• Title/Summary/Keyword: VE성과

Search Result 74, Processing Time 0.022 seconds

An Effective Function Analysis Application for Construction VE Projects (건설 VE 프로젝트에서 효과적인 기능분석 적용방안)

  • Choi Seok-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.78-84
    • /
    • 2002
  • In VE(Value Engineering) process, function analysis technique is utilized as a stepping stone to induce creative idea. However, function analysis is regarded as the most difficult job for VE team to undertake. For this reason, the function analysis is not properly applied or even omitted in construction VE studies. The current problems of function analysis in construction VE are following: 1) lack of basic understanding of the function analysis as problem solving technique, 2) the sequential step-by-step analysis process, 3) lack of interrelationship between function analysis and other phase in th VE process, 4) lack of time, experience, training, and quantitative data etc. The existing function analysis is faultiness theoretically. However, it is not enough for efficient use in practice, Thus The study aims to suggest an function analysis application method and to develop a computerized FAST(function Analysis System Technique) diagramming model, called Easy-FAST, for the efficient and effective function analysis on construction VE projects.

  • PDF

The Application of TRIZ for Development of Creative VE(Value Engineering) Project process (TRIZ를 활용한 창의적 VE(가치공학) 프로젝트 프로세스 개발)

  • Kim, Chang-Hui;Ryu, Ji-Cheol;Kim, Gwang-Su
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2010.11a
    • /
    • pp.191-198
    • /
    • 2010
  • 본 논문은 원가절감과 신제품 개발에서 사용되고 있는 VE(Value Engineering)중에서 기능을 높이거나 원가를 낮출 수 있는 아이디어 발상단계에서 TRIZ를 적용하는 것에 대한 기법 개선 연구이다. VE는 미 국방성에서 시작되어 지금은 거의 모든 산업분야에서 적용하고 있는 관리.기술 향상을 위한 혁신 tool이다. TRIZ(Theory of Inventive Problem Solving) 는 러시아 과학자 알트슐러에 의해서 만들어진 창조적 아이디어 발상을 도와주는 아이디어 발상 Tool이라고 할 수 있다. 수 십 만 건의 특허를 분석해서 40가지의 발명원리를 도출해내어 체계적으로 정립한 파워풀한 아이디어 발상 도구 인 것이다. VE활동 중에 원가 절감 또는 제품의 가치 극대화 시키는 아이디어 발상단계에서 TRIZ를 접목한다면 VE의 완성도와 성과가 더욱 높아 질 것이라고 판단된다. 지금 까지 사용해 왔던 브레인스토밍, NM법, 오스본 체크리스트 ${\ldots}$ 등의 아이디어 발상 기법도 훌륭한 방법이지만 좀 더 체계적이고 분석적이며 파워풀한 TRIZ 기법을 활용하여 VE 프로젝트 프로세스를 한 단계 발전시키는 계기가 될 것이다.

  • PDF

VE/LCC Analysis Models of Breakwaters by Fuzzy Reliability Approach (퍼지 신뢰성 이론에 의한 방파제의 VE/LCC 분석모델)

  • Ahn, Jong-Pil;Park, Ju-Won;Yu, Deog-Chan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.159-167
    • /
    • 2007
  • In this study, the concepts of integrated VE analysis assessment is introduced in order to achieve "Design for Deterioration performance" in design VE phase. For this purpose, a framework for fuzzy reliability based LCC and value analysis model using fuzzy logic based approach for breakwaters Projects is suggested. It is anticipated that the methodology Proposed in this paper can also be utilized in the design and maintenance phase of other facilities where decision making is made for the fuzzy reliability based life cycle cost and value analysis.

Improvement plan for Function Definition using CAFAT in the Construction VE (건설 VE에서 CAFAT을 이용한 기능정의 개선방안)

  • Choi, Chang-Hoon;Kim, Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.102-111
    • /
    • 2006
  • In the analysis of function, which is the core and early phase among the procedure of construction VE Job Plan, the accuracy of function definition directly connects to VE result. However, the method of defining function, which is currently used is not accurate and comprehended or is difficult to utilize it systematically. Also, there is not a clear definition about the function for selecting VE so that many difficulties occur in the organic connection between each of functions in the summarization of function after defining function. Therefore, this study cleared the definition of function and made up any counter measured problem occurred in FAST Diagram later on and suggested CAFAT(Combined Antithetic Function Analysis Technique) in order to induce better phase in functional analysis.

A Study on Competency Evaluation Checklist of Design Phase VE Team (설계VE팀의 역량평가 체크리스트에 관한 연구)

  • Seo, Ha-Na;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.154-162
    • /
    • 2008
  • Ministry of construction and transportation has been enforcing extensionally design phase VE(Value Engineering) to the construction costing more than 10 billion won, an importance of design phase VE accordingly is raising to get rid of a waste of cost and noneffective factors previously in construction projects. Although there are legal supports and technical effects, an effect about an introduction of design phase VE can not be applied properly because of several problems at the process. So, in this study, present competency factors of design phase VE to highly raise the output through organizing an effective team at the beginning stage of design phase VE. Find out 29 competency factors through characteristics of design VE team for the check list, classify by team knowledge, team work skill, and team attitude. Get an efficiency regarding importance and find out Competency Evaluation items of design VE team, present a Competency Evaluation plan for indicating an objective standard to Competency Evaluation by measuring relative importance as to each Competency Evaluation item.

Process Development and Verification for Construction VE Object Selection of Performance-Oriented (성능중심의 건설VE 대상 선정 프로세스 개발 및 검증)

  • Kim, Soo-Yong;Yang, Jin-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.25-32
    • /
    • 2012
  • The current VE activity is recognizing the VE object selection in job-plan simply as formal procedure. Therefore, many problems are happening in the process of selecting VE object during the preparatory stage. As a result of trying to analysis problems through literature review and expert interview, the problems were surveyed such as the lack of connectivity between preparatory stage and analytical stage, the temporal cost-based restrictions, and lack of recognition in VE team members in the existing method of selecting subjects centering on the high-cost field. Accordingly, this study suggested the improved method of selecting VE objects in order to solve this problem in the stage of selecting VE objects. An improvement method of selecting VE objects is what selects the secondary VE subjects by applying again Fish-Bone diagram and Worth technique based on the primary VE objects, which were selected by the conventional technique of selecting objects in the high-cost field. To verify effectiveness in the proposed improvement method, it tried to apply it to the actual case of the road construction VE project. As result of, the improvement method was analyzed to be considerably effective in comparison with the existing selection method of VE objects. Therefore, the Improvement method will contribute to increasing the VE performance.

A Study on the improvement method for Idea from the design VE using ASIT (ASIT 기법을 활용한 설계VE 아이디어 개선방안에 관한 연구)

  • Lee, Gun;Go, Seong-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1023-1028
    • /
    • 2007
  • It is the most important thing of the overall VE that we create inventive ideas from idea phase in the design VE. However, it is hard that it take a long time and create a superior idea using Brainstorming. And, it was real to lodge an alternative plan proposed on the idea thinking phase, it is true that an alternative plan of existing simply costdown apply to a change and insert isn't different from an inventive idea deduction. Also creating alternative idea, many expert hold on to only his field and it was exposed a limit depend on a team's experience or intuition than technical solution. In this study, we analyzed the problem of the present design VE processing and analyzed the problem through a survey to an expert, and then we'll suggest a possibility for an efficient design VE.

  • PDF

A Study on Competency Evaluation Item of Design Phase VE Team (설계VE팀의 역량 평가항목에 관한 연구)

  • Seo, Ha-Na;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.797-800
    • /
    • 2007
  • Value Engineering(VE) is being applied as an useful tool to eliminate the waste of cost and noneffective factors previously in construction projects. Ministry of construction and transportation' has been accordingly enforcing extensionally design phase VE to the construction costing more than 10 billion won, an importance of design phase VE. Although there are legal supports and technical effects, an effect about an introduction of design phase VE can not be applied properly because of several problems at the process. So, in this study, try to find out competency factors of design phase VE to enforce a competency of VE team as a basic database for developing a check list, and estimate weight. For the result, find out a competency evaluation item and organize as a team knowledge, a team work skill and a team attitude. Perform a first survey to verify a reliability and propriety regarding the found competency evaluation, perform the second survey competency as to evaluation item of the found 1, 2, 3 class and then estimate the weight by AHP.

  • PDF

A Study on the Application of Design VE Process in Pre-Construction Phase for GMP Determination of CM at Risk Project (시공책임형 CM 사업의 GMP 결정를 위한 시공이전단계 설계VE 프로세스 적용방안 도출)

  • Park, Bo-sung;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.56-64
    • /
    • 2022
  • Although pilot projects have been actively carried out from 2017 to present to institutionalize CM at Risk, one of the major tasks for innovation in the construction industry, standards and processes related to Design VE, a key tool for determining GMP in the pre-construction phase, have not yet been established. Therefore, through research and operation status related to CM at Risk and Design VE, and survey on project participants' perception, the problem of the existing design VE process was derived, and the design VE process suitable for the CM at Risk project was proposed. The application plan was proposed in three aspects: Schedule, Cycle, and Process, and the appropriateness and applicability were verified through FGI. The results of this study are expected to be used as basic data on the establishment and legislation of order standards to be made in the future.

The Application Plan for Value Engineering Redesign by Using The Simulation for The Port Facilities Construction Project (항만시설 프로젝트의 시뮬레이션을 활용한 재설계 VE 적용방안)

  • Yoon, Moo-Hee;Ahn, Kyung-Soo
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.19 no.6
    • /
    • pp.533-546
    • /
    • 2007
  • This paper studied the design VE (Value Engineering) process among the various methods to satisfy the requirement of user and cost saving in the overall redesign process for the Turn-key base construction project. This study has been estabilished the rational and practical analysis process with the stepwise by using the design VE process. The efficiency and safety were verified with the adoptian of computer simulation to cope with the problem of initial analysis and verification for design VE process in the large construction project. In the previous design VE process, there is a limitation for the analysis of design VE in the planing stage and the execution time period of the large construction project. The previous application of VE technique was only for the construction of harbor facilities, so there was no contribution of cost saving in the function and construction. However, this paper proposed the selection methodology of VE items and hence the redesign VE process can be efficiently improved. It can be also improved the process of functional analysis rationally and practically. About 4.6 billion won has been saved with applying to the harbor construction project with using the VE method proposed in this paper. The study gives the direction of VE to be accomplished efficiently in the similar project.