1 |
Sarakakis, G., Gerokostopoulos, A. and Mettas, A.(2011), "Special Topics for Consideration in a Design for Reliability Process," Reliability and Maintainability Symposium (RAMS) Proceedings, pp. 1-6.
|
2 |
Wang, C. J.(1991), "Sample Size Determination of Bogey Tests Without Failures, Quality and Reliability Engineering International, Vol. 7, pp. 35-38.
DOI
|
3 |
Maplesoft(2009), 14, Maplesoft, Canada
|
4 |
Aslam, M.(2007), "Double Acceptance Sampling Based on Truncated Life Tests in Rayleigh Distribution," European Journal of Scientific Research, Vol. 17, pp. 605-610.
|
5 |
Bulgren W. G. and Hewett, J. E.(1973), "Double Sample Tests for Hypotheses about the Mean of an Exponential Distribution," Technometrics, Vol. 15, pp. pp. 187-190.
DOI
ScienceOn
|
6 |
Wang, C. J. and Lu, M. W.(1992), "A Two-Stage Sampling Plan for Bogey Tests, Quality and Reliability Engineering International, Vol. 8, pp. 29-35.
DOI
|
7 |
Fairbanks, K.(1988), "A Two-Stage Life Test for the Exponential Parameter, Technometrics, Vol. 30, pp. 175-180.
DOI
ScienceOn
|
8 |
권영일(2006), "기계류부품 신뢰성보증을 위한 2단계 시험방식 설계", 한국품질경영학회지, 제34권 제1 호, pp. 20-26.
|
9 |
김형의(2006), "한국적 신뢰성 인증체계 개념", 신뢰성응용연구, 제6권 1호, pp. 63-91.
|
10 |
Abernethy R. B.(2004), The New Weibull Handbook, 5th ed., Published by R. B. Abernethy, 536 Oyster Road, North Palm Beach, FL33408-4328, USA.
|