References
- Charles, Y. J., and Seng, K. T. (2005). "Appraisal of value engineering in construction in Southeast Asia." International Journal of Project Management, 23(2), pp. 151-158. https://doi.org/10.1016/j.ijproman.2004.07.008
- Choi, S., and Park, C. (2002). "Easy FAST: An Effective Computerized FAST Diagramming Model for Construction VE Projects" Architectural Institute of Korea, 18(4), pp. 155-163.
- Chuck, E., Paul, T., Rafae,l S., and Kathleen, L. (2009). "A Guide to building Information Modeling for Owners, Managers, Designers, engineers, and Contractors." SPACETIME.
- Heo, I., Lee, Y., Jeong, B., and Yang, J. (2011). "A Hi-Value Process Establishment for Efficient Implement of Design Value Engineering in Highway." Construction Engineering and Management, KICEM, 12(6), pp. 36-48.
- John, K., Steven, M., and Drummond, G. (2004). "Value Management of Construction Projects." MACMILAN.
- Kim, H., Park, H., and Park, C. (2014). "Development of Mobile Application Prototype for Efficient Value Engineering." Proceedings of KICEM Annual Conference, 14, pp. 85-86.
- Kim, S. (2013). "Efficient method for Job Plan process based on decision-making VE System." Construction Engineering and Management, KICEM, 14(4), pp. 17-22.
- Lee, I., Hyun, C., Son, M., Kim, D., and Kim, Y. (2011) . "Development of Function Breakdown Structure of Building Element based on Performance for Idea Connection in Design VE." Korea Journal of Construction Engineering and Management, KICEM, 12(5), pp. 12-22. https://doi.org/10.6106/KJCEM.2011.12.5.12
- Lee, J., and Park, C. (2005). "The Conceptual Model of Web-Based Information System for Value Engineering(WISE) in Construction Projects." Korea Journal of Construction Engineering and Management, KICEM, 6(3), pp. 167-177.
- Lee, S., Hyun, C., and Hong, T. (2009). "RETRIEVE: REmembering Tool for Reusing the Ideas Evolved in Value Engineering." Automation in Construction, 18(8), pp. 1123-1134. https://doi.org/10.1016/j.autcon.2009.07.004
- Lim, J., Kim, S., and Lee, M. (2014). "Development of Web-Based VE Supporting System for Effective Workshop." Korea Journal of Construction Engineering and Management, KICEM, 15(2), pp. 71-78. https://doi.org/10.6106/KJCEM.2014.15.2.071
- Park, H., Park, C., and Jung, W. (2014). "A Study on the Improvement of the Design VE Process using VE Idea-DataBank System." Korea Journal of Construction Engineering and Management, KICEM, 15(1), pp. 28-38. https://doi.org/10.6106/KJCEM.2014.15.1.028
- Park, H., and Park, C. (2012). "A Conceptual Model of VE Idea-DataBank System." Proceedings of KICEM Annual Conference, 12, pp. 347-348.
- Sadi, A., Osama, A. J., and Ahmed, A. (2000). "Computerized system for application of value engineering methodology." Journal of Computing in Civil Engineering, 14(3), pp. 206-214. https://doi.org/10.1061/(ASCE)0887-3801(2000)14:3(206)
- Seo, Y., Woo, Y., and Lee, S. (2010). "A Study on Development the Actual cases Database of Value Engineering on Building Construction." The Korea Institute of Building Construction, 10(2), pp. 67-73.
- Shichao, F., Qiping, S., and Gongbo, L. (2007). "Comparative study of idea generation between traditional value management workshops and GDSS-Supported workshops." Journal of Construction Engineering and Management, S133(10), pp. 816-825.
- Xiaoming, M., Xueqing, Z., and Simaan, M. A. (2009). "Enhancing value engineering process by incorporating inventive problem solving techniques." Journal of Construction Engineering and Management, 135(5), pp. 416-424. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000001
- Xueqing, Z., Xiaoming, M., and Simaan, M. A. (2009). "Developing a knowledge management system for improved value engineering practices in the construction industry." Automation in Construction, 18(6), pp. 777-789. https://doi.org/10.1016/j.autcon.2009.03.004
- Yalda, R., and Osama, M. (2014). "4D-Based Value Engineering." Construction Research Congress, pp. 1606-1615.
- Yang, B. (2011). "Cost saving for construction based on improvement of various design VE process : case study of Busan." Construction Engineering and Management, KICEM, 12(2), pp. 68-70.