• Title/Summary/Keyword: VE프로세스

Search Result 46, Processing Time 0.03 seconds

Case Study on the Improvement of Underground Building Works through the VE (VE 적용에 의한 지하 골조공사 개선연구)

  • Hong Jae-Wook;Kim Sun-Kuk;Lee Jong-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.106-113
    • /
    • 2004
  • Most construction project managers should focus on the reasonable cost-down with same quality and function-enhancement with same cost for the value-added construction project delivery in construction industry. Especially, a building structure construction is one of the most important processes to affect the total cost and schedule in building construction project. It means that the process has the possibility of project cost-down or quality-enhancement among the whole project life-cycle. This research focuses on the importance of underground structure of building project by increasing underground use ratio in the urban building construction projects nowadays. This research adopts VE method for the improvement of cost and time by process and analysis dimension modeling on the underground building structure construction, and verifies it throughout the case study, This research is the basic study on the improvement of underground building works through the value engineering method in construction industry.

A Study on the Collaboration of the Function Analysis and Idea Creation Phase with Function Integration FAST(FI FAST) and Hierarchical Value Engineering Concept Modules(HVECM) (통합 기능계통도와 계층적 컨셉모듈을 활용한 기능분석단계와 창조단계의 연계성에 관한 고찰)

  • In, Chi-Sung;NamKung, In-Il;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.355-360
    • /
    • 2006
  • Function analysis and idea creation phase in Value Engineering(VE) Process is applied to manufacturing Industry for developing functions for elements of products, and in construction come to use various components like process, size of project, spaces as well as function itself due to multi-functional aspect. For this reason, VE applications to the construction industry are considered to be less frequent and efficient than to the manufacturing. To resolve this problem, a new technique of Function Integration Fast(HI FAST) and Hierarchical Value Engineering Concept Modules(HVECM) was made for practical integration and sequence of VE job Plan. Two types of function would be defined In this method, first and second function, during the job Plan process, and two function champions be selected for next creation phase process. For verification of consecutiveness of function analysis and idea creation phase for successful VE project implementation, this methodology was tested under design phase in office and IT Multi-functional building project. Make sure the successful application of this process with this method, need to develop the talent of VE experts and team members for process of function analysis and creation phase.

  • PDF

Evaluation of Best Value for Safety Facilities on Highway Using Risk-based VE Approach - A Case Study of Median Barrier - (위험도기반 가치공학적 기법을 적용한 고속도로 교통안전시설 최고가치평가 : 중앙분리대 적용사레를 중심으로)

  • Ji, Dong-Han;O, Young-Tae;Choi, Hyun-Ho;Kim, Sung-Hun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.143-154
    • /
    • 2008
  • Since the concerns for safety of highway traffic safety facilities inherent in various environmental risk is increased, systematic performance, cost, and effect analysis process is needed for this. In case of median barrier among various traffic safety facilities, quantitative risk assessment is inevitable because it has lots of direct/indirect risk factors. Thus, this study suggests an advanced VE(Value Engineering) approach incorporating quantitative risk analysis. For the applicability, suggested VE approach considering alternative 1(140cm) and 2(127cm) is applied to median barrier in fields. Also, major improvement objects are extracted from governing factors of cost and performance based on functional analysis. It is concluded that the proposed risk assessment methodology will provide rational and practical solutions for best value and the approach could effectively applied for various traffic safety facilities by slight modification of suggest process.

Virtual Factory 시스템 구현을 위한 사용자 중심의 Sub-system 및 Interface 설계 연구

  • 이동길;양선모;여동한;박종성;이순요
    • Proceedings of the ESK Conference
    • /
    • 1996.04a
    • /
    • pp.151-151
    • /
    • 1996
  • 컴퓨터 기술의 급격한 발전은 현실세계의 각종 현장을 컴퓨터 가상공간 내에서 시험할 수 있도록 하고 있다. 최근들어급격한 발전이 이루어지고 있는 가상현실(Virtual Reality) 기술과 인간의 감성을 중시한 감성공학적 접근방법 론의 활용은 그 적용범위가 점차 확대되어 가고 있는 상황으로, 제조기업에서 사용되고 있는 통합생산 정보시스템 (Computer Integrated Manufacturing)과의 접목으로 가상공장(Virtual Factory) 시스템을 구현할 수가 있다. 가상공장시스 템은 제조기업의 Businiss를 Design & Engineering, Production Planning & Control, Manufacturing의 3가지 프로세스로 분류한다. 그리고 각 프로세스별로 현재의 CIM시스템에 대한 하부시스템을 검토하고, 인간 중심의 가상기업시스템을 구현 하는데 보완이 되어야 할 사항과 이에 대한 해결 대안으로 Design & Engineering Process에서는 Virtual Engineering(VE) Sub-system, Manufacturing Process에서는 Virtual Manufacturing(VM) Sub-system으로 분류하여 각 Sub-system별 구성모듈을 설계하고 상호간의 Interface 사항을 설계하므로서 가상공장시스템 구현을 위한 기본 요구사항과 조건을 제시하고자 한다.

  • PDF

A Study on the Supply and Demand of Technical Manpower in Construction (건설기술인력의 수급효율화 방안 연구)

  • Park Hwan-Pyo;Ji Sang-Wuk;Lee Kyo-Sun;Park Sang-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.3 s.11
    • /
    • pp.58-65
    • /
    • 2002
  • University graduates from construction-related departments are undergoing serious difficulties in getting a job as construction companies are reluctant to employ new personnel due to the depression in the construction industry which has been downscaled in both domestic and overseas markets. In the situation is like this, statistics show that the percentage of employment among the university graduates is less than $25\%$, the unemployment problem in the construction sector has started to demand urgent countermeasures. This report anticipated demand and supply for technical man power in the field of construction in between 2002-2008. For preparation of an effectiveness of supply and demand plan on over-supplied in construction technical man power, this suggested expansion of SOC investment, induced into IT field of unemployed construction manpower, enlargement of overseas construction manpower And this considered an elastic operation of curriculum related to construction, and arranged an excess supply and demand of construction technical manpower, which has been considered to education that will meet with demand of enterprise, etc. on both side of quantity and quality simultaneously.

A Study on the Application Possibility of Green Building Design Process based on Building Information Modeling(BIM) for Sustainable Architecture (지속가능한 건축을 위한 BIM기반 친환경건축 설계프로세스 적용가능성에 관한 연구)

  • Kim, Mi-Kyoung;Jang, Won-Jun;Choi, Hyun-Ah;Jun, Han-Jong
    • KIEAE Journal
    • /
    • v.11 no.2
    • /
    • pp.113-122
    • /
    • 2011
  • About 30% of the total annual energy consumption on the earth is used in the architectural activities, including construction, maintenance management, and demonstration of a building. Also, 40% of the natural resource consumption, 50% of $CO_2$ emissions, and 20%~50% of industrial waste emissions are produced from a building. Unfortunately, the percentage of its energy consumption is staidly increasing year by year, about 8% every year, and it recently causes a sustainable architectural concept to come to the fore globally. Indeed, the importance of the sustainable architecture is increasingly becoming a worldwide trend. BIM(Building Information Modeling) is considered a new paradigm and a powerful method in building design, construction and maintenance. BIM has characteristics similar to a building's systems. All of the components in a model have a parametric relationship to each other. Understanding and capitalizing on these interrelationships typically takes numerous iterations that span multiple projects. Optimizing the integrated strategies and technologies for a high-performance, sustainable design requires a continual look at understanding how they work together to deliver the best potential. Throughout all of these concepts, we are going to be using a variety of tools that revolve around a BIM model. Some of the tools will require a heavier use of BIM than others, but all of them will utilize the model geometry you've created as part of your design. This study presents importance and validity of energy performance analyzation in the pre-design phase for the sustainable architecture with the support of Building Information Modeling (BIM) technology.

A Decision Methodology for the Priority of Military Facility Remodeling (군 시설 리모델링의 우선순위 결정 방법)

  • Yang In-Cheul;Jeon Yong-Seok;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.406-409
    • /
    • 2003
  • The procedure of present military facility remodeling has many problems at the stage of evaluating the priorities in various remodeling projects which have been caused from lots of corps. These problems have usually happened not only because of the shortage of the cooperation system in the related divisions but also because of the nonexistence of the effective process and method for evaluating the priorities. I've reviewed the study of remodeling and military facility business and applied the AHP(Analytic Hierarchy Process) method which is effective to evaluate the priorities in various groups' decision.

  • PDF

Decision Criterion in Military Apartment Remodeling Project (군인아파트 리모델링에 있어서 항목별 우선순위 결정에 관한 연구)

  • Ryu Kuk-Mu;Kim Gil-Su;Shin Chang-Hyun;Jung Yong- Sik;Chun Jae-You
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.277-280
    • /
    • 2004
  • Since the beginning of our military history, we are continuously interested in supplying apartment for military officers. So we possessed 72,361 households and used in 2002 however, $18\%$ of those are over 20years and need to be remodeled Department of Military has taken this fact seriously To solve the problems, they built more new buildings, rent public buildings and remodeled the old one But, The procedure of present military apartment remodeling has many problems at the stage of evaluating the priorities in various remodeling projects which have been caused from lots of corps. I've reviewed the study of military apartment business and applied the AHP(Analytic Hierarchy Process) method which is effective to evaluate the priority in various groups' decision.

  • PDF

Construction of verification process for the railway total safety technology development project (철도종합안전기술개발사업의 성과물 검증 프로세스 구축)

  • Yoon, Hyuk-Jin;Han, Soon-Woo;Kim, Sang-Ahm;Choi, Kyung-Jin;Cho, Yun-Ok
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1187-1192
    • /
    • 2007
  • Recently, many organizations such as, including government, railroad operational, railroad facilities managemental and research authorities have made a lot of efforts to identify and prevent hazards from leading to accidents and solve them all over the railroad industry. Railroad total safety technology development project conducted as one of national R&D projects has established business formation structure based on system engineering as an effort to define and give a solution to facing problems in the field of railroad. This paper is building procedures to verify the outcomes derived from this project. The verification process is the one for verifying the outcome produced in the final stage of the project or during the project. It makes sure that the system is satisfying the system requirements through verification of the outcomes produced after conducting the project for verification. We've made verification plan for technically reasonable verification using verification process developed through this research, and established master verification plan in the level of 15 detailed projects for interim and final outcomes produced.

  • PDF

Development of Verification System and Selection Process for Track Structure (궤도구조 성능검증체계 및 선정프로세스 구축)

  • Lee, Ho-Ryong;Jang, Seung-Yup;Kim, Yeon-Guk;Yun, Sung-Soon
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.292-298
    • /
    • 2010
  • Recently, with the beginning of the commercial operation of high-speed railway, there have been a number of changes in track structure fields. Also, it is expected that the development and introduction of new technology will be increased afterwards. However, it accompanies a lot of risk to install new track structures of which performance and safety are not verified on permanent ways with high traffic density. Therefore, to minimize the risk and enhance the adoption of new technology, it is required to develop a systemic verification system for track structure. To do this, in this paper, main contents of a draft of guidelines for track structure verification, and main issues in debate such as criteria and method for verification, test conditions and test periods are discussed. Also, a process to choose a most appropriate one for a specific project out of proven track structures by the above verification system, the selection process by the technical investigation committee and the VE process to analyze the economical and maintenance aspects based on LCC concept in Korea Rail Network Authority is introduced.

  • PDF