A Study on the Practices of Landscape Planning & Design Services in Korea (조경계획.설계 기술용역의 수행실태에 관한 조사연구)

  • 권오준;심경구;김유일;고동완
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.21 no.4
    • /
    • pp.113-129
    • /
    • 1994
  • This study is designed to analyze the trends of professional services in Landscape Architecture during the past 5 years(1987-1991) in Korea. The data were collected from 1,117 projects from 56 engineering and landscape architecture firms. The findings are summarized as follows: 1) The projects have been increased annually by 19 percent in numbers and by 47 percent in money terms. 2) The main sources of projects are local governments and corporations. However the private sector comprise 31 percent in projects number and 46 percent in money terms. 3) The public park and tourism site development comprise a half of the projects. Recently recreational forest, golf, amusement and large housing site development have increased very rapidly. 4) In terms of workscope they are devided by 'complex' project which include extensive engineering works and 'simple' project which contain mostly planting design. The former include receational project with average 5 or 6 months contract period, and the later include housing and building site design with 2 or 3 months period. 5) Two types of consulting firms are typical. One is comprehensive engineering firms with urban planning section and few landscape section. The other is specialized professional firms with urban planning or landscape architecture. 50 percent of the project was done by comhensive engineering firms and 60 percent was done by urban planning section. The implication of these findings are broad: Firstly, We have to meet the demands in private secter mostly in recreation and leisure related projects. Secondly, landscape architects and project managers need more professional skills and coordination ability to deal with 'complex' projects. Thirdly, to enhance the quality of professional services it is required to have enough work time and higher service fee through legal and institutional enforcements.

  • PDF

Activation of Harbor City Renovation Projects based on Residents Participation: Case Study of Busan North Harbor Redevelopment Project (주민참여를 통한 항만형 도시재생사업의 활성화 방안 - 부산 북항재개발사업을 중심으로 -)

  • Ryu, Dong-Gil;Park, Won-Seok
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.13 no.3
    • /
    • pp.381-397
    • /
    • 2010
  • The purpose of this paper is to examine the activation of harbor city renovation projects through analyzing the measures of residents participation and urban marketing, based on case study of Busan North Harbor Redevelopment Project. The main results of this study are as follows. Firstly, according to questionnaire survey, public opinion surveys, citizen advisory committees are more effective as the methods collecting residents' opinion. Especially, residents' opinion is most important on the stage of deciding final alternative. Secondly, according to questionnaire survey about urban marketing, respondents prefer local government as a main agent of urban marketing. They prefer improving urban infrastructures as a main issue of urban marketing. They also prefer enhancing positive image of havor city and promoting the city for foreign tourists, as effective measures of urban marketing. As a result, activation of harbor city renovation projects will be activated through the residents participation and urban marketing, because those may stimulate creative and distinctive development ideas.

  • PDF

Analysis of Environmental Factors Affecting on the Reduction Rate of Land Compensation in Urban Development Project (도시개발사업의 토지부담률에 영향을 미치는 환경적 요인분석)

  • Koo, Ja-Kon;Sun, Jong-Geun;Jung, Min-Jung;Hong, Ji-Yeon
    • KIEAE Journal
    • /
    • v.11 no.2
    • /
    • pp.3-8
    • /
    • 2011
  • This study was carried out for analysing the relationship of environmental factors and the reduction rate of land compensation of six urban development projects near waste landfill sites located in the Seoul metropolitan area. For a close investigation, 24 variables were selected but only 4 environmental variables were identified to have high correlation to the reduction rate of compensation. These are fine particles(PM10), bad smell, the ratio of a greening zone of land and park, and the distance in straight line from the landfill site. Two variables-PM10 and bad smell-were found to have an effect on the average reduction rate of land compensation by correlation analysis. On the other hand, the ratio of a greening zone and the distance in straight line from the landfill site have been rejected for the significance test. The result of regression analysis of six models for the search of affecting variables on the reduction rate of compensation is that PM10 and bad smell have the impact ratio of more than 0.5. But the ratio of greening zone and the distance from the landfill are not significant factors, having the impact ratio of 0.025~0.045 except one model.

Development of Change Management System for Urban Development Project (신도시 건설사업의 변화관리시스템 구축에 관한 연구)

  • Cho, Jinyoung;Jang, Ounsung;Yu, Junhyuk;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.79-86
    • /
    • 2014
  • Construction project become larger and more complicated. Korea go through government complex relocation Mega-size program including many sub-projects which were complicated, long-term, and need extensive funding. Effective change management is very important for this kind of mega-project since it has many stakeholders and can't avoid continual change of schedule, budget, etc. Especially, change management process and system is very important for program success. When each project have changes, program is impacted by these changes. So, Change management is very important for effective program budget and time management. This study try to develop change management process and framework considering continuous changes in project level for effective program management. In addition, this study developed change management system and applied it to new mega-size program and analyze the effectiveness.

Suggestions for Ecological Stream Restoration (생태하천 복원 방안)

  • Kim, Myungjin
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.1
    • /
    • pp.59-68
    • /
    • 2007
  • Urban streams have been severely degraded with wastewater and concrete structure over a prolonged period. The Chonggyecheon Restoration Project recovered a stream in the downtown Seoul with landscaping, plantings and bridges after the cover concrete and elevated asphalt road were removed. The project has been criticized partly because it is not an ecological restoration but rather the development of an urban park with an unnaturally straight flowing stream, artificial building structures, and artificial water pumping from the Han River. Nevertheless, the public have praised the project and almost 100,000 visitors per day come to see the reeds, catfish, and ducks. The stream restoration project is attractive to central and regional government decision makers because it increases the public concern of landscape amenity. Several projects such as Sanjichon and Kaeumjungchon are on going and proposed. These projects have a common and different respect in scope and procedure. The Chonggyecheon project in the process of environmental impact assessment (EIA) and prior environmental review system (PERS) reviewed the environmental impacts before development. Kaeumjungchon in the PERS and Sanjichon without EIA and PERS are reviewed. EIA and PERS systems contribute to checking the ecological sustainability of the restoration projects. A stream restoration project is a very complex task, so an integrated approach from plan to project is needed for ecologically sound restoration. Ecological stream restoration requires 1) an assessment of the entire stream ecosystem 2) establishing an ecologically sound management system of the stream reflecting not only benefits for people but also flora and fauna; 3) developing the site-specific design criteria and construction techniques including habitat restoration, flood plains conservation, and fluvial management; 4) considering the stream watershed in land use plan, EIA, PERS, and strategic environmental assessment (SEA). Additionally the process needs to develop the methodologies to enhance stakeholder's participation during planning, construction, and monitoring.

Review of the Physical Evaluation Factors of the Campustown Project - Focused on Seoul Campustown Project - (캠퍼스타운 조성사업의 물리적 평가요소 검토 - 서울시 캠퍼스타운 조성사업을 중심으로 -)

  • Chu, Hyun-Soo;Baek, Tae-Youl;Kang, Jun-Mo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.1
    • /
    • pp.149-157
    • /
    • 2018
  • The purpose of this study is to identify important evaluation criteria that need to be prioritized by developing one for the campustown development project in Seoul. To achieve this, we examined the list of initial ideas for the project and selected the criteria that corresponds to the goal of the project. Moreover, we conducted AHP and preference survey to further refine the evaluation criteria. As a result, improvement of walking space and providing urban regeneration base space were found to be most important; utilizing high density mixed land use was rated as least important. Based on the findings, the proposed evaluation criteria can help the process of the project as guidelines. As initial evidence it can also guide us for a future development direction in between the completion of the first project and the start of the second stage of the project.

A Study on the Improvement of the Management Plan of City Master Planning as ODA Project (ODA 사업으로서 도시 마스터플랜 수립 사업의운영방식 개선에 관한 연구)

  • Kim, Yong-Jin;Kim, Seong-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.4
    • /
    • pp.2799-2806
    • /
    • 2015
  • This study aims to find out the better management plan for city master plannning as an ODA to accomplish the economic effect. For this study, the "Hai Phong New Town Development Project" and the "Modification of Hue City's Master Plan" were studied. The result of the case study shows that there was difference between the two projects which was the status of following projects. While those two projects were highly acclaimed, only Hue project had several projects. This is because of the understanding degree on ODA project of participants, the distinct characteristics of the recipient country; Vietnamese local and central government, and the difference of each project's main purpose. And the result of FGI shows that to accomplish economic effects of master planning project as ODA, the enthusiastic approach to find out following project from the beginning step of the master planning, the experience of project manager on ODA, the close association with the recipient country, and the positive support from the Koica especially, the local office were crucial.

Land Development Project Area Underground Facility Management A Plan Using GIS (GIS를 활용한 택지개발사업지구 지하시설물 관리방안)

  • 김감래;이재기;임건혁
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2003.10a
    • /
    • pp.329-334
    • /
    • 2003
  • The aim of this study is propriety review for underground facility surveying on development area of land for housing and efficient management. Because of integration information administration system construction of the nation and development of information technology, construction of Urban information system(UIS) to manage systematically city space is increasingly necessary We manage systematically attribute information for each lot in the development area of land lot housing that it Is connected with NGIS in order to drive gradual computerization of underground facilities and arrange the base of facility management. Review arrangement methods on development area of land for housing makes it to check safety accident of urban and to leading base of urban information. Thus, this study draw the most suitable way through analysis of driving methods and expectation effect from above facts.

  • PDF

Factors affecting road construction project performance in Addis Ababa, Ethiopia

  • Mekonnen Tibebu CHEKOL;Michael HENRY
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.1112-1119
    • /
    • 2024
  • Addis Ababa, the capital of Ethiopia, has been lacking an adequate road network to ensure community access to social, political, and economic resources and to facilitate economic development. The road network coverage was about 22.5% in 2022, which is below the minimum international standard of 25%. To improve accessibility and mobility, the Addis Ababa City Roads Authority(AACRA) has engaged its own force crew (contractor), as well as local and foreign road contractors, in the construction of urban roads. However, these road construction projects are rarely completed within the estimated time and cost, along with a variety of other issues that also need to be addressed. This study aims to explore the application of lean construction for improving the performance of urban road construction projects in Addis Ababa City. A survey of road construction stakeholders was carried out to evaluate their perspectives on the importance of project performance indicators, with the goal of identifying key factors affecting road construction project performance. First, a list of performance indicators was prepared based on a review of lean construction literature, and a total of 38 identified factors were grouped into six performance indicator categories. Cross-tabulation analysis of the stakeholder perspectives was then carried out, and it was found that the indicators that affect the performance of urban road infrastructure projects (in descending order of importance) were: time, quality, cost, risk, safety, and sustainability. Through this analysis it was concluded that right-of-way issues, delay to finish, inflation, contractor capacity, and scope change with change order are also major factors that affect the performance of urban roads construction projects. Clarification of these factors will provide AACRA with useful information on what aspects of lean construction should be prioritized when evaluating future construction projects.

Development Framework of Interactive Electronic Technical Manual for Urban Regeneration

  • Son, Bo-Sik;Yu, Jung-Ho;Park, Moon-Seo;Jeong, Jin-Wook;Lee, Sang-Hyun
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.1
    • /
    • pp.20-26
    • /
    • 2012
  • Urban regeneration is a large-scale program that must address challenges such as a significant number of involved projects, diverse participants and their conflicting objectives, and a long life span. In an effort to address these issues, the Interactive Electronic Technical Manual (IETM) is applied to urban regeneration in order to provide a guideline to enhance urban regeneration program management. Through a survey, three major functionalities required in the IETM are identified: process map provision, customized information delivery, and communication ability with other information systems. To achieve these functionalities, the development framework of the IETM and the associated technologies are examined.Its characteristics can be sum up ontology-driven metadata, user-oriented process map composition system and so on. Finally, the usage scenarios of the IETM are discussed.