• Title/Summary/Keyword: Underground Cable

Search Result 470, Processing Time 0.025 seconds

Design of Fault Location System for High Voltage Underground Power Cable (지중송전선 고장점 탐색 장치 설계)

  • Lee, Jae-Duck;Ryoo, Hee-Suk;Choi, Sang-Bong;Nam, Kee-Young;Jeong, Seong-Hwan;Kim, Dae-Kyeong
    • Proceedings of the KIEE Conference
    • /
    • 2006.10c
    • /
    • pp.603-605
    • /
    • 2006
  • To reduce inference of any power delivery failures in underground power cable, power system operators are trying to find effective way of finding fault location as soon as possible. But it is very difficult to find fault location exactly for underground power cable. We are developing fault location system for underground power cable which can detect its fault location exactly. This new system monitors current and voltage of underground power cable by using low voltage and current sensors and if there are any accidents, it records its transient signal. Fault location is calculated by analyzing recorded signal. To develop fault location system for power cable, we needed fault simulation system and we installed it physically and tested. In this rapers, we describe on describe of fault location system for underground power cable.

  • PDF

Application of Protecting Methods for Single Point Bonding on Underground Transmission Cable (지중 송전 케이블의 편단접지 시스템에서의 계통 보호 방안)

  • Ha, C.W.;Kim, J.N.;Lee, I.H.;Kim, J.C.;Lee, K.Y.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.15-17
    • /
    • 2005
  • The protection of underground cables against transient overvoltages resulting from lightning and other causes is important in cable-line which is connected with overhead line and underground cable. This paper investigates the failure of SVL(Sheath Voltage Limiter) and presents the application of protection methods for single point bonding on underground transmission cable system. EMTP(Electromagnetic Transient Program) is used in order to study the overvoltages and modeling of components of the system such as, underground cables, SVLs and towers.

  • PDF

A Study on the development of optical fiber incorporated high-voltage underground power cable (광복합 고압지중전력케이블의 개발에 관한 연구)

  • Ryu, Jae-Kyu;Yoo, Sung-Jong;Jeon, Seung-Ik;Choi, Bong-Nam;Lee, Young-Ik
    • Proceedings of the KIEE Conference
    • /
    • 1996.07c
    • /
    • pp.1828-1830
    • /
    • 1996
  • In this study, We developed the optical fiber incorporated high-voltage underground power cable which is combined optical fibers with conventional high-voltage underground power cable. Optical-Unit that optical fiber is inserted in stainless tube is tested, and we got good results enough to safe optical fibers. Also we put the optical fiber incorporated high-voltage underground power cable to the test of electrical characteristics and optical characteristics, we knew that the electrical characteristics were the same characteristics as conventional high-voltage underground power cable and the transmission loss change was almost zero.

  • PDF

Reduction Methods of Sheath Circulating Current in Underground Cable (지중 송전선로에서 시스 순환전류 저감 방안)

  • Ha, C.W.;Kim, J.N.;Lee, S.K.;Kim, D.W.;Park, W.K.
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.175-177
    • /
    • 2002
  • The use of underground transmission cables has increased continuously in densely inhabited urban and suburban for power transmission. Two or more transmission lines are outgoing from one substation in many cases, and one line comprises twin circuits. In order to meet the increasing do and for electric power, underground tables of two or fore circuits are installed in ducts in parallel for several kilometer in the same route. It, however, has not been known generally that the sheath circulating current is generated in a system where a large number of cables are laid on the same route. Therefore, this paper describes an improved analysis method for sheath circulating current on underground transmission cables using EMTP. Author propose several methods to reduce sheath circulating current. The analysing method and reduction methods for two or more underground cables will be really improved for cable system utility.

  • PDF

A Study on the Introduction of Superconducting Cable in Korean Power System (초전도 케이블 계통 적용을 위한 계통 구성 방안 및 적용 대상 고찰)

  • 김종율;윤재영;이승렬
    • Progress in Superconductivity and Cryogenics
    • /
    • v.5 no.2
    • /
    • pp.8-15
    • /
    • 2003
  • Nowadays, As power demand increases gradually, the call for underground transmission system increases. But it is very difficult and high in cost to construct new ducts and/or tunnels for power cables in metropolitan areas. HTS cable has the several useful characteristics such as increased power density, stronger magnetic fields and/or reduced losses. Therefore HTS cable can allow more power to be moved in existing ducts, which means very large economical and environmental benefits. In this paper, we investigate the status of korean power system and underground transmission system. Based on this, the feasibility study on applying HTS cable to korean power system is carried out and then we propose the new power system configuration of metropolitan area with HTS cable. Finally, we can get a conclusion that applying HTS cable to 154kV underground transmission line in metropolitan area such as seoul is very available. In addition, detail applicable cases are investigated; a)replace old conventional cable with HTS cable; b) apply HTS cable to constructing new underground transmission line; c)use HTS cable to resolve overload problem in conventional power system configuration.

The line impedance calculation and measurement of the underground transmission cable (지중 송전 케이블 선로임피던스 계산 및 실측)

  • Kim, Nam-Yul;Kim, Joung-Yun;Heo, Hoi-Deok;Lee, Su-Kil
    • Proceedings of the KIEE Conference
    • /
    • 2006.11a
    • /
    • pp.405-407
    • /
    • 2006
  • The power system analysis based on the accurate impedance of the individual underground cable, which is the inter connected to a large power system, is required. A study on calculation method of impedance allowable current for underground cables. furthermore, various methods of bonding and earthing the sheath have been used for the purpose of eliminating or reducing the sheath losses. the effectes of bonding and earthing must be includied in impedances. therefore, the subject of predicting thermal performance of soil and cable systems has been received increasing attension. for these problems, this paper describes a general formulation of impedance that is based on the effect of crossbonding and earthing of the sheath on the 66kV, 132kV and 220kV underground cable systems. also the work is presented, for calculating the temperature rise of power cable and soil.

  • PDF

Analysis of Sheath Induction Voltage for 154kV OF Underground Cable (154kV OF 지중케이블의 씨스 유도전압 해석)

  • Lee, H.G.;Kim, D.K.;Bae, J.H.;Ha, T.H.;Choi, S.B.;Jeong, S.H.
    • Proceedings of the KIEE Conference
    • /
    • 2000.11a
    • /
    • pp.156-158
    • /
    • 2000
  • As we are industrialized lately, power capacity is increased in the city urban areas. So the application of underground transmission line is largely expended. In this paper, we analysis the induction voltage on the sheath of 1,200[$mm^2$] OF underground cable being used 154kV underground transmission line. If the current on the cable conductor is 300[A], circulation current is induced the maximum 100[A] on the cable sheath.

  • PDF

A Study on Diagnosis of The Energized Status of 22.9kV Multigrounded Underground Power Cable (22.9kV 다중 접지 지중 전력 케이블의 가압 상태 진단에 관한 기초 연구)

  • Kim, Chang-Gyo;Hong, Jin-Su;Jeong, Yeong-Ho
    • The Transactions of the Korean Institute of Electrical Engineers C
    • /
    • v.48 no.10
    • /
    • pp.699-703
    • /
    • 1999
  • An experimental study to identify the energized status of the 22.9kV underground power cable by the detection of vibration has been performed. We have derived that there exists vibration at double the line frequency in live cables by electromagnetic force. The relative amplitudes of the cable vibration according to the energized status of the cable were calculated by computer simulation. The cable vibration can also be picked up by accelerometer. A prototype was tested on the underground distribution system in Chonan substation, KEPCO. Comparison between simulation results and field test results was performed. The results showed that the energized status of the calble can be identified by measuring the vibration of the cable using accelerometer.

  • PDF

The Cause of CCPU's failure and Improved Configuration Method in Combined Transmission Lines (실 계통의 혼합송전선로에서 CCPU파괴 원인과 그 대책)

  • Ha, C.W.;Kim, J.N.;Lee, S.K.;Heo, H.D.
    • Proceedings of the KIEE Conference
    • /
    • 2001.11b
    • /
    • pp.210-212
    • /
    • 2001
  • The protection of underground cables against transient overvoltages resulting from lightning and other causes is important in cable-tine which is connected with overhead line and underground cable. This paper investigates the failure of CCPU(Cable covering Protection Unit) and presents improved configuration method of CCPU in underground cable system EMTP(Electromagnetic Transient Program) is used in order to study the overvoltages and modeling of components of the system such as overhead lines, underground cables, CCPUs and towers in presented.

  • PDF

An Improvement of Optical Fiber Composite Power Cable On-Line Monitoring System for Underground Distribution Network (지중 배전계통 적용을 위한 광복합 케이블 실시간 감시시스템 개선)

  • Cho, Jin-Tae;Kim, Ju-Yong;Lee, Hak-Ju;Park, Jung-Sung
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.7
    • /
    • pp.77-83
    • /
    • 2012
  • Since power system is switching to smart grid, on-line monitoring technology has become necessary for underground distribution power cable. Therefore, the application of DTS(Distributed Temperature Sensing) technology using OFCPC(Optical Fiber Composite Power Cable) capable of monitoring underground distribution power cables has been developed. These can bring about reductions in faults and increases in operating capacity of underground distribution system. To date, the test-bed of optical fiber composite power cable on-line monitoring system has been constructed. Then, matters to be improved have been drawn through verification experiments. This paper presents the improvement and experiment results of the optical fiber composite power cable on-line monitoring system to apply to underground distribution lines in the field.