• 제목/요약/키워드: Two-stage hybrid flow shop

검색결과 5건 처리시간 0.023초

Hybrid Flow Shop with Parallel Machines at the First Stage and Dedicated Machines at the Second Stage

  • Yang, Jaehwan
    • Industrial Engineering and Management Systems
    • /
    • 제14권1호
    • /
    • pp.22-31
    • /
    • 2015
  • In this paper, a two-stage hybrid flow shop problem is considered. Specifically, there exist identical parallel machines at stage 1 and two dedicated machines at stage 2, and the objective of the problem is to minimize makespan. After being processed by any machine at stage 1, a job must be processed by a specific machine at stage 2 depending on the job type, and one type of jobs can have different processing times on each machine. First, we introduce the problem and establish complexity of several variations of the problem. For some special cases, we develop optimal polynomial time solution procedures. Then, we establish some simple lower bounds for the problem. In order to solve this NP-hard problem, three heuristics based on simple rules such as the Johnson's rule and the LPT (Longest Processing Time first) rule are developed. For each of the heuristics, we provide some theoretical analysis and find some worst case bound on relative error. Finally, we empirically evaluate the heuristics.

2단계 혼합흐름공정에서 납기 지연 작업수의 최소화를 위한 분지한계 알고리듬 (A Branch and Bound Algorithm for Two-Stage Hybrid Flow Shop Scheduling : Minimizing the Number of Tardy Jobs)

  • 최현선;이동호
    • 대한산업공학회지
    • /
    • 제33권2호
    • /
    • pp.213-220
    • /
    • 2007
  • This paper considers a two-stage hybrid flow shop scheduling problem for the objective of minimizing the number of tardy jobs. Each job is processed through the two production stages in stages, each of which has multiple identical parallel machines. The problem is to determine the allocation and sequence of jobs at each stage. A branch and bound algorithm that gives the optimal solutions is suggested that incorporates the methods to obtain the lower and upper bounds. Dominance properties are also suggested to reduce the search space. To show the performance of the algorithm, computational experiments are done on randomly generated problems, and the results are reported.

전용기계가 있는 혼합흐름공정의 생산 일정 계획 수립을 위한 2단계 접근법 (A Two-Stage Scheduling Approach on Hybrid Flow Shop with Dedicated Machine)

  • 김상래;강준규
    • 품질경영학회지
    • /
    • 제47권4호
    • /
    • pp.823-835
    • /
    • 2019
  • Purpose: This study deals with a production planning and scheduling problem to minimize the total weighted tardiness on hybrid flow shop with sets of non-identical parallel machines on stages, where parallel machines in the set are dedicated to perform specific subsets of jobs and sequence-dependent setup times are also considered. Methods: A two-stage approach, that applies MILP model in the 1st stage and dispatching rules in the 2nd stage, is proposed in this paper. The MILP model is used to assign jobs to a specific machine in order to equalize the workload of the machines at each stage, while new dispatching rules are proposed and applied to sequence jobs in the queue at each stage. Results: The proposed two-stage approach was implemented by using a commercial MILP solver and a commercial simulation software and a case study was developed based on the spark plug manufacturing process, which is an automotive component, and verified using the company's actual production history. The computational experiment shows that it can reduce the tardiness when used in conjunction with the dispatching rule. Conclusion: This proposed two-stage approach can be used for HFS systems with dedicated machines, which can be evaluated in terms of tardiness and makespan. The method is expected to be used for the aggregated production planning or shop floor-level production scheduling.

2 단계 혼합흐름공정에서의 일정계획문제에 관한 연구 (Two-Stage Hybrid Flow Shop Scheduling: Minimizing the Number of Tardy Jobs)

  • 최현선;이동호
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2006년도 춘계공동학술대회 논문집
    • /
    • pp.1133-1138
    • /
    • 2006
  • This paper considers a hybrid flow shop scheduling problem for the objective of minimizing the number of tardy jobs. The hybrid flow shop consists of two stages in series, each of which has multiple identical parallel machines, and the problem is to determine the allocation and sequence of jobs at each stage. A branch and bound algorithm that gives the optimal solutions is suggested that incorporates the methods to obtain the lower and upper bounds. Dominance properties are also derived to reduce the search space. To show the performance of the algorithm, computational experiments are done on randomly generated problems, and the results are reported.

  • PDF

2 단계 유연 흐름 생산에서 평균 완료 시간 최소화 문제 (Minimizing the total completion time in a two-stage flexible flow shop)

  • 윤석훈
    • 융합정보논문지
    • /
    • 제11권8호
    • /
    • pp.207-211
    • /
    • 2021
  • 이 논문은 단계 1에 기계 한 대, 단계 2에 2대의 병렬 기계가 있는 유연 흐름 생산 스케줄링 문제를 다룬다. 목적 함수는 평균 완료 시간을 최소화하는 것이다. 이 문제를 혼합 정수 2차 문제로 정식화하여 혼합 시뮬레이티드 어닐링을 이용하여 풀었다. 혼합 시뮬레이티드 어닐링은 유전자 알고리즘의 탐색 능력을 이용하고 시뮬레이티드 어닐링을 적용하여 너무 이른 수렴 현상을 줄이는 방법이다. 실험을 통하여 혼합 시뮬레이티드 어닐링의 성능을 평가하였다.