• Title/Summary/Keyword: Underground Pipe

Search Result 360, Processing Time 0.021 seconds

Characteristics Analysis of the Heat Exchange Rate according to Soil Temperature and Grout Material using Numerical Simulation

  • Oh, Jin Hwan;Nam, Yu Jin
    • KIEAE Journal
    • /
    • v.14 no.2
    • /
    • pp.29-36
    • /
    • 2014
  • The ground source heat pump (GSHP) system has attracted much of attention, because of its stability of heat production and the high efficiency of the system. Performance of the heat exchanger is dependent on the soil temperature, the ground thermal conductivity, the operation schedule, the pipe placement and the design temperature. However, in spite of the many variables of these systems, there have been few research on the effect of the systems on system performance. In this study, analysis of the heat exchange rate according to soil temperature and grout material was conducted by numerical simulation. Furthermore, the heat distribution around the ground heat exchanger was presented on the different conditions of grout and underground temperature by the simulation.

The Study about Control Monitoring of Fiber Optic Sensor on Vacuum Pipeline for Waste Collecting System (광섬유센서를 이용한 쓰레기수송관로 유지관리 모니터링에 대한 연구)

  • Lee, Joon-Young;Kim, Chae-Suk;Kim, Bong-Gyu
    • The KSFM Journal of Fluid Machinery
    • /
    • v.13 no.2
    • /
    • pp.54-58
    • /
    • 2010
  • The most recent, Vacuum Pipeline for Waste Collecting System, to collect MSW(Municipal Solid Waste) efficiently, is used environmental preservative, to emit less air pollution, in New City. However, it is difficult to monitor broken pipe and filled mass of Waste, because Vacuum Pipeline is laid underground. Therefore, FBG, optical fiber sensor, is used to inspect the temperature change and longitudinal strain to take proper action for unusual situation. I have need to accumlate sensor data of district control. I hope to be used Vacuum Pipeline more than 30 years in New City.

Development of unit for cutting of projecting parts connects with interior parts of drainpipe (하수관로 연결 돌출부 절단기 유닛 개발)

  • 김재열;김영석;안재신;곽이구;송경석;이창선
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 2003.04a
    • /
    • pp.143-148
    • /
    • 2003
  • The issue with the drainpipe now a day is that they are laid underground. Causing us to perform additional work to repair, such as digging up the ground and peeling off the insulator that surrounds the pipe. And such series works are difficult that concession appears from government and municipal office. However, if we can save time and money. Performance of piping robot that we are studied in existing session through fixing unit and improvement of cutting byte shorten and wished to heighten work efficiency. This is why we are trying to develop a unit that can cut up the projecting parts which connects with the interior part of the drainpipes.

  • PDF

Numerical analysis results of the cathodic protection for the underground steel pipe by anode installation method

  • Jeong, Jin-A;Choo, Yeon-Gil;Jin, Chung-Kuk;Park, Kyeong-Wan
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.38 no.10
    • /
    • pp.1212-1216
    • /
    • 2014
  • This study aims to find out the best anode location for buried pipelines. Numerical simulation program known as CATPRO (Elsyca, Belgium) were used for confirming the best location of anodes and the effects of impressed current cathodic protection system. Applied conditions for numerical simulation were similar to on-site environmental conditions for optimal application of cathodic protection system. Used criterion of cathodic protection was NACE SP 0169, which describes that minimum requirement for cathodic protection is -850mV vs. CSE. Various layouts for anodes' installation were applied, which were distance between anodes, anode installation location, and applied current. The areas where cathodic protection potential was lower than -850mV vs. CSE was limited up to 50m from anode installation locations. It was founded numerical analysis obtain cost-effective and efficient cathodic protection methods before design and application the impressed cathodic protection system to on-site environment.

Numerical analysis of the vertical tube-in-tube ground coil heat exchanger (수직으로 매설된 이중관형 지중 열교환기에 대한 해석적인 연구)

  • 유지오;금성민;신현준
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.11 no.3
    • /
    • pp.339-348
    • /
    • 1999
  • A computer model was developed in order to predict the temperature distribution and the performance of the vertical tube-in-tube ground coil heat exchanger. This model has been validated by experimental results conducted by ORNL. The heat exchanger performance with the variation of the length is calculated and compared. As results, the heat exchanger performance is proportional to the length but the performance per unit length decreases. The minimum performance of 70m - PVC heat exchanger during cyclic operation for a week is obtained 20,054kJ/h for cooling operation and 13,915kJ/h for heating operation. And minimum temperature difference is $4.64^{\circ}C$ for cooling operation and $2.64^{\circ}C$ for heating operation. In each case, it is noted that the temperature difference between the pipe and the far-field occurs within 0.8m from the heat exchanger.

  • PDF

A CASE STUDY OF GROUND CAVE-IN DUE TO SUBSURFACE EROSION IN OLD LAND FILL

  • Kuwano, Reiko;Kohata, Yukihiro
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09c
    • /
    • pp.113-116
    • /
    • 2010
  • Ground cave-in is usually initiated by the formation of cavity within the ground due to soil loss. When the location of the cavity is deep in the ground, the detection of the cavity is not easy. Then it is possible that the hidden cavity expands for a long time to eventually cause sudden large-scale collapse. A case of large scale ground collapse in the old fill ground was studied and described in this paper. The underground cavity appeared to be caused by subsurface erosion deep in the ground and to expand/extend upward till it was ended by the catastrophic ground failure. It highlighted the importance of proper drainage work in a large scale land fill.

  • PDF

An Analysis on Development and Application of Solar Sunlighting Systems (첨단 태양광채광시스템의 개발현황 및 활용실태 분석에 관한 연구)

  • Kim, Jeong-Tai;Hwang, Min-Ku;Han, Bong-Soo
    • KIEAE Journal
    • /
    • v.2 no.1
    • /
    • pp.63-68
    • /
    • 2002
  • Solar sunlighting systems are useful to apply for most buildings. This study aims to analysis the development and architectural application of solar sunlighting systems. For the purpose, abroad developing situation of solar sunlighting systems were investigated and analyzed literally. And, by case studies, architectural application methods are analyzed. As results, light pipe systems are mainly used for small building and houses. Also solar mirror systems are used for atrium and underground spaces. Lens-fiber systems are applied for high rise buildings and office buildings which internally have no influx of sunlighting. Some application suggestion in our country are discussed.

Construction Method for Forming Concrete Shear Keys at Vertical Construction Joints of Slurry Walls (지하연속벽 수직시공이음부에 콘크리트 전단키를 형성하는 시공기술)

  • Lee, Jeong-Young;Kim, Seung-Weon;Kim, Doo-Kie
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.401-402
    • /
    • 2023
  • The shear connection of the vertical construction joint of a slurry wall by the concrete shear key has excellent structural performance and is economical and eco-friendly. However, technology for forming concrete shear keys in the underground is still underdeveloped. This paper proposes the development of the construction technology required to form a concrete shear key at the vertical construction joint of the slurry wall.

  • PDF

Analysis on the Effects of Flood Damage Mitigation according to Installation of Underground Storage Facility (지하저류조 설치에 따른 침수피해 저감효과 분석)

  • Kim, Young Joo;Han, Kun Yeun;Cho, Wan Hee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.1B
    • /
    • pp.41-51
    • /
    • 2010
  • In this study, runoff simulation was carried out in the area of Bisan 7-dong, Seo-gu, Daegu as drainage basin and the effects of the installation of underground storage facilities were analyzed during heavy rainfall. SWMM model was used for the runoff and pipe network analysis on Typhoon Maemi, 2003. 2-D inundation analysis model based on diffusion wave was employed for inundation analysis and to verify computed inundation areas with observed inundation trace map. The simulation results agree with observed in terms of inundation area and depth. Also, the effects of flood damage mitigation were analyzed through the overflow discharge and 2-D inundation analysis, depending upon whether the underground storage facility is installed or not. When the underground storage facility ($W:120m{\times}L:180m{\times}H:1.7m$) is installed, volume of overflow could be reduced by 72% and flooding area could be reduced by 40.1%. When the underground storage facility ($W:120m{\times}L:180 m{\times}H:2.0m$) is installed, volume of overflow could be reduced by 84.8% and flooding area could be reduced by 50.6%. When the underground storage facility ($W:120m{\times}L:180m{\times}H:2.2m$) is installed, volume of overflow could be reduced by 94% and flooding area could be reduced by 91.2%. There is no overflow of manhole, when the height of storage facility is 2.5 m. It is expected that the study results presented through quantitative analysis on the effects of underground facilities can be used as base data for socially and economically effective installation of underground facilities to prevent flood damage.

Properties of Permeable Block using Artificial Permeable Pipe and Polymer Powder VAE to Improve Permeability (투수성을 개선시키기 위해 인공투수관 및 분말형 폴리머 VAE를 사용한 투수블록의 특성)

  • Yoo, Beong-Young;Lee, Won-Gyu;Pyeon, Su-Jeong;Kim, Dea-Yeon;Lee, Sang-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.5
    • /
    • pp.447-453
    • /
    • 2018
  • Since 1960, Korea the town center was developed intensively due to rapid industrial development. As a result of the development, the population was concentrated in urban areas and the green area was decreased. Due to the decrease of the green area, the circulation system of the rainwater was changed, hence the rainwater was not introduced into the groundwater., On the other hand, the water on the surface of the road was changed into the water for flowing to the river and evaporation. The changes in the water flow cause many problems, and the depletion of the groundwater does not create an environment in which microorganisms and plants can live. in Korea, permeable pavement construction is increased to solve these problems, but existing pavement blocks have many problems. The pores of the permeable block are clogged due to the accumulation of dust or whitening phenomenon, and the permeability is lost. In this study, the solution of the problems of existing permeable block were suggested by using polymer and artificial permeable pipe, and strength, permeability and service life are increased, The relationship between the substitution rate of the polymer and the mixing ratio of the artificial permeable pipe was analyzed.