• Title/Summary/Keyword: Urgent

Search Result 2,662, Processing Time 0.03 seconds

Distribution and Growth Status of Legally Protected Old and Big Trees in Gwangju, Korea (광주광역시 노거수의 분포 및 생육현황)

  • Lim, Dong-Ok;CheKar, Eun-Key
    • Korean Journal of Environment and Ecology
    • /
    • v.25 no.5
    • /
    • pp.736-746
    • /
    • 2011
  • This study aims tried to present develop a management plan for about old and big trees and legally protected trees by investigating through the present the current status and the distribution of the legally protected trees and old and big tree that range in Gwangju, South Korea. The number of legally protected plants that distributed in Gwangju City is 68 individual trees from 9 species. The largest number was found in Gwangsan-gu (18 trees). The total number of the old and big trees that are distributed in Gwangju City was confirmed as 155 individual trees from 10 species. It must to be corrected to a correct plant species name that species name is written in review articles incorrectly. The average vitality rate of the legally protected plants was 1.2 and the status of ground was 1.7 on average. And the vitality rate of the old and big trees was 1.3 and the status of ground was 2.0 on average. Vitality are not significantly different between the legally protected trees and old and big trees. Ground status of old and big trees worse than legally protected trees. Gingko biloba (found in Gwangsan-gu Songdaedong Daechon village) was only legally protected plant that requires urgent management due to low vitality rate (between 3.2 and 4.0). Among old and big trees Salix glandulosa which is found in Gwangsan-gu Sansu-dong Gamdong village was only one that requires urgent care. The most important status for the old and big tree is securing minimal space for growth. Therefore, we conclude that the most urgent measure in the management and projection of old and big trees and legally protected plants is removal of asphalt or cement above the surface of root system.

The Role of CM for Fast track Completion of Urgent Typhoon Recovery Construction Projects - Gangwon-Do Cases - (수해복구공사 조기착공을 위한 CM의 역할 재조명 - 강원도 사례를 중심으로 -)

  • Kim, Kyoung Nam;Choi, Jae-ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.355-362
    • /
    • 2008
  • Fast track completion of urgent typhoon damage recovery construction project is becoming crucial for the prevention of the secondary damage from the next year typhoon, prompt psychological stabilization of flood sufferers, the early recovery of damaged infrastructure condition and so forth. As the recovery learning process has been continued for last consecutive typhoons and experts suggested, the keys in attaining the goals of the project (preventative, sustainable, cleaner and fast tracking development) are found to be the early contracting and improved competencies in project management especially during the design phase. It can be presumed that the former is attainable through administrative supports in the form of government guidelines, but the latter necessitates more research efforts. In this regards, this study aims to find a way how to lift up the current level of project management capability facing ever changing project mangement environment of urgent typhoon recovery project. By comparing the current level of application of government guidelines in flooded districts and analyzing the time required for each phase from design contracting to construction starting, several reformative ideas are illustrated in association with the necessity of adopting CM method in the deign phase. It is highly expected that CM application in the design phase can be an effective alternative in overcoming current limits in improving the quality of the project and prevent the delay due to the lack of expertise and professional workers in the owner side.

Delayed Ascending Aorta Replacement in Blunt Chest Trauma with Aortic Injury

  • Son, Shin-Ah;Kim, Gun-Jik;Do, Young Woo;Oh, Tak-Hyuk
    • Journal of Trauma and Injury
    • /
    • v.31 no.1
    • /
    • pp.24-28
    • /
    • 2018
  • Ascending aortic injury after blunt chest trauma is an emergency condition that requires urgent diagnosis and treatment. The authors report the case of a patient with traumatic ascending aortic injury who received ascending aorta replacement under cardiopulmonary bypass after failure of primary repair.

Risk Assessment Technique and its Application for Complex Equipment(Focused on the Method for Choosing Quality and Risk Characteristics) (복합시스템 장비의 위험평가 기술 및 적용에 관한 연구(품질 및 리스크 특성 선정방법 중심으로))

  • 김종걸;정진호
    • Journal of the Korea Safety Management & Science
    • /
    • v.6 no.2
    • /
    • pp.91-101
    • /
    • 2004
  • Consumers require various quality characteristics including safety. The reduction of risk concerned on product safety becomes an urgent issue in leading companies. The strategy for customer satisfaction by choosing attractive quality characteristic is not enough for risk reduction in view of producer. This paper presents a method for choosing quality characteristics and risk characteristics by integrating QFD based on quality requirements and AHP based on safety requirements, also shows its application for complex equipment.

Trends of International Environmental Regulation (외국의 환경규제 동향)

  • Lee Hyeon-Yong;Song Jun-Yeop;Gang Jae-Hun
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2006.04a
    • /
    • pp.385-390
    • /
    • 2006
  • Air pollution problem has been one of the most urgent global environmental problems since UN Framework Convention on Climate Change accepted in Rio Conference, 1992. International environmental regulations of global community to reduce the green house gases have influenced the domestic environmental policies. International trends of environmental regulation are introduced in this paper.

  • PDF

A study on the Change in the Information Gathering System and Management of the Technical Cooperation (정보환경 변화와 기술협력 관리에 관한 연구)

  • 이진영
    • Journal of the Korean BIBLIA Society for library and Information Science
    • /
    • v.8 no.1
    • /
    • pp.19-54
    • /
    • 1997
  • This thesis is to study the change in the information gathering system and the management of the technical cooperation. It is on urgent business for an enterprise or a preson to get proper information in modern information flood. To come up with the developed countinues it need to estimate the current world economice condition and to investigate the world economice circumstances. By this investigation we can establish a strategy to get necessary information. Information management will be needed to deal with the flooding new infermations.

  • PDF

Production Planning and Order Receiving System for Capable-To-Promise in Supply Chain Management (SCM을 위한 납기확약기반 생산계획 및 수주시스템)

  • Kim, Nae-Heon;Noh, Seung-Jong;Wang, Gi-Nam;Rim, Suk-Chul
    • IE interfaces
    • /
    • v.13 no.3
    • /
    • pp.396-404
    • /
    • 2000
  • For most order-based production, it is important to meet urgent orders from important customers while maintaining high on-time delivery rate for successful supply chain management. In this paper, we propose an approach and a structure of planning system to implement Capable-To-Promise which promises the delivery time to the received order. We suggest and compare a few alternative order receiving policies for CTP.

  • PDF

Implementation of Wafer Handling Robot Controller Based on RTAI (RTAI 기반의 웨이퍼처리 로봇 제어기 구현)

  • Chang, Soon-Pill;Shin, Ik-Sang;Moon, Seung-Bin
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.25 no.9
    • /
    • pp.45-52
    • /
    • 2008
  • As multiple functions arc required in a robot controller, RTOS(Real Time Operating System) should be adopted to manage complex situations, such as choosing most urgent task among competing ones. In this paper, we implemented RTAI(Real Time Application Interface) based robot controller for wafer handling robots including graphic simulator. We showed how multiple tasks are organized and also explained in detail about task priorities and execution periods. Finally, we presented simulation results.

Reconstruction of tracheal stenosis: report of one case (기관협착증 치험 1)

  • 윤갑진
    • Journal of Chest Surgery
    • /
    • v.17 no.3
    • /
    • pp.492-496
    • /
    • 1984
  • For the treatment of acute respiratory failure and emergency care of an urgent patient, tracheostomy in itself may have been a life saving procedure. But, tracheal stenosis gives serious clinical manifestation which can only be corrected by surgical intervention in many occasions. We experienced one case of tracheal stenosis following tracheostomy for assisted ventilation. Tracheogram showed a 4.0 cm segmental narrowing below the tracheostoma. Before reconstruction, we tried to T-tube cannulation, but the result was not satisfactory. So we resected the narrowed segment and tracheal reconstruction was performed with uneventful result.

  • PDF

A Survey for the Development of Mathematical Gifted Education Program (수학 영재교육 프로그램 개발을 위한 조사 연구)

  • 송상헌
    • School Mathematics
    • /
    • v.1 no.1
    • /
    • pp.51-93
    • /
    • 1999
  • This survey is to know the present situation and effective alternatives of mathematics gifted education program for the 5-8 grade students in Korea. This is aiming at finding effective ideas useful to the definition of the gifted, the development of the methods and tools for identification, the proper organization of program and urgent issues. The number of collected questionnaire available by mailing is 92; 21 specialists, 24 experienced teachers and 47 scholars who are concerned with the education for the gifted. Not translated original Korean-Questionnaire is in the appendix.

  • PDF