• Title/Summary/Keyword: Urban Development Project

Search Result 590, Processing Time 0.032 seconds

A Study for Vitalizing Street-Housing Redevelopment Projects: Analyzing the Survey of Residents' Needs (주민의견조사를 통한 가로주택정비사업 활성화 방안 연구)

  • Joo, Kwan-Su;Kwon, Hyuck-Sam;Cho, Jae-Seong;Park, Kun-Suk
    • Land and Housing Review
    • /
    • v.4 no.3
    • /
    • pp.243-258
    • /
    • 2013
  • This study aims to introduce "Street-Housing" Redevelopment Projects adopted by the revision of regulations in 2012 and promote them by surveying residents' needs. The objectives of the street-housing redevelopment projects are to maintain existing street systems and redevelop housing by small units, as an alternative to the large-scale housing redevelopment by the expropriation. Residents, however, do not seem to support the new projects since they are satisfied with their current housing, have difficulty in raising funds, and are uncertain about proceeding with the pre-arranged. Despite these barriers, residents may support the projects if project charges can be lowered by the reduction in each resident's share and the increase in supporting funds. This study proposes new practical methods for realizing the projects: choice of an appropriate site, engaging for resident's participation in projects, reduction in project charges, and removal of barriers to co-operative development. etc.

A Research on the Promotion of AMI Supply by the Development of 1:N Mounted Remote Meter Reading Device (1:N HUB 기능을 가진 원격검침 단말기 개발에 따른 AMI 보급 추진 방안 연구)

  • Lee, Hyoung-Min;Kim, Min-Gi;Choi, Eun-Il;Yoon, Chan-Sik
    • Journal of the Korean Institute of Gas
    • /
    • v.25 no.6
    • /
    • pp.1-6
    • /
    • 2021
  • In this study, we developed AMI terminals of 1 (reader): N (small transmitter). Currently, the government is focusing on the Gas AMI demonstration project to advance the outdated metering system of the urban gas industry, led by the government-sponsored ministries. The supply of gas AMI meters has the advantage of resolving uncertainties in privacy violations and measurement information and preparing for consumer safety through gas leakage detection. In the case of existing AMI meters, readers and transmitters were 1:1 methods, while this technology can be extended to multiple generations with a 1:N method, and a technology that can extend battery life by implementing a low-power design is applied. We hope that this research will contribute to the gas AMI supply project in the future.

AUTOMATIC DATA COLLECTION TO IMPROVE READY-MIXED CONCRETE DELIVERY PERFORMANCE

  • Pan Hao;Sangwon Han
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.187-194
    • /
    • 2011
  • Optimizing truck dispatching-intervals is imperative in ready mixed concrete (RMC) delivery process. Intervals shorter than optimal may induce queuing of idle trucks at a construction site, resulting in a long delivery cycle time. On the other hand, intervals longer than optimal can trigger work discontinuity due to a lack of available trucks where required. Therefore, the RMC delivery process should be systematically scheduled in order to minimize the occurrence of waiting trucks as well as guarantee work continuity. However, it is challenging to find optimal intervals, particularly in urban areas, due to variations in both traffic conditions and concrete placement rates at the site. Truck dispatching intervals are usually determined based on the concrete plant managers' intuitive judgments, without sufficient and reliable information regarding traffic and site conditions. Accordingly, the RMC delivery process often experiences inefficiency and/or work discontinuity. Automatic data collection (ADC) techniques (e.g., RFID or GPS) can be effective tools to assist plant managers in finding optimal dispatching intervals, thereby enhancing delivery performance. However, quantitative evidence of the extent of performance improvement has rarely been reported to data, and this is a central reason for a general reluctance within the industry to embrace these techniques, despite their potential benefits. To address this issue, this research reports on the development of a discrete event simulation model and its application to a large-scale building project in Abu Dhabi. The simulation results indicate that ADC techniques can reduce the truck idle time at site by 57% and also enhance the pouring continuity in the RMC delivery process.

  • PDF

Long-term Relative Humidity Changes on High Temperature Days of Major Cities in Korea for the Recent 37 Years (최근 37년간 우리나라 주요도시의 고온일을 대상으로 한 상대습도의 경년변화)

  • Park, Myung-Hee;Lee, Joon-Soo;Suh, Young-Sang;Han, In-Seng;Hae, Hyun-Gun;Kim, Hae-Dong
    • Journal of Environmental Science International
    • /
    • v.22 no.12
    • /
    • pp.1671-1681
    • /
    • 2013
  • The study selected 10 regions among major Korean cities. Then the study classified the yearly change of relative humidity of those regions for 37 years based on 1996 (from 1974 to 2011) aimed at high temperature days, and examined them by stage regarding daily maximum temperature. For large cities and small cities, in general relative humidity had been likely to increase at high temperatures of $30^{\circ}C$ or over before 1996, whereas it has decreased since 1996. For suburban areas, relative humidity had been prone to diminish before 1996, whereas it has been likely to either increase since 1996 or rarely some of the cities have not shown any change. The increasing tendency of relative humidity before 1996 in large cities and small cities is believed to be because of an increase of the latent heat of vaporization by the supply of steam from cooling towers established in downtown areas. Meanwhile, the decreasing tendency from 1996 is concluded to be caused by the change from counter-current circular cooling towers, which produce a great quantity of steam including arsenic acid, to cross-flow cooling towers, which produce hardly any steam containing arsenic acid. This change was in accordance with the modification and pursuit of an urban planning law that ordered cooling towers that had been installed on rooftops be installed in the basement of buildings in consideration of a "Green network creation" project by the Ministry of Environment, urban beautification, concerns since 1996 over building collapses, and according to an argument that steam containing arsenic acid could be harmful to human health owing to chemicals contained in the water in the cooling tower in summer.

A Study on the Improvement of Legal Policies for Activating Public Open Space in Urban Environment Improving Project of Seoul City (서울시 도시환경정비사업 내 공개공지 활성화를 위한 제도개선에 관한 연구)

  • Kim, Do-Kyong;Kim, Kun-Young
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.39 no.5
    • /
    • pp.21-32
    • /
    • 2011
  • The district units planning suggests not only detailed standards of building as parts of the whole plan in the district but also a guideline of the arrangement, shape and pavement of the public open space, in order to move away from the rigid image of an institution which causes the formal creation of it. This triggered various problems. While the basic plan for adjustment of urban environments(established in 2005) was being reorganized in order to reflect changed conditions of the city center, the sector of public open space was subdivided according to the guidelines of development by district. We conducted a comparative analysis of conditions before and after the adjustment, so as to examine whether or not the reorganized institution is effective for the plan of public open spaces. The analysis showed that there was no remarkable change between the basic plan and the reorganized institution in that items which were not any different from the existing building codes were established due to lack of guidelines related to public open space under the law of urban and residential environmental improvement. Low regulations should set up criteria for establishment from a concrete, effective microscopic aspect appropriate to the significance of public open space by the linking of public open space and the surrounding environment, whereas high regulations such as building codes should specify essential components.

Private Procurement for Constructions and Operation of Buman Road in Daegu (도시 인프라 시설을 위한 민자 유치 -대구시 범안로 민자도로의 운영 실태와 대책-)

  • Choi, Byung-Doo
    • Journal of the Korean association of regional geographers
    • /
    • v.13 no.6
    • /
    • pp.674-694
    • /
    • 2007
  • Recently private procurement projects for urban infrastructure have been emphasized and introduced by government(both central and local) as an important method to supplement public budget shortage and to improve creativity and efficiency in its construction and operation, and hence to promote regional development. But these private procurement projects seem to be implemented under the neoliberal condition of urban policy for private capital to extend its sphere of investment and to ensure its opportunity of profit. Such private procurement projects for urban infrastructure have been legislated and widely applied since 1994 in S. Korea, but in recent years they have triggered out a variety of serious problems. In results of this study on the private procurement for construction and operation of Burnan Road in Daegu, it can be pointed out, it has led serious problems such as overestimation of traffic volume in plan, over-appropriation of construction cost and appurtenant business, irYational operation and account of the operating firm, problem in refinancing and change in contents of practical agreement, and over-compensation of minimum operation revenue. Some measures that can be considered as alternatives to resolve those problems and to operate more rationally the Buman Road include those of increasing traffic revenues, of reducing supports of public financing, and withdrawal of (part or whole of) operational right from the private firm.

  • PDF

A Study on the Development of Urban Roads Convoy Driving Service and Effect Analysis (도시부 도로 호송주행(Convoy Driving) 서비스 개발 및 효과분석)

  • Son, Seung-neo;Lee, Ji-yeon;Cho, Yong-sung;Park, Ji-hyeok;So, Jae-hyun(Jason)
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.21 no.1
    • /
    • pp.51-63
    • /
    • 2022
  • Convoy driving is one of the technologies of multi-vehicle cooperation driving along with platoon driving. All over the world, research on vehicle control mechanisms to maintain vehicle formation during convoy driving convoy driving has been actively conducted and in Europe's Autonet 2030 project has developed and demonstrated convoy driving services for highways. But, even the concept of convoy driving is still insufficient in Korea. Therefore, in this study, the concept of convoy driving service was established and scenarios and communication messages for service application on urban roads were developed. And its effectiveness was verified through simulation analysis. As a result of comparing and analyzing individual vehicle cooperative driving and convoy driving for the blind spot support service and dilemma zone safety support service, which are representative V2I cooperative driving services on urban roads, the number of conflicts(indicator of traffic safety) and delays and stops(indicator of traffic efficiency) are significantly improved in convoy driving compared to individual vehicle cooperative driving.

A study on the Project Planning Method of Areas near St.Pancars Station & King's Cross Station in London (런던 St.Pancars Station & King's Cross Station 인접지역의 철도역사 기반 도시재생계획에 관한 연구)

  • Shin, Ye-Kyeong
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.6 no.10
    • /
    • pp.603-612
    • /
    • 2016
  • This study will observe the following subjects based on the railroad: First, the development of St. Pancreas Station, which is the gateway to London from other Europe continent, and King's Cross Station, which connects all the intercity within London. Second, the planning characteristic of urban regeneration case which was driven from Camden district, the center of King's Cross Central, which is located in between the two stations, St. Pancreas and King's Cross. Third, based on the the two stations and urban regeneration, this study attempts to investigate the direction of urban regenerating plan and its detailed strategy. As a result, King's Cross Station, St. Pancreas Station and the King's Cross Central area, which is an adjacent area from the two stations, were a slum for a long time. However, the two close stations played a role as the United Kindom and London's railroad network by sharing the common denominator of having the international high-speed railway among the Europe continent and being the connection of National railroads within London. Eventually, based on such potential of railroad traffic, King's Cross Central area was newly regenerated. The consequence of this study has shown that not only the physical modernization of buildings, implementation of compact railroad network supporting both ground and underground of each area or traffic connection was organized in London, but also secured the pedestrian way for easier transfer and planned and allocated facilities by considering citizen's publicness and multilateral use.

Validating the Structural Behavior and Response of Burj Khalifa: Synopsis of the Full Scale Structural Health Monitoring Programs

  • Abdelrazaq, Ahmad
    • International Journal of High-Rise Buildings
    • /
    • v.1 no.1
    • /
    • pp.37-51
    • /
    • 2012
  • New generation of tall and complex buildings systems are now introduced that are reflective of the latest development in materials, design, sustainability, construction, and IT technologies. While the complexity in design is being overcome by the availability and advances in structural analysis tools and readily advanced software, the design of these buildings are still reliant on minimum code requirements that yet to be validated in full scale. The involvement of the author in the design and construction planning of Burj Khalifa since its inception until its completion prompted the author to conceptually develop an extensive survey and real-time structural health monitoring program to validate all the fundamental assumptions mad for the design and construction planning of the tower. The Burj Khalifa Project is the tallest structure ever built by man; the tower is 828 meters tall and comprises of 162 floors above grade and 3 basement levels. Early integration of aerodynamic shaping and wind engineering played a major role in the architectural massing and design of this multi-use tower, where mitigating and taming the dynamic wind effects was one of the most important design criteria established at the onset of the project design. Understanding the structural and foundation system behaviors of the tower are the key fundamental drivers for the development and execution of a state-of-the-art survey and structural health monitoring (SHM) programs. Therefore, the focus of this paper is to discuss the execution of the survey and real-time structural health monitoring programs to confirm the structural behavioral response of the tower during construction stage and during its service life; the monitoring programs included 1) monitoring the tower's foundation system, 2) monitoring the foundation settlement, 3) measuring the strains of the tower vertical elements, 4) measuring the wall and column vertical shortening due to elastic, shrinkage and creep effects, 5) measuring the lateral displacement of the tower under its own gravity loads (including asymmetrical effects) resulting from immediate elastic and long term creep effects, 6) measuring the building lateral movements and dynamic characteristic in real time during construction, 7) measuring the building displacements, accelerations, dynamic characteristics, and structural behavior in real time under building permanent conditions, 8) and monitoring the Pinnacle dynamic behavior and fatigue characteristics. This extensive SHM program has resulted in extensive insight into the structural response of the tower, allowed control the construction process, allowed for the evaluation of the structural response in effective and immediate manner and it allowed for immediate correlation between the measured and the predicted behavior. The survey and SHM programs developed for Burj Khalifa will with no doubt pioneer the use of new survey techniques and the execution of new SHM program concepts as part of the fundamental design of building structures. Moreover, this survey and SHM programs will be benchmarked as a model for the development of future generation of SHM programs for all critical and essential facilities, however, but with much improved devices and technologies, which are now being considered by the author for another tall and complex building development, that is presently under construction.

Problems in Management of Rural Special Production Area and Improvement of Political Countermeasures (In the Case of Chungnam Province) (농어촌(農漁村) 특산단지운영상(特産團地運營上)의 문제점(問題點) 및 정책적(政策的) 개선방향(改善方向)(충청남도(忠淸南道)를 중심(中心)으로))

  • Lim, Jae Hwan
    • Korean Journal of Agricultural Science
    • /
    • v.20 no.1
    • /
    • pp.88-101
    • /
    • 1993
  • This study is aimed at evaluating the present management status of the rural special production area development projects and identifying managerial problems to propose new direction of the political countermeasures for the projects. In the con text of implementing the five year's economic developent plans for the past three decades, agricultural production and farm-household income have also been grown rapidly. However the income gap between rural and urbarn laborer, as an internal problem, has widened during the decades and the UR problems concerning free trade of agricultural products, as an external problems, are now agonizing the small-holder farm economy in Korea. The internal and external farm problems could be solved through improvement of agricultural structure and provision of off-farm jobs for farm household income increase. As a part of the off-farm income sources, the rural special production area development projects have propelled by the government throughout the country. The main problems to be solved for the successful implementation of the projects are as follows : 1. Present loan amount by the financial fund was estimated at 6-7% of the total installation costs required. To expand and implement the project successfully, enough financial credit support with favorable terms and conditions have to be considered by the government. 2. The operation patterns of the special production area development project should be recommended from the view point of cooperative and private operation to maximize farm household incomes including profits, marketing charges and dividens. 3. Improvement of the marketing channel of the products and marketing information through TV program and other mass communication should be implemented strongly to promote marketsales by the financial supports of the government. 4. In connection with the off-farm income increase, the population migrating to urban area in outside Chungnam province equivalent to 10-12 thousand persons with age of 20-49 years should be taken into account politically to be employed in the projects in the province. 5. Surplus farm labors should be created by means of improvement of agricultural structure including large farm management with farm mechanization and job opportunities have also to be provided in connection with the rural special production area development projects. The two imminent subjects are the prerequisites to increase off-farm incomes for the farmers living in Chungnam province. 6. Required credit supports for investment and operation costs of the projects should be taken actions by the government.

  • PDF