• 제목/요약/키워드: University Building Facility

Search Result 520, Processing Time 0.023 seconds

A Study on the Earthquake Safety Assessment of Energy Storage Facilities According to Climate Change (기후변화에 따른 에너지 저장시설 지진 안전성평가에 관한 연구)

  • Ham, Eun-Gu;Lee, Sung-Il
    • Journal of the Society of Disaster Information
    • /
    • v.17 no.2
    • /
    • pp.226-235
    • /
    • 2021
  • Purpose: The risk assessment for earthquakes was conducted in accordance with the current design standard (KBC2016) for the Coalescer facility, which is a major facility of energy storage facilities. Method: The risk assessment for earthquakes was conducted in accordance with the current design standard (KBC2016) for the Coalescer facility, which is a major facility of energy storage facilities. Result: In this study, by statically loading earthquake loads and evaluating the level of collapse prevention of special-class structures, facility managers can easily recognize and evaluate the risk level, and this analysis result can be applied to future facility risk management. Earthquake analysis was performed so that. Conclusion: As a result of analyzing the Coalescer facility according to the current design standard KBC2016, the stress ratio of the main supporting members was found to be up to 4.7%. Therefore, the members supporting Coalescer were interpreted as being safe against earthquakes with a reproducibility period of 2400 years that may occur in Korea.

The Study on the Analysis of Elemental Maintenance Costs for Educational Facilities

  • Hyun-Wook Kang;Seung-Wook Lee;Sung- Ryul Bae;Byoung-Jun Min;Moon-Sun Park;Yong-Su Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1254-1259
    • /
    • 2009
  • The purpose of this study is to analyze elemental maintenance costs for educational buildings. The adapted research method selected three school buildings in Seoul as BTL projects. On the basis of the selected case, the study suggested a model to establish a system for each parts and to estimate analyzed maintenance costs through that system. According to the analysis, the study proposed a partial maintenance costs standard and analyzed proper maintenance costs. The results of this study are as follows 1) The system is divided into 8 large-groups and 24 small-groups for the analysis elemental maintenance costs. 2) The average rations followed by analysis of partial maintenance costs of the three school buildings are as followings, the total maintenance costs are analyzed 3,992 million won and each part of average rations is exterior of building 10.9%, interior of building 41.58%, electricity & fire fighting facility 14.22%, water supply & healthy facility 11.39%, heating & water supply facility 12.93%, landscape 6.3%, civil engineering works 2.69%.

  • PDF

Symbol recognition using vectorial signature matching for building mechanical drawings

  • Cho, Chi Yon;Liu, Xuesong;Akinci, Burcu
    • Advances in Computational Design
    • /
    • v.4 no.2
    • /
    • pp.155-177
    • /
    • 2019
  • Operation and Maintenance (O&M) phase is the main contributor to the total lifecycle cost of a building. Previous studies have described that Building Information Models (BIM), if available with detailed asset information and their properties, can enable rapid troubleshooting and execution of O&M tasks by providing the required information of the facility. Despite the potential benefits, there is still rarely BIM with Mechanical, Electrical and Plumbing (MEP) assets and properties that are available for O&M. BIM is usually not in possession for existing buildings and generating BIM manually is a time-consuming process. Hence, there is a need for an automated approach that can reconstruct the MEP systems in BIM. Previous studies investigated automatic reconstruction of BIM using architectural drawings, structural drawings, or the combination with photos. But most of the previous studies are limited to reconstruct the architectural and structural components. Note that mechanical components in the building typically require more frequent maintenance than architectural or structural components. However, the building mechanical drawings are relatively more complex due to various type of symbols that are used to represent the mechanical systems. In order to address this challenge, this paper proposed a symbol recognition framework that can automatically recognize the different type of symbols in the building mechanical drawings. This study applied vector-based computer vision techniques to recognize the symbols and their properties (e.g., location, type, etc.) in two vector-based input documents: 2D drawings and the symbol description document. The framework not only enables recognizing and locating the mechanical component of interest for BIM reconstruction purpose but opens the possibility of merging the updated information into the current BIM in the future reducing the time of repeated manual creation of BIM after every renovation project.

A Ventilation Control Method of Stand-by Generating System Installed in Underground Building (빌딩지하에 설치된 자가용발전시스템의 환기제어방식에 관한 연구)

  • Hong, W.P.;Kang, B.K.
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1199-1201
    • /
    • 1999
  • This paper presents a ventilation method and control of stand-by generating system installed underground building. The regulational problem & current ststus of ventilation system inciuding the architectural construction & building service and facility are also investigated.

  • PDF

Validity Evaluation of Real Time Mobile GIS combined with PDA in University Building Facility Management (대학시설물 관리W떠 PDA기반의 실시간 Mobile GIS 도입 타당성 평가)

  • 정지훈;엄정섭
    • Spatial Information Research
    • /
    • v.11 no.1
    • /
    • pp.41-60
    • /
    • 2003
  • It is noted that the paper mapping system for University Building Facility has many limitations in terms of data maintenance, real-time GIS data acquisition, and economic efficiency. The aim of this research was to evaluate an operational potential of an on site real-time mobile GIS technique to resolve the problem faced in the university. The idea is based upon the recent trends in the field of 'Telecommunication and Information Technology' that uses a PDA (personal Digital Assistants), wireless network computing, mobile computing, etc. A real time mobile GIS approach has been adopted, in which a PDA is linked to a wireless internet and field workers record data on the computer at the site and analyse data on site. While there should be a considerable number and variety of factors associated with real-time mobile GIS quality, this research focuses on three criteria that are identified as fundamental to customer requirements; (1) data quarry (2) spatial analysis (3) real-time GIS database building. 'Art--empirical study for a case study facility has been conducted to confirm the validity for the system. The system has been checked experimentally, enabled the field users to quarry the data required simply and execute spatial analysis (buffer, overlay etc.,) accommodating versatile alternatives on the site. Detailed visual maps can be generated over large areas quickly and easily. The PDA interface, in particular, were ideally suited for field users to interactively displaying positional information with attribute data. This system has shown to be quite convenient to maintaining a highly reliable database since it could playa crucial role in documenting at real-time basis temporal and spatial changes occurred in the facilities. It is anticipated that this research output will greatly serve to introduce the reliable and cost-effective facility mapping system in the university by overcoming serious constraints suffered from the past non-real time mobile GIS approach.

  • PDF

External exposure specific analysis for radiation worker in reuse of containment building for Kori Unit 1

  • Byon, Jihyang;Park, Sangjune;Kim, Yangjin;Ahn, Seokyoung
    • Nuclear Engineering and Technology
    • /
    • v.54 no.5
    • /
    • pp.1781-1788
    • /
    • 2022
  • The containment building Kori Unit 1 may require sequential steps for full decommissioning. This study assumes that the containment building is to be used as an auxiliary building that handles nuclear power systems and materials during decommissioning before conversion into a greenfield. Through the derivation of guidelines and dose evaluation, it was confirmed whether the radiation workers were satisfied with the ALARA decision. The specific modeling of the external radiation exposure was performed based on the facility investigation procedures. The external radiation specific derived concentration guideline levels (DCGLs) for radiation workers in containment building were obtained using the RESRAD-BUILD code and were applied to the VISIPLAN 3D ALARA Planning Tool code to calculate the working dose and check worker safety. The derivation of site-specific and realistic DCGLs and dose evaluation via 3D modeling can contribute to the scenario development for the decommission and remediation of containment building.

Peak Cooling and Heating Load and Energy Simulation Study for a Special Greenhouse Facility (유리 온실 시설의 연간 냉난방 부하 및 에너지 시뮬레이션에 관한 연구)

  • Jang, Jea-Chul;Kang, Eun-Chul;Lee, Euy-Joon
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2009.04a
    • /
    • pp.72-76
    • /
    • 2009
  • A peak cooling and heating load($kW/m^2$) and annual energy($kWh/m^2{\cdot}yr$) have been simulated for a special greenhouse located near Seoul. The special facility was designed for living plant and butterfly with many visitors. The design conditions for the facility have been discussed with the designer and simulated with the weather and building conditions. The load and energy simulation was done by TRNSYS 15 based on IPMVP 4.4.2.'s simulation requirement. The results have been shown in terms of area($kW/m^2$) and volume load and energy index($kWh/m^2{\cdot}yr$). Considering the higher height of the facility, The results came out reasonably comparing the index of a typical commercial building signed as $462kWh/m^2{\cdot}yr$.

  • PDF

Integrated Information Management for Composite Object Properties in BIM (BIM 복합객체에 대한 속성정보의 통합관리)

  • Kim, Karam;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.97-105
    • /
    • 2015
  • Building information modeling (BIM)-based construction projects have increased and become more varied, and as such the management of BIM-based facility information is also increasingly important for facility maintenance. Information management, and specifically product data mapping, however, has some problems in the area of manual data entry and does not adequately consider the exchange requirements of facility maintenance. Therefore, it is necessary to introduce a method to improve the management of composite object information for BIM-based facility maintenance so that it can handle construction operation building information exchange (COBie) data for a composite object. Therefore, we present a method to map COBie data to related materials of a composite object. This research contributes to increasing the efficiency and accuracy of the required information mapping between a building model and product data using a BIM library through optimal BIM data adoption. Moreover, it allows for the creation and management of specific product data at the design development phase.

Building Control Box Attached Monitor based Color Grid Recognition Methods for User Access Authentication

  • Yoon, Sung Hoon;Lee, Kil Soo;Cha, Jae Sang;Khudaybergenov, Timur;Kim, Min Soo;Woo, Deok Gun;Kim, Jeong Uk
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.12 no.2
    • /
    • pp.1-7
    • /
    • 2020
  • The secure access the lighting, Heating, ventilation, and air conditioning (HVAC), fire safety, and security control boxes of building facilities is the primary objective of future smart buildings. This paper proposes an authorized user access to the electrical, lighting, fire safety, and security control boxes in the smart building, by using color grid coded optical camera communication (OCC) with face recognition Technologies. The existing CCTV subsystem can be used as the face recognition security subsystem for the proposed approach. At the same time a smart device attached camera can used as an OCC receiver of color grid code for user access authentication data sent by the control boxes to proceed authorization. This proposed approach allows increasing an authorization control reliability and highly secured authentication on accessing building facility infrastructure. The result of color grid code sequence received by the unauthorized person and his face identification allows getting good results in security and gaining effectiveness of accessing building facility infrastructure. The proposed concept uses the encoded user access authentication information through control box monitor and the smart device application which detect and decode the color grid coded informations combinations and then send user through the smart building network to building management system for authentication verification in combination with the facial features that gives a high protection level. The proposed concept is implemented on testbed model and experiment results verified for the secured user authentication in real-time.

Assessment of the Educational Effects through the Building Information Modeling for the Establishment of the Wartime Relocatable Military Facilities (전시 이동형 군사시설 구축을 위한 BIM의 교육효과 분석)

  • Kim, Tae-Hui;Ahn, Sung-Jin;Park, Jang-Kweon;Kim, Heung-Bin;Park, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.545-550
    • /
    • 2014
  • The re-locatable military facilities are significant in combat zones with limited infrastructures. Military tents are particularly one of the most essential components in the battlefields, During the offensive operation. This study assesses educational effectiveness of the 4D Building Information Modeling (BIM), which is used to deliver educational information with considering re-locatable military facility construction. Furthermore, the real time for constructing temporary concentration camp was measured, By using analysis of variance associated with the educational effects of the 4D BIM. Statistically, understandability of facility construction using 4D BIM was found to be higher than the conventional educational materials with field manual.