A Study on Overvoltage Reduction Method of Single Point Bonded Section on Combined Transmission Lines |
Jung, Chae-Kyun
(한전 전력연구원)
Kang, Ji-Won (한전 전력연구원) Park, Hung-Sok (한전 전력연구원) Kim, Jin (한전 전력연구원) |
1 | J. W. Kang, C. K. Jung, K. K. Choi, T. I. Jang, H. H. Yoon, 'A Study on Transient Analysis by Installation of Earth Continuity Conductor on Underground Power Cable Systems', 2008 ICEE Conference, July 2008 |
2 | 강지원, 정채균, 박흥석, 장태인, 윤형희, '혼합송전계통에서 고장구간에 따른 병행지선 설치효과 검토', 대한전기학회 전력기술부문회 추계학술대회 논문집, 2008. 11 |
3 | CIGRE WG B1.18, 'Special Bonding of High Voltage Power Cables', Oct. 2005 |
4 | 한국전력공사, '지중송전 설계기준(DS-6240) 케이블 접속', 1987. 8 |
5 | C. K. Jung, J. W. Kang, 'Characteristics of Parallel Ground Continuity Conductor for Single Point Bonded Power Cable System', Submitting to IJEEPS (International Journal of Emerging Electric Power Systems) |
6 | IEEE, 'IEEE Guide for the Application of Sheath Bonding Methods for Single-conductor Cables and Calculation of induced Voltage and Current in Cable Sheaths', ANSI/IEEE Std. 575-1998 |
7 | 정채균, 강지원, '지중송전선로 병행지선 최적 설치 방안에 관한 연구', 대한전기학회 논문지, Vol. 58, No.9, 2009. 9 과학기술학회마을 |
8 | 강지원, 정채균, 윤형희, 윤종건, 김두진, 김재승, '지중송전계통 병행 지선 설치 방안 검토', 대한전기학회 하계학술대회 논문집, 2008. 7 |
9 | IEC 60364-5-54, 'Electrical installations of buildings - Part 5-54 : Selection and erection of electrical equipment Earthing arrangements, protective conductors and protective bonding conductors', June 2002 |
10 | 한국전력공사 송변전건설처, '지중송전 케이블 시스템', 2002. 12 |