• Title/Summary/Keyword: Variable Cost

Search Result 1,156, Processing Time 0.032 seconds

Limited Cost-Based Competition and the Cost Distortion Factor - How Real Variable Costs are Reported in Cost-Base Pool of Korean Power Market - (원가기반 제한경쟁과 비용왜곡 요인 -변동비 반영 전력시장에서의 실제변동비 반영사례를 중심으로-)

  • Kim, Myung-Seok;Cho, Sung Bong
    • Environmental and Resource Economics Review
    • /
    • v.23 no.3
    • /
    • pp.497-513
    • /
    • 2014
  • Rate-of-return regulation where a regulator compensates the utilities based upon the cost incurred the regulated companies have the incentive to over-report cost level. However, in case of cost-based competition where a regulator knows the cost of each plant involved and induce the competition among them, one can encounter prisoner's dilemma situation in the short run where the regulated firms under-report cost level. For instance, in case of cost-based pool, a generator may have a strategic behavior to keep its registered variable cost higher than the actual level to maintain its operation rate and generation amounts higher. Eventually, however, such behavior decrease the profitability of a generator and discourage new entry jeopardizing required level of capacity reserves. This is a typical Prisoner's Dilemma situation. The power market operating rule should be revised so that generators' registered variable cost reflect actual level of variable cost.

Cost Behavior of Private University Hospital in Korea (사립대학병원의 원가행태)

  • Choi, Hwang-Gyu;Hwang, In-Kyoung
    • Korea Journal of Hospital Management
    • /
    • v.11 no.3
    • /
    • pp.73-93
    • /
    • 2006
  • This study aims at providing necessary informations for management decision-making to the hospital manager, such as ratios of fixed and variable cost to total operating expense, and variable cost ratio to operating revenues, and determinant factors affecting cost behavior. A study model and related hypotheses were established, data were collected from 41 private university hospitals for the 6years from 1998 to 2003, and regression analyses were performed to test the hypotheses. The results of the analyses and conclusions are as follows; First, labor cost and administration cost within the same number of beds have not only fixed quality of the cost, but variable quality of that. Also, the ratio of the variable costs to operating revenue of the metropolitan was estimated 76.9% and that of other area hospitals was 80.1%. Second, the major factors affecting the increase rate of the operating expense were the increase rates of the number of inpatients, the number of employee, and the number of hospital operating bed. This result implies that maintaining a optimal hospital bed size and efficient operation of the beds are important strategic factors of hospital management.

  • PDF

Economic Component Screening Procedures for Multi-Component Products Supplied with Warranty (조립제품을 구성하는 부품에 대한 전수검사 방식의 경제적 설계)

  • Chang, Young-Soon;Bai, Do-Sun
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.27 no.4
    • /
    • pp.366-373
    • /
    • 2001
  • Economic component screening procedures for multi-component assembly products supplied with warranty are proposed. It is assumed that the screening variable is continuous and the performance variable is dichotomous. Logistic and normal models are considered; the proportion of conforming items is a logistic function of the screening variable in the logistic model and the screening variable given the performance variable is normally distributed in the normal model. Cost models are constructed which involve three cost components; screening inspection cost for each component, cost due to disposing a rejected component, and warranty cost for an assembly product. Methods of finding the optimal screening procedures are presented and numerical examples are given.

  • PDF

An Economic Two-Sided Screening Procedure Using a Correlated Variable with Multi-Decision Alternatives (다 결정 대안을 갖는 대용특성을 이용한 경제적 양측 선별검사방식)

  • Hong, Sung-Hoon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.21 no.3
    • /
    • pp.387-396
    • /
    • 1995
  • For situations where there are several markets with different profit/cost structures, an economic two-sided screening procedure using a correlated variable is developed. It is assumed that the performance variable and the screening variable are jointly normally distributed. A profit model is constructed which involves selling price, cost incurred by imperfect quality, and screening inspection cost. Methods of finding the optimal screening procedure are presented and numerical examples are given.

  • PDF

Economic Design of Screening Procedures under the Constraint on the Proportion of Conforming Items after Screening (선별후 양품의 비율에 대한 제약조건을 갖는 선별검사방식의 경제적 설계)

  • Hong, Sung-Hoon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.19 no.3
    • /
    • pp.25-35
    • /
    • 1993
  • Economic screening procedures using a correlated variable are proposed to assure that the proportion of conforming items is above a desired level after screening. It is assumed that the performance variable and the screening variable are jointly normally distributed. Two screening procedures are considered. In the first screening procedure, all of the items are inspected on the screening variable. If an item fails to meet the screening specifications, it is rejected and excluded from shipment without inspection of the performance variable. In the second screening procedure, the item which fails to meet the screening specifications is inspected on the performance variable. If the value of the performance variable is within specifications the item is accepted, and the item is rejected otherwise. Cost models are constructed which involve cast from an accepted nonconforming item, cost from a rejected item, and quality inspection cost. Methods of finding optimal cutoff value on a screening variable are presented and numerical examples are given.

  • PDF

Economic Design of Variable Sampling Interval X Control Chart Using a Surrogate Variable (대용변수를 이용한 가변형 부분군 채취 간격 X 관리도의 경제적 설계)

  • Lee, Tae-Hoon;Lee, Jooho;Lee, Minkoo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.39 no.5
    • /
    • pp.422-428
    • /
    • 2013
  • In many cases, an $\bar{X}$ control chart which is based on the performance variable is used in industrial fields. However, if the performance variable is too costly or impossible to measure and a less expensive surrogate variable is available, the process may be more efficiently controlled using surrogate variables. In this paper, we propose a model for the economic design of a VSI (Variable Sampling Interval) $\bar{X}$ control chart using a surrogate variable that is linearly correlated with the performance variable. The total average profit model is constructed, which involves the profit per cycle time, the cost of sampling and testing, the cost of detecting and eliminating an assignable cause, and the cost associated with production during out-of-control state. The VSI $\bar{X}$ control charts using surrogate variables are expected to be superior to the Shewhart FSI (Fixed Sampling Interval) $\bar{X}$ control charts using surrogate variables with respect to the expected profit per unit cycle time from economic viewpoint.

Design of the Variable Sampling Rates X-chart with Average Time to Signal Adjusted by the Sampling Cost

  • Park, Chang-Soon;Song, Moon-Sup
    • Journal of the Korean Statistical Society
    • /
    • v.26 no.2
    • /
    • pp.181-198
    • /
    • 1997
  • The variable sampling rates scheme is proposed by taking random sample size and sampling interval during the process. The performance of the scheme is measured in terms of the average time to signal adjusted by teh sampling cost when the process is out of control. This measurement evaluates the effectiveness of the scheme in terms of the cost incurred due to nonconformation as well as sampling. The variable sampling rates scheme is shown to be effective especially for small and moderate shifts of the mean when compared to the standard scheme.

  • PDF

A Study on Environmental and Economic Cost Analysis of Coal Thermal Power Plant Comparing to LNG Combined Power Plant (석탄화력발전대비 LNG복합화력발전 환경성 및 경제성 비용분석에 관한 연구)

  • Kim, Jong-Won
    • Asia-Pacific Journal of Business
    • /
    • v.9 no.4
    • /
    • pp.67-84
    • /
    • 2018
  • This study is about comparing coal thermal plant to LNG combined power plant in respect of environmental and economic cost analysis. In addition sensitive analysis of power cost and discount rate is conducted to compare the result of change in endogenous and exogenous variable. For environmental assessment, when they generate 10,669GWh yearly, coal thermal power plant emits sulfur oxides 959ton, nitrogen oxide 690ton, particulate matter 168ton and LNG combined power plant emits only nitrogen oxide 886ton respectively every year. Regarding economic cost analysis on both power plants during persisting period 30 years, coal thermal power plant is more cost effective 4,751 billion won than LNG combined taking in account the initial, operational, energy and environmental cost at 10,669GWh yearly in spite of only LNG combined power plant's energy cost higher than coal thermal. In case of sensitive analysis of power cost and discount rate, as 1% rise or drop in power cost, the total cost of coal thermal power plant increases or decreases 81 billion won and LNG combined 157 billion won up or down respectively. When discount rate 1% higher, the cost of coal thermal and LNG combined power plant decrease 498 billion won and 539 billion won for each. When discount rate 1% lower, the cost of both power plant increase 539 billion won and 837 billion won. With comparing each result of change in power cost and discount rate, as discount rate is weigher than power cost, which means most influential variable of power plan is discount rate one of exogenous variables not endogenous.

Economic Complete Inspection Plans for Grading Product Quality (품질 등급화를 위한 경제적 전수검사방식)

  • Hong, Sung-Hoon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.22 no.3
    • /
    • pp.473-483
    • /
    • 1996
  • For situations where there are several markets with different price/cost structures, economic complete inspection plans are developed for determining the market to ship the product to. Two complete inspection plans are considered; the plan based on the performance variable of interest, and the plan based on a variable which is correlated with the performance variable. Profit models are constructed which involve selling price, cost incurred by imperfect quality, and quality inspection cost. Methods of finding the optimal complete inspection plans are presented and a numerical example is given.

  • PDF

The Analysis of Life Cycle Cost and Cooling Water Circulating Pump Energy Saving According to Variable Speed Pressure Differential Setpoint Control Strategy

  • Kim, Seo-Hoon;Kim, Jong-Hun;Jang, Cheol-Yong;Song, Kyoo-dong
    • KIEAE Journal
    • /
    • v.15 no.4
    • /
    • pp.37-43
    • /
    • 2015
  • Purpose : The study applied control strategy to reduce through optimal control and operation of pump by applying control on variable speed to the circulation pump of HVAC system in the office building. The study has the purpose to review validity of control on variable speed as ESMs(Energy Saving Measures) and establish the control technology on variable speed pump. The study performed reduction analysis of building energy and economic evaluation of pump through energy effectiveness control strategy of HVAC system. Method: The study sought possible reduction through energy control strategy which can provide proper flow fitting to building load by applying control on variable speed pump. The study applied control strategy to reduce through pressure differential set-point control and operation of pump by applying control on variable speed to the circulation pump of HVAC system in the office building. Result : The results showed that about 16-35% of pump energy could be saved by using these optimal control strategies. In the result of analysis on 10 years life cycle cost of analysis on payback period of initial investment pump, variable speed pump control showed 5.1 years.