Reduced model experiment to review applicability of tunnel pillar reinforcement method using prestress and steel pipe reinforcement grouting |
Kim, Yeon-Deok
(Technology Research institute, Yookwang Construction)
Lee, Soo-Jin (Dept. of Civil Engineering, Hoseo University) Lee, Pyung-Woo (Sungwoosamyeon Co., Ltd.) Yun, Hong-Su (Institute of Technology Industry Co., Ltd.) Kim, Sang-Hwan (Dept. of Civil Engineering, Hoseo University) |
1 | Hoek, E., Brown, E.T. (1980), Underground Excavations in Rock, London Institution of Mining and Metallurgy, London, 527p. |
2 | Kim, J.H. (2017), A numerical analysis for the stability evaluation of parallel tunnels, Master's Thesis, Cheongju University, pp. 3-52. |
3 | Seo, K.W., Kim, W.K., Kim, Y.H., Park, D.J. (2016), "Economic analysis of high pressure injection method in slope reinforcement", Proceedings of the KSCE 2016 Convention Program, Jeju, pp. 87-88. |
4 | Sin, H., Jung, H., Lee, Y., Kim, N.Y., Ko, S. (2021), "Mechanism of steel pipe reinforcement grouting based on tunnel field measurement results", Journal of Korean Tunnelling and Underground Space Association, Vol. 23, No. 3, pp. 133-149. DOI |
5 | Nam, S.S. (1999), "Problems and countermeasures of domestic tunnel measurement management", Magazine of Korean Tunnelling and Underground Space Association, Vol. 1, No. 1, pp. 98-103. |
6 | Sin, J.H., Choi, M.G., Choi, G.C. (2009), "Analysis of characteristics of civil complaints and countermeasures against the development of underground spaces in downtown areas", Magazine of Korean Tunnelling and Underground Space Association, Vol. 11, No. 1, pp. 52-59. |