Improvement Plan based on Awareness Investigation of Construction VE System in Domestic Construction (국내 건설공사 시공 VE 제도 인식조사에 기반한 개선방안)

  • Park, Jin-Young;Seo, Ho-Hyong;Kim, Byung-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.79-88
    • /
    • 2018
  • Construction business VE is classified into design stage VE and construction stage VE. The faster the application, the better the effect. Therefore, the design stage VE was legislated in 2000 and actively applied. However, it is urgent to activate the construction VE, which is complementary to the design VE system. In the meantime, we have made a lot of efforts to activate construction VE by suggesting the necessity of construction VE system, improvement of technology development compensation system, concrete implementation method of construction VE, but it was not effective due to lack of related laws. This study compares and analyzes construction VE system in Korea and abroad for the activation of construction VE after recognizing such domestic reality. A survey of experts in each field of the construction industry was conducted and suggestions for improvement of construction VE system suitable for domestic construction industry were suggested.

A VE Incentive System for Construction Industry (건설VE 인센티브 제안)

  • Song, Yong-Chul;Song, Nak-Hyun;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1019-1022
    • /
    • 2007
  • Recent construction projects are becoming larger, more complex and higher rising. Accordingly, necessity of the VE is emphasized as more suitable for expense, function and quality. However, the VE is not functional because of difficulty of application process or of the methods in use in the field of construction. One of the alternative is to introduce the incentive system to activate the VE in the field of construction. By using the incentive system, employers can reduce the relevant project's prime cost and builders will maximize profit creation. In domestic case, they presented the systematic support policy 'Technical development compensation system' which is similar to the 1992 American's VE incentive system about builder's technical development effort but the result was not positive. This study investigates both domestic and other country's construction VE incentive system and reported problems in the construction VE incentive system to executives and construction VE experts. From this survey, conclusions were drawn about problems in the domestic construction VE incentive system's similarity system: 'Insufficiency of the construction VE incentive's article and standards', 'Insufficiency of the appraiser of the construction VE and of the full charge department' etc. I had interviews with the experts of the construction VE which were based on the above-mentioned problems and then presented 'Improvement of the construction VE's incentive system relevant law and system', 'Construction VE experts and construction formation' etc. for ways to bring acceptance of the construction VE in the construction industry.

  • PDF

Development of Mobile-Based Design Value Engineering(VE) Supporting System for VE Process Improvement (VE프로세스 개선을 위한 모바일 기반의 설계VE 시스템 개발)

  • Song, Chang-Young;Yang, Byong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.5
    • /
    • pp.433-443
    • /
    • 2021
  • Value Engineering(VE) is an organized effort to create the most value through a functional analysis and creation of alternatives. Depending on the VE job plan, a VE Workshop must be performed in a certain place within a certain period of time. A VE Workshop, which is an organized activity that aims to create the best value through functional analysis and creation of alternatives, should be held in a certain place and at a scheduled time according to the VE job plan. In the Pre-Study, VE Study and Post-Study phases of VE, functional assessments, performance evaluations and idea evaluations are driven by variable management techniques and analysis methods, respectively. Generally, VE is executed for about 3 to 5 days in a particular place to create value. However, there are many problems associated with limiting all VE processes to a specific place and schedule. Moreover, in Korea, VE teams are required to finish all VE processes in a limited time because of the short duration of VE workshops, the necessity of which has been overlooked. Therefore, an efficient VE support system is required to resolve the problem of time and space limitations. In this study, a VE support system based on the Mobile environment was developed to support the VE Workshop process. This VE support system enables participants to review design documents, drawing sheets and all VE-related documents using mobile devices. After the Workshop, participants can conveniently rearrange the result(evaluation of function and ideas) at the workshop. Not only can the members of VE team can review the design documents, drawing sheet and all VE-related documents in the step before the workshop, but also the result(evaluation of function and ideas) of the workshop can be easily rearranged in the phase after the workshop under the developed supporting system using mobile devices.

Development of Web-Based VE Supporting System for Effective Workshop (효율적인 VE워크숍을 위한 웹기반 VE지원시스템 개발에 대한 기초연구)

  • Lim, Jongkwon;Kim, Sunghun;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.71-78
    • /
    • 2014
  • Value Engineering methodology was introduced about 30years ago and has significant achievement in Korea. However, many of workshop still focus on cost down process and do not spend enough time on function analysis and expert cooperation. As a result, limited range of creative ideas were produced. To improve effectiveness of VE workshop, this study developed web-based value engineering process and system. And this study applied it to real case study to evaluate effectiveness of proposed system. Developed VE system also provides automated FAST diagram function and decision-making supporting tools. The authors found that this developed web-based VE system can significantly help to save cost and improve performance of VE workshop by using the appropriate VE process, and quick cooperation between experts. In addition, this study shows an example of a VE case study that applies the web-based VE system process, which led to a very innovative and effective way to lead workshop.

The Conceptual Model of Web-Based Information System for Value Engineering(WISE) in Construction Projects (건설사업 웹 기반 VE 정보시스템의 개념 모델)

  • Lee Jae-ho;Park Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.167-177
    • /
    • 2005
  • Value Engineering(VE) Workshop executes many tasks with VE team members from various experts of construction field on the basis of VE Job Plan for a short period of time. However, the VE team members are not useful with using VE information until now because it is not systematic in the accumulation and application of VE information. Especially, these problems constitute the obstacles to communication, reliability and quickness of VE information. It also causes an increase of time and cost at VE Workshop. Therefore, the results of this study suggests the conceptual model of Web-Based Information System for VE(WISE) in order to improve the effectiveness of VE Workshop and solve the problem as is stated above.

Problem Analysis and Improvement Scheme Based on Questionnaire Survey to Design VE Status for Apartment Buildings (공동주택 설계VE 현황 설문조사를 통한 문제점 분석 및 개선방안)

  • Kim, Young-Hoon;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.4
    • /
    • pp.51-58
    • /
    • 2010
  • The purpose of this study is to analyze problems and suggest improvement scheme based on questionnaire survey to design VE status for apartment buildings. For this study, the adapted research methods are case studies of design VE to construction companies and questionnaire survay to design staffs. The results of this study are as follows: 1) In the system aspect, the problems of design VE for apartment buildings are insufficiency of regulation and difficulty of performing design VE actively. In the performance aspect, the problems is absence of design VE procedure suited to apartment buildings. 2) In the system side, the improvements of design VE for apartment buildings include regulatory enlargement of design VE application for apartment buildings and rearrangement of VE incentive system for design staffs. In the performance side, a VE procedure suited to apartment buildings is developed and suggested.

A Study on the Improvement of the Design VE Process using VE Idea-DataBank System (설계 VE 프로세스 개선을 위한 VE Idea-DataBank System 구축에 관한 연구 - 한국도로공사 고속도로 건축공사를 대상으로 -)

  • Park, Heetaek;Park, Chansik;Jung, Wooseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.28-38
    • /
    • 2014
  • Construction value engineering(VE) is often performed in the form of a short term review of designs, rather than during a regular workshop with a standardized work plan, and its application method is limited. Thus, tasks are performed by applying the method in reverse depending on the VE results, and function analysis, a key VE method, is omitted or only applied for the sake of formality. In addition, it is hard to expect great results from VE because of insufficient time and budget allowed to perform VE and a lack of understanding of VE procedures and methods. In particular, the methods used to store and reuse the tremendous amount of ideas and information created during the process of VE implementation is not systematic. Even the Korea Expressway Corporation, which has produced relatively systematic VE performance compared to other institutions, has had the above-mentioned problems. Therefore, this study aims to improve existing VE processes and suggest a method to efficiently store and retrieve VE information by analyzing the limitations of construction VE practice and the characteristics of VE for highway facilities as part of improving design VE performance.

A Preliminary Study of Prototype for Improving VE Workshop Phase based on BIM (BIM 기반 VE 워크샵 단계의 업무 향상을 위한 프로토타입 개발에 관한 기초연구)

  • Kim, Hojun;Park, Heetaek;Park, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.113-122
    • /
    • 2015
  • VE workshop is performed based on VE expert' experiences without retrieving VE data of similar previous projects. Moreover, it usually omitted or applied for the sake of formality due to insufficiently understanding VE function, limited time, space and budget. Even though many studies have established VE databases for retrieving and reusing VE data, VE workshop is still inefficient and ineffective to improve projects' values. With this regard, this study proposes a preliminary prototype for improving VE workshop, which utilizes the state-of-the-art information communication technologies(ICTs) including Building Information Modeling(BIM), Mobile Computing(MC), Network Service System(NSS), and Database Management System(DBMS) for better managing, storing and reusing VE data. The prototype was developed to evaluate advantages and limitations. The results show that the proposed prototype can support visual VE data retrieval from similar previous projects, enhance communication among VE team and save much time and cost comparing to traditional VE. Through this, the productivity of VE workshop can improve efficiently and effectively.

An Implementation Analysis of Design VE to Turn-key and Alternative Project (턴키 및 대안입찰사업의 설계VE 성과분석)

  • Kim, Ki-Han;Lee, Hyun-Suk;Lim, Hee-Dong;Kim, Byung-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1011-1014
    • /
    • 2007
  • Design VE system in order to promote the economical efficiency and the functional elevation of construction facilities apply to conatruction over 10 billion from december 2005. But it don't achieve purpose of VE original to maximization of value creation through VE because VE perform formal and result center. This study suggests some idea and analyse implementation of design VE through design VE case of turnkey and alternative project performed in domestic.

  • PDF

The Efficiency Scheme of Design VE through the Case Studies of Construction VE for Apartments (공동주택 시공VE 사례분석을 통한 설계VE 효율화방안)

  • Kim, Yong-Su;Kim, Young-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.4
    • /
    • pp.59-67
    • /
    • 2010
  • The purpose of this study is to efficiency scheme to design VE through the case studies of construction VE forapartments. The adapted research method includes five case studies of construction VE and analysis of constructionVE practice. The results of this study are as follows 1) For efficiency of design VE, data management system whichis necessary for construction VE database establishment and its application were proposed. 2) Through workingsystem improvement of construction VE, an improvement to design VE performance process was proposed. 3)Consideration factors and main VE items for efficient design VE item selection of apartment buildings wereproposed.