• Title/Summary/Keyword: Underground Wall Construction

Search Result 149, Processing Time 0.025 seconds

Constructability Evaluation of Seismic Mechanical Splice for Slurry Wall Joint Consisting of Steel Tube and Headed Bars (슬러리월의 내진설계를 위한 강재각관과 확대머리 철근으로 구성된 기계적 이음의 시공성 평가)

  • Park, Soon-Jeon;Kim, Dae-Young;Lim, In-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.3
    • /
    • pp.295-303
    • /
    • 2023
  • South Korea has recently witnessed an increasing number of seismic events, leading to a surge in studies focusing on seismic earth pressures, as well as the attributes of geological layers and ground where foundations are established. Consequently, earthquake-resistant design has become imperative to ensure the safety of subterranean structures. The slurry wall method, due to its superior wall rigidity, excellent water resistance, and minimal noise and vibration, is often employed in constructing high-rise buildings in urban areas. However, given the separation between panels that constitute the wall, slurry walls possess limited resistance to seismic loads in the longitudinal direction. As a solution, several studies have probed into the possibility of interconnecting slurry wall panels to augment their seismic performance. In this research, we developed and evaluated a method for linking slurry wall panels using mechanical joints, including concrete-confined steel pipes and headed bars, through mock-up tests. We also assessed the constructability of the suggested method and compared it with other analogous methods. Any challenges identified during the mock-up test were discussed to guide future research in resolving them. The results of this study aid in enhancing the seismic performance of slurry walls through the development of an interconnected panel method. Further research can build on these findings to address the identified issues and improve the efficacy and reliability of the proposed method.

Prevention of Soil Contamination from Underground Storage Facilities of Petroleum Product and Hazardous Chemical Compounds (유류 및 유해화학물질 저장시설에서의 토양오염 방지대책)

  • 배우근;홍종철;정진욱;김종호
    • Journal of Soil and Groundwater Environment
    • /
    • v.7 no.4
    • /
    • pp.40-47
    • /
    • 2002
  • The practices of the construction and management of the petroleum and hazardous chemical compound storage facilities in Korea were investigated extensively, and the problems were identified. The advanced technologies in the U.S.A were comparatively studied. Considering the effectiveness of leak prevention and applicability, the following measures were suggested. To prevent corrosion of a tank, a clad tank, an interior lining tank, or a double-wall tank were thought to be the most cost effective. For piping. use of non-metalic materials was suggested. A catchment basin seemed to be effective for preventing spills. For monitoring of leaks, constructions of more than one of detection systems, such as an automatic leak detection device. a vapor detection system, a groundwater monitoring system, or a double-wall monitoring system, were recommended.

Comparative analysis of ground settlement and tunnel displacement due to tunnel excavation considering topographic information based on GIS (GIS 기반 지형 정보를 고려한 터널 굴착에 따른 지반침하와 터널 변위 비교 분석)

  • Jae-Eun, Cho;Ye-Rim, Jung;Seong-Min, Song;Ji-Seok, Yun;Sang-Gui, Ha;Han-Kyu, Yoo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.1
    • /
    • pp.13-26
    • /
    • 2023
  • Recently, as the development of underground spaces has become active due to rapid urbanization and population density, interest in the ground behavior according to the construction of underground spaces is increasing. In large cities with high population density and many buildings, ground subsidence has a great impact on structures and there may be a risk of collapse, so the analysis of ground behavior due to underground construction is essential. Previous studies have been conducted on the subsidence pattern of the surface and the deformation of the tunnel when constructing the tunnel, but analysis has rarely been conducted by using actual topographic information. Therefore, this study analyzed the difference in ground behavior between the actual topography and the flat topography. As a result, it was confirmed that ground settlement occurs at higher elevations, such as in mountainous topography, and when the numerical analysis is performed considering topographical information, the crown settlement of the tunnel is up to about approx. It showed a difference of 10 mm, and it was found that the sensitivity was less in the case of displacement of tunnel wall compared to the crown settlement and ground settlement. The numerical analysis considering the actual GIS-based topographic information presented in this study can be used to obtain more accurate surface subsidence data to understand the behavior of the upper structure due to tunnel excavation.

Reduced model experiment to review applicability of tunnel pillar reinforcement method using prestress and steel pipe reinforcement grouting (프리스트레스 및 강관보강 그라우팅을 이용한 터널 필라부 보강공법의 적용성 검토를 위한 축소모형 실험)

  • Kim, Yeon-Deok;Lee, Soo-Jin;Lee, Pyung-Woo;Yun, Hong-Su;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.495-512
    • /
    • 2022
  • Due to the concentration of population in the city center, the aboveground structures are saturated, and the development of underground structures becomes important. In addition, it is necessary to apply the reinforcement construction method for the pillar part of the adjacent tunnel that can secure stability, economy, and workability to the site. In this study, the tunnel pillar reinforcement method using prestress and grouting was reviewed. There are various reinforcement methods that can compensate for the problems of the side tunnel, but as the tunnel pillar construction method using prestress and grouting is judged to be excellent in field applicability, stability, and economic feasibility, it is necessary to review the theoretical and numerical analysis of the actual behavior mechanism. Therefore, a scaled-down model experiment was conducted. The reduced model experiment was divided into PC stranded wire + steel pipe reinforcement grouting + prestress (Case 1), PC strand + steel pipe reinforcement grouting (Case 2), and no reinforcement (Case 3), and the displacement of the pillar and the earth pressure applied to the wall were measured. Through experiments, it was confirmed that the PC stranded wire + steel pipe reinforcement grouting + prestress method is the most excellent reinforcement method among various construction methods. It was judged that it could be derived.

A Study on the Ground Deformation by lowering of Slurry level after Trench Excavation (트렌치굴착 후 안정액 수위 저하에 의한 지반변형에 관한 연구)

  • Hong, Won-Pyo;Han, Jung-Geun;Shin, Kwan-Young;Lee, Mun-Ku
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.1455-1460
    • /
    • 2005
  • This paper presents the results of an experimental study on the ground deformation by trench excavation for Diaphragm Wall construction. The model tests are performed to investigate the back ground deformation by lowering of slurry level in trench after excavating. Through these, the deformation characteristic of the back ground due to stress release of excavated space was investigated. This study considered relative density of soil mass and the distance between trench and surcharge. An experiment was performed in order to observe the failure pattern of a slurry-supported trench excavated in sandy ground. From model tests, in order to predict reasonably the deformation behavior of the adjacent ground due to the underground excavation, it is significantly recommended that the ground settlement by trench excavation should be considered.

  • PDF

The Effect of Nail Inclination of soil Nailing Structure of vertically Faced Wall (벽체가 수직인 쏘일네일링 구조물의 네일 경사각 영향)

  • Han, Sang-Su;Baek, Yong;Kwon, O-Il;Kim, Young-Nam;Chae, Young-Su;Lee, Kang-Il
    • The Journal of Engineering Geology
    • /
    • v.18 no.3
    • /
    • pp.277-285
    • /
    • 2008
  • For the soil nailing, recently, its application is expanded, but there is no officially approved method to design it yet. Furthermore, there are a great number of design valuables in soil nailing, it is also used without clear data under the situation that uncompleted detailed research on the sensibility between design variables. Especially, there has no deal with the installation angle of the nail - the major contents in this study. Therefore, this study based on the theoretical estimation analyzed safety rate about the angle of the nail, unit weight, adhesive force, internal friction angle and tensile farce worked on nail in the case of the rear of pond side is both horizontal and perpendicular. As a result, it could be verified that the safety rate increased on every cases in the situation of the nail installation angle was in upward direction than in downward direction.

Development of 3-D Flow Model for Porous Media with Scenario-based Ground Excavation (지반굴착 시나리오 기반의 다공성 매질에 대한 3차원 유동해석모델 구축)

  • Cha, Jang-Hwan;Lee, Jae-Young;Kim, Woo-Seok
    • Journal of Korean Society of Disaster and Security
    • /
    • v.10 no.1
    • /
    • pp.19-27
    • /
    • 2017
  • In recent years, ground subsidence has been frequently occurred by underground cavities due to the excessive groundwater inflow, caused by poor construction and management, during tunnel excavation and underground structure construction. In this study, a numerical model (SEEFLOW3D) was developed to estimate groundwater fluctuations for saturated-unsaturated poros media, evaluates the impact on ground excavation with open cut and non-open cut scenarios. In addition, the visual MODFLOW was applied to demonstrate the verification of the model compared with both results. Our results indicated that the RMSE and NRMSE was obtained to range over -3.95~5.7% and 0.56~4.62%, respectively. The developed model was expected to estimate groundwater discharges and apply analysis tool for optimum design of waterproof wall in future.

A Study on the Construction Method for the Thermal Crack Control of Underground Box Structure (지하박스구조물 온도균열제어를 위한 시공방안연구)

  • 오병환;유성원;김의성;전세진
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1998.04a
    • /
    • pp.205-210
    • /
    • 1998
  • The strength and dimension of recent constructed subway box structures are increased considerably. These increases are resulting in much initial cracks by hydration heat and thermal stress. According to previous studies, decrease of cement amount by using superplasticizer and L/H value is the best way to eliminate hydration heat and stress. The analyses using finite element model were performed. By the result of analysis, the use of superplasticizer and the decrease of the change of longitudinal placing length are proved to be more effective for elimination thermal cracks. By ACI Code, for longitudinal placing length 25 m, the amount of wall temperature reinforcement is always lack despite of concrete mix proportion. With analytical result and the inducing crack joint, the in-site test were performed and the analytical results proved to be effective. However, the inducing crack joint is not effective if it is a small size.

  • PDF

Application of numerical simulation for the analysis and interpretation of pile-anchor system failure

  • Saleem, Masood
    • Geomechanics and Engineering
    • /
    • v.9 no.6
    • /
    • pp.689-707
    • /
    • 2015
  • Progressive increase in population causing land scarcity, which is forcing construction industry to build multistory buildings having underground basements. Normally, basements are constructed for parking facility. This research work evaluates important factors which have caused the collapse of pile-anchor system at under construction five star hotel. 21 m deep excavation is carried out, to have five basements, after installation of 600 mm diameter cast in-situ contiguous concrete piles at plot periphery. To retain piles and backfill, soil anchors are installed as pit excavation is proceeded. Before collapse, anchors are designed by federal highway administration procedure and four anchor rows are installed with three strands per anchor in first row and four in remaining. However, after collapse, system is modeled and analyzed in plaxis using mohr-coulomb method. It is investigated that in-appropriate evaluation of soil properties, additional surcharge loads, lesser number of strands per anchor, shorter grouted body length and shorter pile embedment depth caused large deformations to occur which governed the collapse of east side pile wall. To resume work, old anchors are assumed to be standing at one factor of safety and then system is analyzed using finite element approach. Finally, it is concluded to use four strands per anchor in first new row and five strands in remaining three with increase in grouted and un-grouted body lengths.

Analysis of the Restoration Actual Conditions on the Quarries (토석채취지의 복구 실태 분석)

  • Park, Jae-Hyeon;Park, Chong-Min;Lee, Joon-Woo
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.13 no.3
    • /
    • pp.128-142
    • /
    • 2010
  • This study examined the actual conditions of quarries. aiming to offer preliminary data to help with restoration efforts of quarries after extracting rock material. The results are as follows. As for the current state of business, a classification of all sites surveyed showed the ratio of ceased operations: ongoing operations: quarries under restoration to be 58:5:37. Classified by the permit area, the ratio of the number of quarries with areas less than $20,000m^2$ (2ha) : between $20,000m^2$ (2ha) and $50,000m^2$ (5ha) : $50,000m^2$ (5ha) or more was 15:60:25. The classification by use of the rocks showed the ratio of construction aggregate (such as civil construction material) : building material : craft material to be 60:28:12. The ratio of quarrying methods of bench cut : slope quarry : vertical quarry wall is 40:18:42. It is indicated that 85% of all quarries surveyed are difficult to reclaim while 15% seem to be easier to restore. Among all surveyed, 34 sites were considered to be extremely difficult to restore. 17 of the 34 sites (50%) were quarry walls almost vertical that have been neglected after extraction. 16 of them (47%) were underground quarries that have left quarry walls deep under the ground. For the remaining 1 site, there doesn't seem to be any need for reclamation as it became totally flat after the extraction.