In order to improve the safety of nuclear power plant, we performed a human factors review for the CFMS(Critical Function Monitoring system) design of nuclear power plant. Three works were performed in this study. In first work, we developed human factors engineering program plan(HFEPP) and human factors engineering verification and validation plan (HFE-V & V plan) to effectively perform CFMS design and review. In second work, we identified human engineering discrepancies(HEDs) for CFMS design through human factors design review and proposed those resolutions. In the third work, we developed the evaluation and management methodology for identified KEDs. Methodology developed in this study can be used in other complex system as well as in CFMS design review.
Proceedings of the Korea Society for Simulation Conference
/
2003.06a
/
pp.3-8
/
2003
A Simulation S/W is developed to evaluate performances of MLS (Microwave Landing System) and IBLS(Integrated Beacon Landing System) in precision auto-landing. For this study classical PID and optimal LQG controllers are developed as well as mathematical models of MLS and IBLS. Ship-landing condition is also considered by assuming sinusoidal movement of the ship in the pitch direction. The simulated aircraft is F-16 in the study of precision auto-landing. For the integrated simulation environment GUI windows are designed for input of parameter values necessary for simulation, such as vehicle performance and environmental data. For validation and verification of models various comparison graphs of simulation outputs are comprised in the GUI design as well as 3D visual simulation of vehicle dynamics.
Kim, You-Ho;Lee, Soo-Hwan;Park, Kang-Hun;Ko, Tae-Kuk
The Transactions of the Korean Institute of Electrical Engineers P
/
v.63
no.4
/
pp.226-235
/
2014
Nowadays, railroads are considered the most efficient form of mass transportation. Furthermore, it is necessary that railroads be paired with state-of-the-art safety equipment. Unfortunately, it is impossible to prevent 100% of accidents that may be caused by system or human errors. In order to prevent future accidents, RAMS activity and Functional Safety Certification are required for new systems that are under development. In this paper we evaluate the necessity of the application of RAMS and the performance of RAMS in the system development process. We also explore the Safety Evaluation Procedure required for RAMS certification.
In order to reduce the cogging torque, by predicting the variation of the cogging torque according to pole arc/pitch ratio by analytical and FE methods, pole arc/pitch ratio which makes the cogging torque minimum are determined. And then, the measurements of cogging torque for permanent magnet generators with determined pole arc/pitch ratio are presented. The reasons for the error between predicted and measured value are discussed fully in terms of the shape of permanent magnet. Finally, by confirming that predicted results for cogging torque according to pole arc/pitch ratio and skew are shown in good agreement with those obtained from measured one, the validation of analysis results is confirmed.
In design verification and process validation stages, reliability demonstration tests(RDT's) are common practice in industry, A new two-stage RDT that is known to be more efficient than a corresponding single-stage one in terms of expected test duration for Weibull distribution is proposed. Zero or one failure two-stage plans to minimize expected test duration under Type I and hybrid censoring subject to satisfying consumer's risk at a specified reliability target are developed and a numerical example is provided to illustrate the proposed two-stage RDT plans and compared with other one- and two-stage plans.
Proceedings of the Korea Water Resources Association Conference
/
2006.05a
/
pp.918-922
/
2006
The purpose of this study is development of operation model for flood control of multi-reservoir in river basin, which can provide the best decision of reservoir release in timely and appropriately manner using CSUDP. For verification and validation of the developed system, the Gum River Basin was selected, which has 82 rainfall gauging stations, 28 water level gauging and 2 multi-purpose reservoirs which can control flood. There was a successful simulation of the developed model and system, using the real-time data from the Han River Basin Flood Forecast Center. Specially, case study for '1995 flood was performed.
The Transactions of the Korean Institute of Electrical Engineers D
/
v.55
no.5
/
pp.199-204
/
2006
To develop a safety-critical network in nuclear power plants that puts more stringent requirements than the competitive commercial ones do, we establish four design criteria - deterministic communication, explicit separation/isolation structure, reliability, verification & validation. According to those design criteria, the fundamental design elements are chosen as follows - a star topology, point-to-point physical link, connection-oriented link control and fixed allocation access control. After analyzing the design elements, we also build a communication architecture with TDM (Time Division Multiplexing) bus switching scheme. Finally, We develop a DDCNet (Deterministic Data Communication Network) based on the established architecture. The DDCNet is composed of 64 nodes and guarantees the transmission bandwidth of 10Mbps and the delay of 10 msec for each node. It turns out that the DDCNet satisfies the aforementioned design criteria and can be adequately utilized for our purpose.
Korean Journal of Computational Design and Engineering
/
v.10
no.3
/
pp.199-209
/
2005
In this paper, a digital simulation model for an automotive assembly line is constructed by adapting a digital manufacturing methodology. Applied methodology is a simulation for a plant level of the assembly production line. The first significance of this methodology is a validation of the production planning based on various scenarios. The second is pre-verification for the new production plan or production method. The third is a visualization of the production process. Several models were implemented and those models were verified. Then, it was possible to find a most efficient production scenario and production method.
Reliability demonstration tests (RDT's) are widely employed in design verification and process validation stages of industry. New mixed attribute-variable RDT plans that compromise demerits of the corresponding zero and zero or one failure plans which are common in practice are developed for the exponential distribution. The proposed mixed plans are compared with the typical RDT plans in terms of probability of acceptance and expected test termination time. A numerical example is provided to illustrate the mixed plans and a procedure to extend these plans to the Weibull distribution with known shape parameter is also presented.
Journal of the Korea Institute of Military Science and Technology
/
v.13
no.6
/
pp.1080-1090
/
2010
A study for improvement of credibility on test & evaluation result of interoperability in battle management information system which focused in C4I systems is very essential in rapid change of battle field environment. Realization of effective operation process with integration of developed IT also core factor for reducing of operational response time such as information gathering from sensor to shooter, time for commander's decision making. Therefore, by required to meet of high technical T&E, meet of complex software's user requirement, long-term system development period, system integration ability's request by various linkage of systems, it is high a M&S dependency to optimal performance, interpoerability's guarantee. Especially credibility on test & evaluation using M&S is very important. This paper will propse a VV&A applied methods using other VV&A case to improve credibility of M&S on test & evaluation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.