• Title/Summary/Keyword: Underground Cable Lines

Search Result 73, Processing Time 0.024 seconds

A Study on Overvoltage Reduction Method of Single Point Bonded Section on Combined Transmission Lines (혼합송전선로 편단접지 구간 과전압 저감 방안에 관한 연구)

  • Jung, Chae-Kyun;Kang, Ji-Won;Park, Hung-Sok;Kim, Jin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.10
    • /
    • pp.1881-1887
    • /
    • 2009
  • This paper discusses the effects of ECC (Earth Continuity Conductor) for reducing the level of induced sheath overvoltages at the single point bonded section of combined transmission lines which are mixed underground power cable with overhead line in one T/L. In previous papers, the characteristics of ECC on only underground power cable systems were sufficiently analyzed. However, the result of only underground power cable systems are totally different from that of combined transmission lines because ECC is commonly grounded with overhead grounding wire at mesh of cable head. Therefore, in this paper, the installation effects of ECC have been variously analyzed considering the three kinds of fault positions, cable formation of duct and trefoil, spacing between phase conductor and ECC, and the change of overhead transmission line section length on 154kV combined transmission line. Finally, simulation results show that ECC can effectively reduce the induced sheath voltage.

The Cause of CCPU's failure and Improved Configuration Method in Combined Transmission Lines (실 계통의 혼합송전선로에서 CCPU파괴 원인과 그 대책)

  • Ha, C.W.;Kim, J.N.;Lee, S.K.;Heo, H.D.
    • Proceedings of the KIEE Conference
    • /
    • 2001.11b
    • /
    • pp.210-212
    • /
    • 2001
  • The protection of underground cables against transient overvoltages resulting from lightning and other causes is important in cable-tine which is connected with overhead line and underground cable. This paper investigates the failure of CCPU(Cable covering Protection Unit) and presents improved configuration method of CCPU in underground cable system EMTP(Electromagnetic Transient Program) is used in order to study the overvoltages and modeling of components of the system such as overhead lines, underground cables, CCPUs and towers in presented.

  • PDF

A Study on the Lightning Overvoltage Analysis and Lightning Surge Protection Methods in 22.9kV Underground Distribution Systems (22.9kV 지중계통의 뇌과전압 해석 및 뇌서지 보호방안에 관한 연구)

  • 김상국;정채균;이종범;박왈서
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.8
    • /
    • pp.454-460
    • /
    • 2004
  • The effects of surge arresters for protection of transmission systems against direct lightning strokes have already been reviewed using Electromagnetic Transients Program(EMTP). Distribution lines are spanned in much larger area than transmission lines, and therefore, are more susceptible to lightning strokes. We have modelled the 22.9kV underground distribution cable systems that have arresters and grounding wires. And this paper analyzes the overvoltages on underground distribution cable systems when direct lightning strokes strike on the overhead grounding wire using EMTP. Then we investigated that (1) the effects of lightning stroke according to underground distribution cable length (2) voltages at the riser pole and at the cable terminal according to installation of arrester. This study will provide insulation coordination methods for reasonable systems design in 22.9kV underground distribution cable systems.

Surveillance System For Underground Power Transmission Lines (초고압 지중선로 감시시스템 연구)

  • Hahn, K.M.;Lee, K.C.;Kim, C.S.
    • Proceedings of the KIEE Conference
    • /
    • 1993.07b
    • /
    • pp.618-620
    • /
    • 1993
  • This system using optical fiber provides various information about underground tunnel and power transmission lines-atmospheric temperature, humidity, oil pressure, flammable gas, cable behavior, and so on. To transmit various data and to keep reliability, optical MUXs are adopted. User can easily operate monitoring software by using GUI.

  • PDF

The Research into Connecting System for Aerial Bundled Cable in Distribution Line (ABC 배전 접속 시스템에 대한 연구)

  • 이용순;최경선;주종민;이철호
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2001.07a
    • /
    • pp.495-498
    • /
    • 2001
  • The distribution line through which electricity is supplied from substation to customer generally varies by underground line and overhead line. In contrast that the underground line is shielded, the overhead lines do not have the shield layer. To overcome this weak point of the overhead lines, the aerial bundled cable(ABC) connection systems have been developed. The basic concept of the ABC connection system is the application of the underground cable system containing complete shield layer to the overhead cable system. The ABC system is the innovative technologies which enable the prevention of electric shocks, reduction of the maintenance charge and damage of the cable. This paper give a full detail of vertical connection system applied within a country.

  • PDF

A Study on the Sequence Impedance Modeling of Underground Transmission Systems (지중송전선로의 대칭분 임피던스 모델링에 관한 연구)

  • Hwang, Young-Rok;Kim, Kyung-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.6
    • /
    • pp.60-67
    • /
    • 2014
  • Power system fault analysis is commonly based on well-known symmetrical component method, which describes power system elements by positive, negative and zero sequence impedance. The majority of fault in transmission lines is unbalanced fault, such as line-to-ground faults, so that both positive and zero sequence impedance is required for fault analysis. When unbalanced fault occurs, zero sequence current flows through earth and ground wires in overhead transmission systems and through cable sheaths and earth in underground transmission systems. Since zero sequence current distribution between cable sheath and earth is dependent on both sheath bondings and grounding configurations, care must be taken to calculate zero sequence impedance of underground cable transmission lines. In this paper, EMTP-based sequence impedance calculation method was described and applied to 345kV cable transmission systems. Calculation results showed that detailed circuit analysis is desirable to avoid possible errors of sequence impedance calculation resulted from various configuration of cable sheath bonding and grounding in underground cable transmission systems.

Application of Supervisory System in Extra High Voltage Cable (초고압 케이블의 송전 감시 시스템 소개 및 기술동향)

  • Kwon, Byung-Il;Nam, Jeong-Se;Kang, Deok-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 1997.07e
    • /
    • pp.1791-1793
    • /
    • 1997
  • Since Korea was initiated a industrialization, many transmission lines have been installed to meet the increasing demand for the electric power. In large city, underground transmission lines were widely installed because of the environmental issue. But there have been appeared many failures on the lines, such as the external scar of cable, a fire in the culvert, overheating of cable, and so on. There have been many studies to monitor them and improve the reliability of the power supply. As a method monitoring the lines, a DTS(Distributed Temperature Sensor) system is developed and applied. This system monitors the lines and predicts the failures, using a optical fiber sensor. This paper describes this DTS system and its application for the underground transmission lines.

  • PDF

Reduction Methods of Sheath Circulating Current in Underground Cable (지중 송전선로에서 시스 순환전류 저감 방안)

  • Ha, C.W.;Kim, J.N.;Lee, S.K.;Kim, D.W.;Park, W.K.
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.175-177
    • /
    • 2002
  • The use of underground transmission cables has increased continuously in densely inhabited urban and suburban for power transmission. Two or more transmission lines are outgoing from one substation in many cases, and one line comprises twin circuits. In order to meet the increasing do and for electric power, underground tables of two or fore circuits are installed in ducts in parallel for several kilometer in the same route. It, however, has not been known generally that the sheath circulating current is generated in a system where a large number of cables are laid on the same route. Therefore, this paper describes an improved analysis method for sheath circulating current on underground transmission cables using EMTP. Author propose several methods to reduce sheath circulating current. The analysing method and reduction methods for two or more underground cables will be really improved for cable system utility.

  • PDF

Characteristic Analysis of Power Optical Fiber Composite Cable System on Underground Transmission Lines (지중송전선로 광 복합 전력케이블 시스템 특성분석)

  • Jung, Chae-Kyun;Park, Hung-Sok;Jang, Tai-In;Kang, Ji-Won;Kim, Jong-Chae;Lee, Dong-Il
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.531-532
    • /
    • 2011
  • This paper describes the characteristics analysis of power-optical fiber composite cable on underground transmission lines. The effects on grounding, air gap and contact resistance are variously analysed using EMTP in normal operating condition. From these results, in this paper, the scheme for protecting the electrically abnormal phenomena will be established on power-optical fiber composite cable of underground transmission lines.

  • PDF

A Study on the Remain Life with Aging in 22kV CV cable (22kV 전력케이블의 열화 판정에 관한 연구)

  • Lee, Kwan-Woo;Mok, Young-Soo;Kim, Bo-Kyeong;Park, Bok-Ki;Park, Dae-Hee
    • Proceedings of the KIEE Conference
    • /
    • 2003.10a
    • /
    • pp.19-21
    • /
    • 2003
  • In this paper, we studied on life-decision of underground cable of live-lines state. As all equipments have been wear, underground cables decided design-life on the whole 30 years because underground cable have been occurred aging as time goes. CV cable has been become about 30 years after installation in the South Korea, is come to a important point of time with estimation about life. Study target cable is 22 kV CV cables in this point of view and installation cable is about 10 years before and behind. Measurement method used dc leakage method of live-lines state that applied voltage of 50V in neutral point and data is analyzing result that is measured during 5 years. In this result, insulation resistance could confirm that change according to season and cause is effect of humidity, seasons and load current. Also, according as data is gone aging, insulation resistance by Weibull distribution could confirm functionally its decrease. As a result, the aging speed of cable that water tree is gone could confirm fastness very. Numerical analysis result, cable that water tree is not gone could confirm that life of cable that has passed 10 years remains about $10{\sim}20$ years.

  • PDF