• Title/Summary/Keyword: VE(Value Engineering)

검색결과 172건 처리시간 0.631초

A value assessment model considering carbon emissions and environmental performance (환경성능과 CO2 배출을 고려한 가치평가 모델)

  • Kang, Sun-Im;Kim, Jong-Hyeob;Ji, Soung-Min;Han, Sangwon;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.113-114
    • /
    • 2012
  • With increasing awareness on sustainable construction and green buildings, environment-friendly construction activities have been introduced and promoted. Green value engineering (VE) is an effort that is recently introduced to facilitate environment-friendly construction. To support the application of green VE in construction, this paper suggests a green value assessment model considering the environmental performance and carbon emissions during construction. The value assessment model presented in this study is expected to help conduct objective value evaluation of construction activities in terms of both cost and environmental performance.

  • PDF

Report on VE & LCC (Value Engineering, Life Cycle Cost) Technics Introduction about the Electric Power Equipment (전력시설물에 대한 VE 와 LCC기법 도입에 관한 연구)

  • 김상직;장우진
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 한국조명전기설비학회 2003년도 학술대회논문집
    • /
    • pp.81-86
    • /
    • 2003
  • Recently the introduction of VE & LCC techniques for large size electric power facilities be achieved in various kinds form, of and tends to evaluate to the beginning investment cost when think about cost of electric power facilities usually, but must consider all life cycle cost (maintenance cost, repair cost, improvement cost, operation cost, electric power cost etc.). This treatise applies design techniques that consider copper loss related by voltage drop at power supply of long distance in trunk design and all life cycle cost techniques

  • PDF

BIM-Based New Construction Technology Database Using Parametric Modeling (파라메트릭 모델링을 활용한 BIM 기반 건설신기술 데이터베이스 구축)

  • Kim, Dain;Choi, Jaehyun;Lee, Jin Gang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.163-164
    • /
    • 2023
  • The active promotion of construction technology application, aimed at cost reduction, construction time shortening, and performance enhancement during the implementation of Value Engineering (VE) in design, is underway. However, in the process of deriving VE ideas, it is common to simply reuse VE ideas from similar past construction projects, and the application of construction technology is often insufficient. Therefore, in this study, we intend to establish a database linking construction technology information with Building Information Modeling (BIM) models to activate the application of construction technology in the process of deriving VE ideas.

  • PDF

A Case Study on the Development of an urinary incontinence-preventive equipment (요실금 예방 치료기 제품 개발 사례 연구)

  • Park, Roh Gook
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • 제7권4호
    • /
    • pp.143-148
    • /
    • 2012
  • The problem of common difficulties for the implemented business that imposing the Value Engineering(VE) is crucial. Because of the difference in effect of VE by how an abstract concept as function digitize. Furthermore, to improve achievement of VE,, the advancement of VE is demanded. The most of business conducting the VE is pushing this method with the purpose of cost reduction. As explaining this product, the cost occupies the desktop of F1 and the component of product 54% with the result of analyzing the coefficient of functional requirement. Then the functional cost can be confirmed. Through the result of this study, the fact that the desktop, the bluetooth, the probe occupy the most of products with satisfying the function is able to confirm. An effort for cost reduction in purchasing through adjusting a stable quality demanded for the cost reduction is needed. Also, another effort of proper price reduction by diversification of buyer business is needed also.

  • PDF

AHP 기법을 이용한 교량상부구조의 VE 검토

  • Park, Jang-Ho;Sin, Yeong-Seok;An, Ye-Jun;Lee, Gwang-Gyun
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • 통권52호
    • /
    • pp.58-66
    • /
    • 2011
  • This study presents an algorithm to select the best alternative plane among various bridge superstructure types (Steel box girder, Rational girder, PSC-I girder) using Value Engineering (VE). Economical efficiency, landscape, constructability, maintenance, stability, function of bridge superstructure were taken into consideration in the designing of bridge. Economical efficiency was evaluated for each alternative plan with optimal design considering Life Cycle Cost (LCC), Repair and rehabilitation histories and some factors were set to get reasonable results. In the application of Analytic Hierarchy Process (AHP), consistency of Pairwise Comparisons Matrix was evaluated and the best plan was determined.

  • PDF

A Conceptual Model of Web-based VE Cost Model Analysis System (웹 기반 VE Cost모델 분석 시스템의 개념적 모형)

  • Lee, Chang-Hong;Oh, Chi-Don;Park, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.416-419
    • /
    • 2007
  • In the case of domestic, related information of expenses in order to draw up cost model at the early stage haven't been stored systematically; moreover, similar projects which were accomplished in the past time have lacked data about actual results connected itself. Accordingly, a reliable object hasn't been selected because validity of cost comparing a main function is difficult to dearly decide. Consequently, This study Cost model who can procures and shares and utilizes, studies that is achieved past Cost information of similarity project and achieves in phase zero for target choice of VE activity to systematic and efficient analysis wishes to present conceptional pattern of available Web-Based VE 'Cost model analysis system (Cost Model Analysis System: CMAS)'.

  • PDF

Computer Simulation for Development of Micro-Focus X-ray Generator (미소초점엑스선원 개발을 위한 전산모사)

  • Kim, Sung-Soo;Lee, Youn-Seoung;Kim, Do-Yun;Ko, Dong-Seob
    • Journal of the Korean Vacuum Society
    • /
    • 제20권6호
    • /
    • pp.403-408
    • /
    • 2011
  • To develop the MFX (Micro-Focus X-ray) tube, the trajectories of electrons emitted from the field emission cathode was simulated using SIMION program. Regardless of starting position of the electron in emitter, we found out the fact that there is the optimum extractor voltage Ve, which can focus the electron beam on one place. Extractor voltage Ve varies depending on the source voltage Vs, but the ratio of two voltages (Ve/Vs) is always constant, its value was 99.4%. When the ratio of two voltages (Ve/Vs) was 99.4%, the beam diameter in the cross-over point was $1.2{\mu}m$. Because the focal spot size in MFXG (Micro-Focus X-ray Generator) can not be less than the cross-over diameter within MFX tube, it is important to find out the conditions that can make a smaller beam diameter. Therefore, the above results is considered to be a very important ones in the development of the MFXG.

Value Engineering Approach for Heat Curing Method Under Cold Weather Condition (한중콘크리트 보온양생 공법에 대한 VE분석)

  • Woo, Dae-Hun;Kim, Tae-Cheong;Kim, Jong;Jeon, Chung-Keun;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.21-23
    • /
    • 2010
  • This study was conducted to draw various decisive elements of a reasonable heat curing method and to examine the importance in deciding a construction method when constructing cold weather concrete. As a result, the items proposed as important elements at the time of decision of a heat curing method included economy, workability, maintainability, insulation capability, reduced construction period and usability. As a result of importance by items under AHP technique, it was found the most important element was insulation capability, followed by reduced construction period and workability. As a result of comparison of a heat supplying and a heat insulation method by dual bubble sheet differed 2 times as much as a heat supplying method, especially the evaluation degree by insulation capability and reduced construction period was high.

  • PDF

Problems and Solutions of LCC Analysis in BTL Project for Education Facilities (교육시설 BTL 사업에서 LCC 분석의 문제점도출 및 해결방안)

  • Kim, Chung-Yung;Hong, Tae-Hoon;Hyun, Chang-Taek;Lee, Hyun-Jong
    • Korean Journal of Construction Engineering and Management
    • /
    • 제9권4호
    • /
    • pp.182-192
    • /
    • 2008
  • The purpose of this research is to identify problems and solutions of domestic Life Cycle Cost analysis in BTL(Build-Transfer-Lease), a PFI(Private Finance Initiatives) project. It is expected BTL would be quite effective delivery method for public construction introducing the private's major capital investments and technologies, and obviously LCC analysis is becoming more important factor for success of BTL projects. Nevertheless, there are still some complicated issues in LCC analysis, a technique for selecting the optimal VE(Value Engineering) proposals and estimating OM&R (Operation, Maintenance, & Repair) cost of the buildings, and has been applied limitedly. This research mainly focuses on educational facility, as most frequently delivered by BTL currently, especially with two levels (Alternative LCC and Building LCC) , which is occupied main potion in BTL project. In addition, it identifies four main problems and suggests their solutions through case studies focusing six major factors (WBS, Repair Information, Life Cycle, Time value of money, Repair Information Database, LCC Model) from three projects. Advanced development of this research requires closer partnership between the private / public sectors, and their long term strategies.