• 제목/요약/키워드: Underground railway tunnel

검색결과 132건 처리시간 0.025초

광역급행철도 터널에 고속 R-bar 적용에 관한 연구 (Study for Application of High Speed R-bar System in Metro Express Railway Tunnel)

  • 안영훈;송진호;김시구
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.409-412
    • /
    • 2011
  • Maximum speed of the train could not exceed over 160km/h with R-bar system in the underground type tunnel structure. By the research to overcome this speed limit, maximum speed has reached up to 200~250km/h recently by new R-bar system. It is under discussion to construct Metro Express Line between Gyonggido and Seoul which requires maximum speed 180km/h~230km/h. New R-bar is an optimal system to achieve the speed improvement in this line. This study shows application of the high speed R-bar system in the underground tunnel section.

  • PDF

재래식 터널 변상 조사 사례 및 안전성 평가에 관한 연구 (A study on the evaluation of tunnel safety through a series of field inspection for ASSM tunnel)

  • 박시현;맹두영;이유석;김영호
    • 한국터널지하공간학회 논문집
    • /
    • 제6권2호
    • /
    • pp.151-160
    • /
    • 2004
  • 본 연구는 국내 재래식 철도 터널에서 발생한 아치부 종방향 균열 부위에 대하여 각종 현장조사를 실시하여 터널의 변상상태를 파악한 것이다. 현장 외관조사 및 각종 비파괴 조사를 통하여 균열 부위에 대한 상세한 조사를 실시하였으며 현장조사 결과를 토대로 균열의 발생 원인을 추정하였다. 아울러 현장여건을 고려한 안전성 해석을 실시하여 터널 구조물의 균열 발생 가능성을 검토하였다.

  • PDF

TBM 철도터널 단면선정을 위한 공기역학적 특성 분석 (Analysis of aerodynamic characteristics for the selection of cross-section to the TBM railway tunnels)

  • 이호근;강현욱;김현수;김홍문
    • 한국터널지하공간학회 논문집
    • /
    • 제15권6호
    • /
    • pp.625-635
    • /
    • 2013
  • 유럽 등 해외에서는 TBM 굴착방식을 이용한 터널이 다수 건설되고 있지만, 국내에서는 거의 적용되고 있지 않다. TBM 철도터널의 적용성을 높이기 위해서는 토목적 설계요소와 공기역학적 영향을 고려한 최적단면을 선정할 필요가 있다. 이러한 최적단면의 선정시에는 터널 연장, 열차 속도, 전차선 높이, 공동규 규격 등 토목적인 설계요소에 대한 고려와 함께 공기역학적 영향을 검토하여 적정 단면 계획의 수립이 필요하다. 공기역학적 검토시에는 최근 철도터널의 고속화를 고려하고 적절한 분석기준의 수립이 필요하지만 현재 국내에서는 관련기준이 없어 터널마다 상이한 공기압 분석기준이 적용되고 있는 실정이다. 따라서 본 연구에서는 국내외 이명감 및 미기압 분석기준에 대하여 검토하고, TBM 터널단면별 공기역학적 분석을 통해서 TBM 철도터널의 단면선정시 공기역학적 영향과의 상관관계에 대해 분석하였다.

고속열차의 터널 진입시 수직갱의 압력저감효과에 대한 수치해석 연구 (A numerical study on the pressure relief by a vertical shaft in a high speed railway tunnel)

  • 김효근;서상연;하희상;권혁빈
    • 한국터널지하공간학회 논문집
    • /
    • 제15권6호
    • /
    • pp.559-570
    • /
    • 2013
  • 고속철도는 대규모의 인원과 물자를 신속하게 운반할 수 있는 친환경 운송수단으로 각광받고 있다. 고속철도는 빠른 속도로 인해 선형이 제한되어 건설되므로 산이 많은 지형에서는 터널이 많아진다. 고속으로 주행중인 열차가 터널에 진입하는 경우에 터널내부에서 압력파가 발생하는데 이로 인해 이명감과 미기압파라는 문제가 발생한다. 터널 내의 압력파를 완화시키기 위한 다양한 방법 중 수직갱을 이용한 방법도 연구되고 있는데 이 연구에서는 TTMA라는 고속철도 터널 공기역학 해석프로그램을 이용하여 수직갱에 의한 수치해석모듈을 개발하였다. 이를 검증하기 위해 실측결과와 비교하여 그 성능을 검증하였으며 기존의 수치해석결과와 비교하여 그 우수성을 검증하였다.

LTE-R의 도시철도 터널 환경 적용성 분석 (Analysis on Applicability of LTE-R in Urban Railway Tunnel Environment)

  • 곽우현;이광희;김용규;최준영
    • 전기학회논문지
    • /
    • 제64권12호
    • /
    • pp.1796-1803
    • /
    • 2015
  • Unlike commercial LTE network, LTE-R railway network is arranged along a railroad track and the base stations of the network (RUs) are also installed on the waysides. For urban railway systems that are composed of underground tunnels, the leakage coaxial cables are widely used due to the radio propagation characteristics in tunnels. In theory, the tunnel sections are interpreted as the waveguide with blank spaces and for this reason, the tunnel sections are expected to be better than open ground sections in terms of the radio propagation characteristics. In this paper, we analyze the radio propagation characteristics based on this theory by replacing the leakage coaxial cables in the network with Yagi antennas. The test has been carried out in the 2.2km tunnel in the Daebul test track of KORAIL with 2.6GHz LTE-R Network. The LTE-R applicability in urban railways has been tested through the analysis on the radio propagation characteristics with the unmanned train operation system in Daebul tunnel.

A Study on the Applicability of the Conventional TTX Propulsion System on the High-speed Propulsion System for a Deep-underground GTX

  • Park, Chan-Bae;Lee, Byung-Song;Lee, Ju
    • International Journal of Railway
    • /
    • 제3권2호
    • /
    • pp.54-59
    • /
    • 2010
  • In order to develop the deep-underground GTX (Great Train eXpress) in domestic, the running performance analysis of the propulsion system by a variety of route condition must be carried out before studying the specification and the development of the high-speed propulsion system with inverter and traction motor. Then it is necessary to study the running resistance properties of the high-speed traction system for the variety of tunnel type and vehicle organization method at first. In addition, the properties of the power requirement of the traction motors needed to maintain the balanced speed of the high-speed traction system are next studied. We need to study properties of the emergency braking distance caused by the highest operation speed of the high-speed traction system and present the fundamental design technologies to develop the high-speed traction system for the deep-underground GTX. Finally, the paper analyzes the applicability of the conventional Korean Tilting Train eXpress (TTX) propulsion system on the high-speed propulsion system for the deep-underground GTX.

  • PDF

터널내부 소음 저감을 위한 흡음제 요구성능에 관한 연구 (A Study on the Performance Requirement of Noise Absorbing Material for Railway tunnel)

  • 조준호;양신추;김형준;윤제원;김영찬
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(III)
    • /
    • pp.479-483
    • /
    • 2003
  • In general, urban railroad in Korea is constructed as a tunnel type under ground due to the various restricted conditions. Passengers in train running through underground tunnel compare to open space are exposed to severe noise environment. In this study, various performance characteristics of many candidate materials are surveyed and analyzed. And some important characteristics are tested. From this study, various performance requirement for noise reduction in railway tunnel were suggested.

  • PDF

직류 전기철도의 교류화 분석 (Change analysis with A.C of D.C electric railway)

  • 김윤식;이기승;심재석
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.151-156
    • /
    • 2008
  • The after 1974 capital region electric railroad is opened to traffic Koraill and Seoul metro adopt each other different power supply method and they operate and they are come. AC 25[kv] method voltage the insulation becomes larger standing distance highly, the case tunnel section which will introduce in the underground segment becomes on a large scale and the cost of construction increases to the city center and the underground segment adoption of DC method was many. To recent times with R-bar (Rigid-bar) introductions change of tunnel section the introduction of AC method came to be easy without in the underground segment. Operates sees in the electric protection where the Seoul metro and the Korail are different each other and, from the dead section segment the interior electric light to put out lights the passenger brings about inconveniently and the civil appeal which demands a power supply method unification occurs, within the company interchange electric railroad brazier safety improvement and maintenance expense curtailment etc. the flaw is original proposal, is a condition which finishes a feasibility study service about the power supply method fringe land. Interchange analysis of the DC electric railway it leads from the present paper and it compares under analyzing being it could be reflected to also the route which is in the process of actual using boil the strong point and a weak point of DC and AC method of the establishment route constructive at the time of and

  • PDF

서천터널 굴착 중 용출수 발생에 따른 터널 보수.보강 사례 (A case study of sudden groundwater inundation in Seocheon Tunnel)

  • 최혁;김선곤;김흥국;홍준표
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.1340-1347
    • /
    • 2006
  • During excavation in seocheon tunnel, sudden groundwater inundation occurred in complex hydro-geological environments prevailing in underground tunnel. Large volumes of groundwater flowed into tunnel at STA 54km600. The authors have provided a comprehensive background to hydro-mechanics of groundwater with a geological analysis, ground investigation, hydro- mechanical modelling etc. To reinforce tunnel, we have applied the TAS grouting and the steel multi-layer grouting, and comfirmed the effects of reinforcement.

  • PDF

문화재로 지정된 무라이닝 암반터널 하부통과 설계사례 (A Case Design of a Tunnel Passing Under an Adjacent Unlined Tunnel Designated As a Cultural property)

  • 김선홍;정동호;석진호;박명렬
    • 터널과지하공간
    • /
    • 제17권2호
    • /
    • pp.152-164
    • /
    • 2007
  • 근래 철도를 이용한 물동량과 여객의 증가로 인하여 선로용량을 증대시키고 운영철도의 고속화를 추진하면서 기존 철도노반을 개량하는 건설공사가 많이 진행되고 있다. 이와 관련하여 기존노반과 인접하여 터널공사가 진행되는 경우가 종종 있으며 경우에 따라서는 터널폭 이내로 기존시설물과 근접되어 터널이 계획되는 경우도 있다. 공용중인 터널에 근접하여 터널을 계획하는 경우에는 기존터널에 미치는 영향을 검토하고 필요시 대책을 강구하여야 한다. 설계시 주요 검토사항으로는 시공시의 발파진동으로 인한 기존터널에 미치는 영향, 근접굴착으로 인한 기존터널의 안정성 확보 여부, 운행시 열차진동에 대한 영향분석으로 구분할 수 있다. 본고에서는 기존터널의 특성을 고려하여 국내외 기준 및 문헌을 통한 허용발파진동 선정 및 굴착계획 수립, 수치해석에 의한 안정성 분석, 경험식에 의한 열차진동의 영향 분석을 수행하였다.