• Title/Summary/Keyword: Underground pipes

Search Result 213, Processing Time 0.023 seconds

Risk Of Buildings Damage Due To Subsidence During Tunnelling Under The Buildings In Sand-Gravel Layer (빌딩하부 모래자갈층에서 터널시공 중 발생한 지표침하에 의한 빌딩의 손상)

  • Kim, Cheehwan
    • Tunnel and Underground Space
    • /
    • v.25 no.4
    • /
    • pp.383-396
    • /
    • 2015
  • It is analyzed the risk of building damage due to ground surface subsidence occurred during constructing a tunnel below buildings in sand-gravel layer. The overburden and the thickness of sand-gravel layer is about 20m and the width and the height of the tunnel are 12m and 8.6m, respectively. The tunnel is pre-reinforced by umbrella method with three rows of long steel pipes and grouting. Surface subsidence is measured at 36 points surrounding buildings and measured data are used to calculate optimized three dimensional subsidence surface. Depending on the building location, deflection ratio and horizontal strain are calculated to evaluate the risk of building damage. No damage occurs at the buildings because of both the small deflection ratios involved 1~4mm subsidence and compressive horizontal strains.

New Horizontal Pre-Drainage System in Subsea Tunnelling (수평시추 방식에 의한 해저터널 시공중의 막장 수압경감)

  • Hong, Eun-Soo;Shin, Hee-Soon;Park, Chan;Kim, Hyung-Mok;Park, Eui-Seob
    • Tunnel and Underground Space
    • /
    • v.18 no.1
    • /
    • pp.10-19
    • /
    • 2008
  • Most of flooding cases in tunnels are associated with huge inrushes of water due to the fracture zone with very high water head. To find out the causes and countermeasures for flooding cases, a dozen of tunneling cases are studied. Case studies presented here show that if the flooding had been forecasted and pre-drained prior to the tunnel excavation, such accidents could have been prevented. From this observation, we suggest a new horizontal drainage system with pre-investigation and pre-drainage concept. Seepage analyses are performed to analyze the water head reduction effect on the tunnel face by drainage pipes during the construction of subsea tunnels. Drainage system analyses are performed to analyze performance of the drainage system. These analysis results show that the suggested horizontal pre-drainage system provides a clear drainage and water head reducing effect. Finally, the proposed system can be a new alternative to the present water controlling methods applied to subsea tunnels.

Study on Efficiency for Underground Heat Transfer of Metal Heat Exchanger (금속재질 열교환기의 지중 열교환 효율에 관한 연구)

  • Song, Jae-Yong;Kim, Ki-Joon;An, Sang-Gon;Kim, Jin-Sung;Jeong, Gyo-Cheol
    • The Journal of Engineering Geology
    • /
    • v.25 no.1
    • /
    • pp.131-148
    • /
    • 2015
  • The purpose of this study is to analyze and compare the heat transfer efficiency of using copper pipe, stainless pipe and traditional PE pipe commonly used for geothermal heat exchanger, with aims at seeking improved methods. In addition, the varying efficiency of heat transfer from ground heat and groundwater heat was assessed and its applicability was discussed. Design parameters for empirical field study were derived by controlling flow rate, velocity and caliber of pipes of the heat exchanger after the thermal efficiency of the heat exchanger material was evaluated. The heat exchange efficiency and effective thermal conductivity were measured with changing pattern through field thermal efficiency and thermal response test. Experimental results show that the metal material showed higher heat transfer efficiency than the PE pipe. Although the heat transfer efficiency was not high with the increase of the pipe diameter in the flow rate, it was high with the increase of the pipe diameter in the velocity.

A Study of the Optimum Installation Number of Face Bolts Using Laboratory Tests and Numerical Analysis (실내실험 및 수치해석을 이용한 막장볼트의 최적 타설 개수에 관한 연구)

  • Seo, Kyoung-Won;Kazuo, Nishimurn;Kim, Chang-Young
    • Tunnel and Underground Space
    • /
    • v.16 no.6 s.65
    • /
    • pp.467-475
    • /
    • 2006
  • The use of face bolt method has been increasing abroad recently. Hence, many tests and measurements are being conducted and reported. Also, it is well hewn that determination of the installation number of foe bolts in the design stage is very difficult due to difference of the ground condition and the type of a bolt to be used. First of all, the type, the number, etc. of bolts used in various tunnel construction sites, investigated, are analyzed. The relationship between bolt and ground condition could not be found because bolts have been used with the other support methods in many cases. In the laboratory test and numerical analysis based on the site investigation, the behavior of ground and pipes installed on the tunnel face to support has been examined. Especially, the installed number is focused on. According to the result of tests, the surface settlement and the axial displacement of the face decrease exponentially as the number of installed bolts increases.

Review of Unplanned Release at Foreign Nuclear Power Plants and Radiological Monitoring at Korean Power Plants (해외원전 비계획적 방출 및 한국의 환경감시 현황 분석)

  • Park, Soo-Chan;Ham, Baknoon;Kwon, Jang-Soon;Cho, Dong-Keun;Jeong, Jihye;Kwon, Man Jae
    • Journal of Soil and Groundwater Environment
    • /
    • v.23 no.4
    • /
    • pp.1-15
    • /
    • 2018
  • Despite of safety issues related to radiological hazards, 31 countries around the world are operating more than 450 nuclear power plants (NPPs). To operate NPPs safely, safety regulations from radiation protection organizations were developed and adopted in many countries. However, many cases of radionuclide releases at foreign NPPs have been reported. Almost all commercial NPPs routinely release radioactive materials to the surrounding environments as liquid and gas phases under control. These releases are called 'planned releases' which are planned, regularly monitored, and well documented. Meanwhile, the releases focused in this review, called 'unplanned releases', are neither planned nor monitored by regulatory and/or protection organizations. NPPs are generally composed of various structures, systems and components (SSCs) for safety. Among them, the SSCs near reactors are closely related to safety of NPPs, and typically fabricated to comply with stringent requirements. However, some non-safety related SSCs such as underground pipes may be constructed only according to commercial standards, causing the leakage of radioactive fluids usually containing tritium ($^3H$). This paper discusses SSCs of NPPs and introduces several cases of unplanned releases at foreign NPPs. The current regulation on the environmental radiological surveillance and assessment around the NPPs in South Korea are also examined.

Effect of RuCl3 Concentration on the Lifespan of Insoluble Anode for Cathodic Protection on PCCP

  • Cho, H.W.;Chang, H.Y.;Lim, B.T.;Park, H.B.;Kim, Y.S.
    • Corrosion Science and Technology
    • /
    • v.14 no.4
    • /
    • pp.177-183
    • /
    • 2015
  • Prestressed Concrete steel Cylinder Pipe (PCCP) is extensively used as seawater pipes for cooling in nuclear power plants. The internal surface of PCCP is exposed to seawater, while the external surface is in direct contact with underground soil. Therefore, materials and strategies that would reduce the corrosion of its cylindrical steel body and external steel wiring need to be employed. To prevent against the failure of PCCP, operators provided a cathodic protection to the pre-stressing wires. The efficiency of cathodic protection is governed by the anodic performance of the system. A mixed metal oxide (MMO) electrode was developed to meet criteria of low over potential and high corrosion resistance. Increasing coating cycles improved the performance of the anode, but cycling should be minimized due to high materials cost. In this work, the effects of $RuCl_3$ concentration on the electrochemical properties and lifespan of MMO anode were evaluated. With increasing concentration of $RuCl_3$, the oxygen evolution potential lowered and polarization resistance were also reduced but demonstrated an increase in passive current density and oxygen evolution current density. To improve the electrochemical properties of the MMO anode, $RuCl_3$ concentration was increased. As a result, the number of required coating cycles were reduced substantially and the MMO anode achieved an excellent lifespan of over 80 years. Thus, we concluded that the relationship between $RuCl_3$ concentration and coating cycles can be summarized as follows: No. of coating cycle = 0.48*[$RuCl_3$ concentration, $M]^{-0.97}$.

Development of Real Time Monitoring Program Using Geostatistics and GIS (GIS 및 지구통계학을 이용한 실시간 통합계측관리 프로그램 개발)

  • Han, Byung-Won;Park, Jae-Sung;Lee, Dae-Hyung;Lee, Gye-Choon;Kim, Sung-Wook
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.1046-1053
    • /
    • 2006
  • In the large scale recent reclaiming works performed within the wide spatial boundary, evaluation of long-term consolidation settlement and residual settlement of the whole construction area is sometimes made with the results of the limited ground investigation and measurement. Then the reliability of evaluation has limitations due to the spatial uncertainty. Additionally, in case of large scale deep excavation works such as urban subway construction, there are a lot of hazardous elements to threaten the safety of underground pipes or adjacent structures. Therefore it is necessary to introduce a damage prediction system of adjacent structures and others. For the more accurate analysis of monitoring information in the wide spatial boundary works and large scale urban deep excavations, it is necessary to perform statistical and spatial analysis considering the geographical spatial effect of ground and monitoring information in stead of using diagrammatization method based on a time-series data expression that is traditionally used. And also it is necessary that enormous ground information and measurement data, digital maps are accumulated in a database, and they are controlled in a integrating system. On the abovementioned point of view, we developed Geomonitor 2.0, an Internet based real time monitoring program with a new concept by adding GIS and geo-statistical analysis method to the existing real time integrated measurement system that is already developed and under useful use. The new program enables the spatial analysis and database of monitoring data and ground information, and helps the construction- related persons make a quick and accurate decision for the economical and safe construction.

  • PDF

A Study on the Durability of the Polyethylene Coatings for Underground Pipeline (매설강관용 폴리에틸렌 피복재의 내구성)

  • Ryu, Keun-chang;Lee, Seong-Min;Kho, Young-Tai;Argent, Colin
    • Journal of the Korean Institute of Gas
    • /
    • v.6 no.4 s.18
    • /
    • pp.40-46
    • /
    • 2002
  • This study has been carried out to evaluate the reliability by examining the properties related to durability of commercially available coating systems in domestic. For this purpose slow crack growth resistance and oxidative induction time tests were introduced, which have been accepted as durability parameters in polyethylene pipes with low pressure. Based upon the experimental results on these parameters, desirable minimum values are proposed for the durability enhancement of the polyethylene coatings.

  • PDF

Development of the 3-D Fracture Network Analysis and Visualization Software Modules (삼차원 불연속면 연결구조 해석 및 가시화 소프트웨어 모듈 개발)

  • Noh, Young-Hwan;Choi, Yosoon;Um, Jeong-Gi;Hwang, Sukyeon
    • Tunnel and Underground Space
    • /
    • v.23 no.4
    • /
    • pp.261-270
    • /
    • 2013
  • As part of the development of the 3-D geologic modeling software, this study addresses on new development of software modules that can perform the analysis and visualization of the fracture network system in 3-D. The developed software modules, such as BOUNDARY, DISK3D, FNTWK3D, CSECT and BDM, are coded on Microsoft Visual Studio platform using the MFC and OpenGL library supported by C++ program language. Each module plays a role in construction of analysis domain, visualization of fracture geometry in 3-D, calculation of equivalent pipes, production of cross-section map and management of borehole data, respectively. The developed software modules for analysis and visualization of the 3-D fracture network system can be used to tackle the geomechanical problems related to strength, deformability and hydraulic behaviors of the fractured rock masses. All these benefits will further enhance the economic competitiveness of the domestic software industry.

Inspection for Inner Wall Surface of Communication Conduits by Laser Projection Image Analysis (레이저 투영 영상 분석에 의한 통신 관로 내벽 검사 기법)

  • Lee Dae-Ho
    • Journal of Korea Multimedia Society
    • /
    • v.9 no.9
    • /
    • pp.1131-1138
    • /
    • 2006
  • This paper proposes a novel method for grading of underground communication conduits by laser projection image analysis. The equipment thrust into conduit consists of a laser diode, a light emitting diode and a camera, the laser diode is utilized for generating projection image onto pipe wall, the light emitting diode for lighting environment and the image of conduit is acquired by the camera. In order to segment profile region, we used a novel color difference model and multiple thresholds method. The shape of profile ring is represented as a minimum diameter and the Fourier descriptor, and then the pipe status is graded by the rule-based method. Both local and global features of the segmented ring shaped, the minimum diameter and the Fourier descriptor, are utilized, therefore injured and distorted pipes can be correctly graded. From the experimental results, the classification is measured with accuracy such that false alarms are less than 2% under the various conditions.

  • PDF