for design verification.