Value Engineering Idea Generation for Temporary Construction Designs through Conflict Resolution

가시설 공사 설계VE 대안검토시 모순충돌 해결을 통한 아이디어 창출

  • Hong, Soonheon (Department of Civil and Environmental Engineering, Pusan National University) ;
  • Baeg, Hangee (Department of Civil and Environmental Engineering, Pusan National University) ;
  • Moon, Sungwoo (Department of Civil and Environmental Engineering, Pusan National University)
  • 홍순헌 (부산대학교 사회환경시스템공학부) ;
  • 백한기 (부산대학교 사회환경시스템공학부) ;
  • 문성우 (부산대학교 사회환경시스템공학부)
  • Received : 2013.03.05
  • Accepted : 2013.09.02
  • Published : 2013.11.30

Abstract

Idea creation is the most important step in the overall value engineering (VE) process. Usually the activity is done mostly relying on the experience and knowledge of the experts in the VE team. A more organized approach is needed to find the chance of design improvement during a VE workshop. This study presents an organized approach to increasing the chance of idea creation during the VE workshop. The concept of conflict resolution in TRIZ (Theory of Inventive Problem Solving) is applied to understand the problem area during design improvement. The technical parameters were identified in the problem area to explain the conflicts in design improvement. These technical parameters were used to assist problem solving and improve design functions. A case study was done on a temporary construction operation, and demonstrated that the organized idea creation can help improve the design value of the temporary construction operation.

설계VE 과정에서 아이디어 창출은 가장 중요한 부분이다. 그러나 아이디어 창출은 일반적으로 설계VE 팀원의 지식이나 경험을 통하여 진행되게 된다. 설계VE 워크샵에서 좋은 성과를 내기 위해서는 단순하게 설계VE 팀원의 지식이나 경험에 의존하는 것이 아니라 보다 체계적인 접근방법이 필요하게 된다. 본 연구에서는 설계VE 워크샵에서 사용할 수 있도록 TRIZ의 모순충돌 개념을 활용한 체계적인 아이디어 창출방법을 제시한다. 연구과정에서는 TRIZ의 모순충돌 개념을 바탕으로 설계가 가지는 문제영역을 정의하고, 기술적 요인을 활용하여 모순충돌을 나타냈다. 아이디어 창출과정에서 기술적 요인은 설계기능을 향상시키기 위한 체계적 방법론으로 활용됐다. 가시설 공사에 대한 시범사례에서는 본 연구에서 제시한 아이디어 창출절차를 적용할 경우 설계가치를 향상시킬 수 있다는 것을 시범적으로 제시했다.

Keywords

References

  1. Al'tshuller, G.S. (1998). 40 Principles: TRIZ Keys to Technical Innovation. Technical Innovation Center, Worcester MA.
  2. California Department of Transportation (1999). Value Analysis Report Guide, 1st Ed. Sacramention, CA.
  3. Huh, J. (2009). A Supporting Model using TRIZ Concept for Generating Ideas in Design Phase VE, Master's Thesis, Seoul City University.
  4. Jang, S.N., Hyun, C.T., Hong, T.H., Kim, M.J. and Son, M.J. (2009). "Evaluation and idea creation methods for efficient operation of design VE technique." A Proceeding for Annual Conference of Architectural Institute of Korea 29(53), pp. 637-640.
  5. Kim, S.Y. and Yang, J.K. (2009). "An efficient idea creation method of design value engineering for construction projects." Korean journal of Construction Enginnering and Management 7(1), pp. 55-63.
  6. Korea Expressway Corporation (2010). hi-Value VE Process (Research report), Korea Expressway Corporation VE Team.
  7. Lee, G. and Ko, S.S. (2007). "A study on the improvement method for idea from the design VE using ASIT." A Proceeding for Annual Conference of Korea Institute of Construction Engineering and Management.
  8. Lee, I.J., Hyun, C.T., Son, M.J. and Kim, D.H. (2011). "Development of function breakdown structure of Building element based on performance for iea connection in design VE." Korean journal of Construction Enginnering and Management 12(5), pp. 12-22. https://doi.org/10.6106/KJCEM.2011.12.5.12
  9. Ministry of Land, Infrastructure and Transportation (2006). Design VE Manual, MLIT Construction and Environment Team.
  10. Moon, S., Ha, C., and Yang, J. (2012). "Structured Idea Creation for Improving the Value of Construction Design." ASCE Journal of Construction Engineering and Management 138(7), pp. 841-853. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000491
  11. SAVE International (2005). Value Methodology Standard, Dayton, OH.
  12. Stewart, R. B. (2007). Fundamentals of Value Engineering, Xlibris.

Cited by

  1. The Influence Analysis of Value Engineering for the Public Empoyer's Decision Marking - Focused on the Project Life Cycle - vol.16, pp.2, 2015, https://doi.org/10.6106/KJCEM.2015.16.2.012