• Title/Summary/Keyword: University Performance

Search Result 69,623, Processing Time 0.081 seconds

Hi Herzberg ? : The Role of Compensation Factors and Suggestions for Performance Compensation System

  • Kim, Yoo-Gue;Yang, Woo-Ryeong;Kim, Ha-Ryong;Yang, Hoe-Chang
    • The Journal of Economics, Marketing and Management
    • /
    • v.5 no.1
    • /
    • pp.21-26
    • /
    • 2017
  • Purpose - This study extracts performance-reward factors based on the previous studies related to Herzberg's two-factor theory and performance-reward and proposes a research method to identify how these factors have an influence on task performance directly related to production performance and contextual performance that has an indirect influence. Research Design, Data, and Methodology - This study draws performance-reward factors through Focus Group Interview(FGI), classifies them into economic/uneconomic and direct/indirect factors, draws maintenance/improvement factors and unnecessary ones through IPA, and maximizes the effectiveness of performance-reward factors. Results - It also identifies how performance-reward factors have an influence on internal and external motives based on previous studies, classifies performance-reward factors into task performance and contextual performance and identifies the influence relationship between these, and proposes a research model to identify the roles of equity sensitivity based on equity theory. Conclusion - The findings from this study are expected to lay the groundwork for drawing various methods to reduce the turnover rate of employees and be important resources for reinforcing the competitiveness of businesses by classifying the performance -reward factors that may cause internal and external motives from the small and medium-sized manufacturing perspective and presenting methods to identify if these have an influence on task performance and contextual performance.

A Risk Performance Measurement System for the Construction Project

  • Seon Gyoo Kim;Jin Bong Kim;Moon Serk Young;Bong Cheol Jeon;Han Kim;Young Jeong Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1591-1598
    • /
    • 2009
  • Recently, the researches on the urban regeneration projects have been performed very actively. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

  • PDF

A Study on Performance Assessment Methods by Using Fuzzy Membership Function and Fuzzy Reasoning

  • Je, Sung-kwan;Jang, Hye-Won;Shin, Bok-Suk;Kim, Cheol-Ki;Jaehyun Cho;Kim, Kwang-Baek
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 2003.09a
    • /
    • pp.608-611
    • /
    • 2003
  • Performance assessment was introduced to improvement of self-directed learning and method of assessment for differenced learning as the seventh educational curriculum is enforced. Performance assessment is overcoming limitation about problem solving ability and higher thinking abilities assessment that is problem of a written examination and get into the spotlight by way for quality of class and school normalization. But performance assessment has problems about possibilities of assessment fault by appraisal, fairness, reliability, and validity of grading, ambiguity of grading standard, difficulty about objectivity security etc. This study proposes fuzzy performance assessment system to solve problem of the conventional performance assessment. This paper presented an objective and reliable performance assessment method through fuzzy reasoning, design fuzzy membership function and define fuzzy rule analyzing factor that influence in each sacred ground of performance assessment to account principle subject. Also, performance assessment item divides by formation estimation and subject estimation and designed membership function in proposed performance assessment method. Performance assessment result that is worked through fuzzy performance assessment system can pare down burden about appraisal's fault and provide fair and reliable assessment result through grading that have correct standard and consistency to students.

  • PDF

Performance Management System for Benchmarking in Construction Companies

  • You-Jin, Jang;Moon-Seo, Park;Hyun-Soo, Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.935-941
    • /
    • 2009
  • In competitive society, performance management is an essential element of business success. Despite the importance of performance management, it has not been widely implemented in construction companies. In the recent years, construction companies have become more aware of its need to identify, implement, and sustain performance improvements more systematically. Thus, the objective of this paper is to develop performance management system (PMS) for construction companies. The roles of performance management system is not only measuring performance but also offering guidance to improve performance. Therefore, PMS needs benchmarking process that provides Best Practice and new knowledge. This paper investigates the case of PMSs in UK, USA, Brazil, and Chile and discusses the lessons learned. To overcome the limitations of existing PMSs, new performance measurement framework, in form of 'Construction' BSC, is proposed. Based on the 'Construction' BSC, key performance indicators are derived and methodology of performance management is suggested. This paper concludes by developing PMS for benchmarking in construction companies and recommending some further directions on this research topic.

  • PDF

The Effect of Quality Circle Activities upon Quality Circle Performance and Business Performance (품질분임조 활동이 품질분임조 성과 및 기업의 경영성과에 미치는 영향)

  • Choi, Jin-Young;Lee, Sang-Chul;Kim, Kwang-Yong;Park, Sang-Chan;Suh, Yung-Ho
    • Journal of Korean Society for Quality Management
    • /
    • v.39 no.2
    • /
    • pp.188-198
    • /
    • 2011
  • The purpose of this research is to identify the effect of quality circles activities upon quality circles performance and business performance. Empirical results indicate that quality circle activities influence on quality circles performance in both individual and enterprise level, Quality circles performance influences on not employment satisfaction but customer satisfaction, business performance (profitability and market values) of companies with quality circles is higher than that of companies without quality circles. In conclusion, quality circle activities influence on quality circles performance that effect on business performance.

Optimal In-Plane Configuration of 3-axis MEMS IMUs Considering Fault Detection and Isolation Performance and Lever Arm Effect (레버암 효과와 고장 감지 및 배제 성능을 고려한 여분의 3축 MEMS IMU의 평면 배치 기법)

  • Kim, Eung Ju;Kim, Yong Hun;Choi, Min Jun;Song, Jin Woo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.12
    • /
    • pp.1648-1656
    • /
    • 2018
  • The configuration of redundant inertial sensors are very important when considering navigation performance and fault detection and isolation (FDI) performance. By constructing a redundant sensor system using multiple inertial sensors, it is possible to improve the navigation performance and fault detection and isolation performance, which are highly related to the sensor configuration and allocation. In order to deploy multiple MEMS inertial measurement units effectively, a configuration and allocation methods considering navigation performance, fault detection and isolation performance, and lever arm effect in one plane are presented, and the performance is analyzed through simulation in this research. From the results, it is confirmed that the proposed configuration and allocation method can improve navigation, FDI, and lever arm effect rejection performances more effectively by more than 70%.

A Cascaded Fuzzy Inference System for University Non-Teaching Staff Performance Appraisal

  • Neogi, Amartya;Mondal, Abhoy Chand;Mandal, Soumitra Kumar
    • Journal of Information Processing Systems
    • /
    • v.7 no.4
    • /
    • pp.595-612
    • /
    • 2011
  • Most organizations use performance appraisal system to evaluate the effectiveness and efficiency of their employees. In evaluating staff performance, performance appraisal usually involves awarding numerical values or linguistic labels to employees performance. These values and labels are used to represent each staff achievement by reasoning incorporated in the arithmetical or statistical methods. However, the staff performance appraisal may involve judgments which are based on imprecise data especially when a person (the superior) tries to interpret another person's (his/her subordinate) performance. Thus, the scores awarded by the appraiser are only approximations. From fuzzy logic perspective, the performance of the appraisee involves the measurement of his/her ability, competence and skills, which are actually fuzzy concepts that can be captured in fuzzy terms. Accordingly, fuzzy approach can be used to handle these imprecision and uncertainty information. Therefore, the performance appraisal system can be examined using Fuzzy Logic Approach, which is carried out in the study. The study utilized a Cascaded fuzzy inference system to generate the performance qualities of some University non-teaching staff that are based on specific performance appraisal criteria.

Selecting Optimum Management Practicesin Pre-construction Phase Considering Project Characteristics

  • Cha, Hee-Sung;Kim, Ki-Hyun;Ko, Young-Jin
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.1
    • /
    • pp.1-4
    • /
    • 2012
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the hardships of managing construction project in the construction industry. This research classifies and applies the improvements made by the operator's work, in order to apply factors of success on the construction project, as performance management factors. In addition, in order to predict the results reflecting the project characteristic of performance management factor un-improvable by the operator in the initial stage of construction, the effect of project characteristic to the performance was drawn by performance difficulty. Also, in order to improve the predicted performance, researches on setting valid best practices according to the performance territory through a correlation analysis between the best practices improvable through the operator's work, and the performance was made.

Results-oriented Culture, Performance Information Use and the Performance of Public Organizations: Evidence from Vietnam

  • CHAU, Thao Hong Phuong;LE, Truc Dinh;PHAM, Quynh Xuan
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.8 no.8
    • /
    • pp.541-552
    • /
    • 2021
  • The purpose of this research is to investigate the mediating role of performance information use in the relationship between result-oriented culture and organizational performance. The data were collected from chief accountants and managers working in public-sector organizations in Vietnam. The analysis was based on the 197 completed questionnaires by using Partial Least Squares Structural Equation Modeling (PLS-SEM). For the test research model and hypotheses, the supporting tool is SmartPLS 3 software. Research findings show that result-oriented culture is positively associated with organizational performance, and that performance information use is a mediating mechanism that explains how a result-oriented culture leads to higher performance in public organizations. The findings of this study suggest that the results-oriented culture, not only directly improves organizational performance, but also indirectly does so by the use of performance information. This study provides evidence for theoretical understanding of the impact of result-oriented culture on the performance of public-sector organizations through performance information use, and suggests practical implications for public organizations in applying result-oriented culture to foster using performance measurement and improve organizational performance. In order to achieve good performance, public-sector organizations need to create and spread result-oriented culture and enhance the use of performance information for decision-making.

A Strategy on Performance Assessment Information System of Building Remodeling

  • Hong, Eun Hwa;Kim, Gyu Jin;Lee, Sang Chul;Lee, Jong Sik;Jo, Jae Ho;Chun, Jae Youl
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.643-645
    • /
    • 2015
  • This study is designating the scope, in order to establish the information management system of performance assessment for remodeling buildings, to analyze the current status of performance assessment, and to identify technologies and concepts applicable to performance assessment model.

  • PDF