Consecutive Design VE Process Emphasized on Follow-up Activities (Follow-up 활동을 강조한 연속적 설계VE 프로세스)

  • Yang, Jin Kook;Moon, Sung Woo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.2D
    • /
    • pp.235-244
    • /
    • 2009
  • Design Value Engineering (VE) has become an import part of the daily design process since it has been introduced in the construction industry. Design VE is usually conducted in the general and execution design stages respectively. In order to increase the effectiveness of the VE process, the outcome from the general design VE activities should be integrated into execution design. The outcome from the execution design should be used again for construction. In this study, a consecutive VE process model has been presented as a way to improve the current practice of design VE activities in the construction industry. In the presented model, follow-up activities are emphasized to increase values from the life-cycle perspective of a construction project. The model was tested in a case study of an actual design VE process. The result of the study demonstrates that the model can: 1) effectively incorporate owners requirements; 2) assist decision making in selecting better construction; 3) increase the interface between general and execution design stages; and 4) trace the value flow more efficiently. Overall, the study results indicates that a the consecutive VE process model can be effectively applied when construction project are contracted for the life-cycle management of construction projects.

The Case of the Accomplishment on the Architectural Value Engineering Competition;Focused on ' The New Construct Field Value Engineering of Apartment, A-14, Woonjeongjigu, Paju' (건설 VE 경진대회 수행사례;파주운정지구 A-14 블럭 아파트 건설공사를 중심으로)

  • Jeon, Chung-Keun;Min, Won-Jae;Ryu, Ik-Seon;Han, Min-Chul;Han, Cheon-Goo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1029-1032
    • /
    • 2007
  • This study enforced function analysis, achievements of ideas and valuations due to VE workshop about " the new construct field of apartment, A-14, Woonjeongjigu, Paju" as the project of a plan VE competition held by the Korea National Housing Corporation, For the results of the research, it was to enforce 163 works of function analysis, 333 items of creating ideas, and 193 achievements of ideas. Besides, VE was proposed about 46 works of increasing values and cost reduction for 103 works and 10,040,000,000 won.

  • PDF

A Systematization Model of the Design Phase VE Selection by the Analysis of the Required Items in the Apartment (공동주택 설계VE의 요구항목 분석을 통한 대상선정 체계화 모델)

  • Jung, Ho-Geun;Yang, Jin-Kook;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1015-1018
    • /
    • 2007
  • VE is one of the most effective and systematic tool available to achieve the required function at minimum cost and manage in many industrial fields. The purpose of the preparation phase VE job plan is to establish a cooperation system referring to groups for the successful implementation of VE, and to achieve a common objective to collect sufficient materials required in the analysis phase. The Quality Model is used to measure the requirement of shareholders(users and owners)in the project. It also offers a guideline on decision making when executing the function definition, function arrangement, function evaluation, and the idea evaluation of VE. However, the current the preparation phase business confirms that the required items of owners and users has not suggested definite goals and directions. This study analyzes the problems of current work in the preparation phase from case study, survey and interviews of experts. It then proposes a new process after understanding the required items of owners, users and experts.

  • PDF

Improved Method for VE Items Selection by Analysing the Required Items of Stakeholder on the Apartment in Design Phase (공동주택의 설계VE단계에서 주체별 요구항목 분석을 통한 대상선정 개선방안)

  • Jeong, Ho-Geun;Yang, Jin-Kook;Lee, Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.111-119
    • /
    • 2008
  • VE is one of the most effective and systematic tool available to achieve the required function at minimum cost and manage in many industrial fields. The purpose of the preparation phase VE job plan is to establish a cooperation system referring to groups for the successful implementation of VE, and to achieve a common objective to collect sufficient materials required in the analysis phase. The Quality Model is used to measure the requirement of shareholders(users and owners)in the project. It also offers a guideline on decision making when executing the function definition, function arrangement, function evaluation, and the idea evaluation of VE. However, the current the preparation phase business confirms that the required items of owners and users has not suggested definite goals and directions. This study analyzes the problems of current work in the preparation phase from case study, survey and interviews of experts. It then proposes a new process after understanding the required items of owners, users and experts.

Value Engineering Idea Generation for Temporary Construction Designs through Conflict Resolution (가시설 공사 설계VE 대안검토시 모순충돌 해결을 통한 아이디어 창출)

  • Hong, Soonheon;Baeg, Hangee;Moon, Sungwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.30-37
    • /
    • 2013
  • Idea creation is the most important step in the overall value engineering (VE) process. Usually the activity is done mostly relying on the experience and knowledge of the experts in the VE team. A more organized approach is needed to find the chance of design improvement during a VE workshop. This study presents an organized approach to increasing the chance of idea creation during the VE workshop. The concept of conflict resolution in TRIZ (Theory of Inventive Problem Solving) is applied to understand the problem area during design improvement. The technical parameters were identified in the problem area to explain the conflicts in design improvement. These technical parameters were used to assist problem solving and improve design functions. A case study was done on a temporary construction operation, and demonstrated that the organized idea creation can help improve the design value of the temporary construction operation.

A Case Study on the VE/LCC for selection on Improvement of Soft Soil Ground (연약지반처리공법 선정을 위한 VE/LCC 사례 분석)

  • Kim, Yong-Deuk;Lee, Young-Dae;Acharya, Nirmal Kumar
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.271-273
    • /
    • 2006
  • Because effect of value elevation is great as it is fast that construction VE is enforcement, VE at the design phase is more and more important more than construction process phase. But, is exerting negative impact for construction process phase by various problem that happen at design phase, and is causing discord to between project partners. Therefore, quality security in design phase is important first of all. Hereupon, this study emphasized that need VE at the design phase of extension plan forward more and more because achieved process that derive conceptional estimation by quantitative value calculating value index (V) through provision of design function point (F) and LCC expense (C) by comparison method of construction and chooses optimum method of construction through VE/LCC analysis example in improvement of soft soil ground method choice process of design phase.

  • PDF

A Study on the Optimum Selection of Railload Line using VE-LCC Analysis - Based on the Optimum Selection of Railway Bridge - (VE-LCC 분석을 통한 철도 노선의 최적안 선정방안 연구 - 교량 선정방안을 중심으로 -)

  • Shin Tae-Kyun;Lee Seung-Hoon;Kwon Jae-Seong;Koo Jeong-San;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.488-493
    • /
    • 2005
  • Railload line design of the railroad construction project should be planed considering the variety of quantitative and qualitative factors, and needs to be selected the optimum altinative weighing from VE/LCC analysis of the planned design. The purpose of this research is for showing selecting plan of the optimum railload line and railway bridge applying VE/LCC analysis in selecting the optimum altinative of railroad construction based on quantitative and qualitative factors, such as initial construction cost, maintenance cost, owner and user's requirements. In this research showed the application plan by each stage using data analysis, function analysis, and alternative evaluation of VE/LCC analysis with AHP and LCC analysis program for the selection. This research is proved the rationality and application of the course of selecting the optimum alternative through case application

  • PDF

Case Study on the Improvement of Underground Building Works through the VE (VE 적용에 의한 지하 골조공사 개선연구)

  • Hong Jae-Wook;Kim Sun-Kuk;Lee Jong-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.106-113
    • /
    • 2004
  • Most construction project managers should focus on the reasonable cost-down with same quality and function-enhancement with same cost for the value-added construction project delivery in construction industry. Especially, a building structure construction is one of the most important processes to affect the total cost and schedule in building construction project. It means that the process has the possibility of project cost-down or quality-enhancement among the whole project life-cycle. This research focuses on the importance of underground structure of building project by increasing underground use ratio in the urban building construction projects nowadays. This research adopts VE method for the improvement of cost and time by process and analysis dimension modeling on the underground building structure construction, and verifies it throughout the case study, This research is the basic study on the improvement of underground building works through the value engineering method in construction industry.

An innovative BRB with viscoelastic layers: performance evaluation and numerical simulation

  • Zhou, Ying;Gong, Shunming;Hu, Qing;Wu, Rili
    • Structural Monitoring and Maintenance
    • /
    • v.5 no.2
    • /
    • pp.205-229
    • /
    • 2018
  • Energy induced by minor earthquake and micro vibration cannot be dissipated by traditional buckling-restrained braces (BRBs). To solve this problem, a new type of hybrid passive control device, named as VE-BRB, which is configured by a BRB with high-damping viscoelastic (VE) layers, is developed and studied. Theoretical analysis, performance tests, numerical simulation and case analysis are conducted to study the seismic behavior of VE-BRBs. The results indicate that the combination of hysteretic and damping devices lead to a multi-phased nature and good performance. VE-BRB's working state can be divided into three phases: before yielding of the steel core, VE layers provide sufficient damping ratio to mitigate minor vibrations; after yielding of the steel core, the steel's hysteretic deformations provide supplemental dissipative capacity for structures; after rupture of the steel core, VE layers are still able to work normally and provide multiple security assurance for structures. The simulation results agreed well with the experimental results, validating the finite element analysis method, constitutive models and the identified parameters. The comparison of the time history analysis on a 6-story frame with VE-BRBs and BRBs verified the advantages of VE-BRB for seismic protection of structures compared with traditional BRB. In general, VE-BRB had the potential to provide better control effect on structural displacement and shear in all stages than BRB as expected.

A Case Study of Construction Management for Pusan National University Children's Hospital (부산대학교 어린이병원 건립사업 CM 수행사례)

  • Yang, Jin-Kook;Ri, Min-Hyeon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.13-18
    • /
    • 2007
  • The construction by the ministry of health and welfare support of the first special hospital for only children in busan and gyeong-nam is under building with YPNUH(Yangsan Pusan National University Hospital) for the best medical treatment town and is to improve the productivity and efficiency by eliminating unproductive and inefficient fact through the construction management, systemic and scientific management technique. So in this study we would like to suggest the generated effect to apply project management technique to all stage such as from pre-design phase, turn-key enterprise choice, construction, design VE(Value Engineering), PMIS (Project Management Information System) construction to maintenance phase and cost and schedule reduction effect through basic, execution design VE by using engineer of field.

  • PDF