• Title/Summary/Keyword: Tunnel image

Search Result 246, Processing Time 0.029 seconds

A Study on Flame and Smoke Detection Method of a Tunnel Fire (터널 화재의 화염 및 연기 검출 기법 연구)

  • Lee, Jeong-Hun;Lee, Byoung-Moo;Han, Dong-Il
    • Proceedings of the IEEK Conference
    • /
    • 2008.06a
    • /
    • pp.1027-1028
    • /
    • 2008
  • In this paper, we proposed image-processing technique for automatic real-time fire and smoke detection in tunnel fire environment. To minimize false detection of fire in tunnel we used motion information of video sequence. And this makes it possible to detect exact position of event in early stage with detection, test, and verification procedures. In addition, by comparing false detection elimination results of each step, we have proved the validity and efficiency of proposed algorithm.

  • PDF

Effects of Rapid Thermal Anneal on the Magnetoresistive Properties of Magnetic Tunnel Junction

  • Lee, K.I.;Lee, J.H.;K. Rhie;J.G. Ha;K.H. Shin
    • Journal of Magnetics
    • /
    • v.6 no.4
    • /
    • pp.126-128
    • /
    • 2001
  • The effect of rapid thermal anneal (RTA) has been investigated on the properties of an FeMn exchange-biased magnetic tunnel junction (MTJ) using magnetoresistance and I-V measurements and transmission electron microscopy (TEM). The tunneling magnetoresistance (TMR) in an as-grown MTJ is found to be ∼27%, while the TMR in MTJs annealed by RTA increases with annealing temperature up to 300$\^{C}$, reaching ∼46%. A TEM image reveals a structural change in the interface of A1$_2$O$_3$layer for the MTJ annealed by RTA at 300$\^{C}$. The oxide barrier parameters are found to vary abruptly with annealing time within a few ten seconds. Our results demonstrate that the present RTA enhances the magnetoresistive properties of MTJs.

  • PDF

Wind Tunnel Test to Enhance Aerodynamic Characteristics of Forward Swept Wing Airplane (전진익형 항공기 공력특성 증진을 위한 풍동시험)

  • Chung, Jin-Deog;Lee, Jang-Yeon;Sung, Bong-Zoo;Lee, Jong-Won
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.28 no.7
    • /
    • pp.800-808
    • /
    • 2004
  • Wind tunnel test of an airplane model with forward swept wing was done in KARI LSWT to evaluate and measure the aerodynamic characteristics of initially designed configuration. Since the given wing planform did not fully satisfy the design requirements, local flow control devices such as vortilon, vortex generator and flow fence were used to delay separation and to enhance aerodynamic characteristics. Also decision making processes of design parameters such as vertical tail boom length, the location, size and the incidence angle of horizontal tail were discussed. The general aerodynamic characteristics of forward swept wing for various control surface deflection conditions of flap, aileron and elevator were also given.

Detection of the Cavity Behind the Tunnel Lining by Single Channel Seismic and GPR Method (GPR 및 단일채널 탄성파탐사에 의한 터널라이닝 배면공동 조사)

  • Shin, Sung-Ryul;Jo, Chul-Hyun;Shin, Chang-Soo;Yang, Seung-Jin;Jang, Won-Yil
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.2 no.4
    • /
    • pp.148-158
    • /
    • 1998
  • Determining the thickness if concrete lining and detecting of the cavity where is located behind tunnel lining plays an important role in the safety diagnosis of tunnel structure and the quality control. In this study, we made use of GPR and seismic method in order to find the cavity or flaw. Although GPR is very useful method in the concrete lining without rebar, it is difficult to detect the cavity in the reinforced concrete lining. We applied mini-seismic method to the reinforced concrete lining. The obtained seismic data was processed by means of seismic section in time domain and image section of power spectrum in frequency domain using Impact-Echo method as well. The proposed method can accurately show the location and depth of the cavity in the reinforced concrete lining.

  • PDF

Assessment of groundwater inflow rate into a tunnel considering groundwater level drawdown and permeability reduction with depth (터널굴착 중 지하수위 강하 및 깊이별 투수계수 변화를 적용한 지하수 유입량 변화 분석)

  • Moon, Joon-Shik;Zheng, An-Qi;Jang, Seoyong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.2
    • /
    • pp.109-120
    • /
    • 2017
  • Groundwater seepage into a tunnel is one of the main causes triggering tunnel collapse and the consequent ground subsidence. Thus, it is important to estimate adequately the groundwater inflow rate and porewater pressure change during tunneling with time elapse. In current practice, Goodman's analytical solution (or image tunnel method) assuming homogeneous ground condition around a tunnel is commonly used for estimating groundwater inflow rate. However, the generally-used analytical solution for estimating groundwater inflow rate does not consider groundwater level drawdown and permeability change with depth, and the inflow rate can be overestimated in design phase. In this study, parametric study was performed in order to investigate the effect of groundwater level drawdown and permeability reduction with depth, and transient flow analysis was carried out for studying the inflow rate change as well as groundwater level and porewater pressure change around a tunnel with time elapse.

Pseudoaneurysm of Ulnar Artery after Endoscopic Carpal Tunnel Release

  • Ryu, Sung-Joo;Kim, In-Soo
    • Journal of Korean Neurosurgical Society
    • /
    • v.48 no.4
    • /
    • pp.380-382
    • /
    • 2010
  • The authors present an extremely rare case of a pseudoaneurysm of the ulnar artery as a complication of a two-portal endoscopic carpal tunnel release (ECTR). A 70-year-old man with chronic renal failure and on maintenance hemodialysis with a left arteriovenous fistula presented with paresthesia of his right hand. A clinical diagnosis of right carpal tunnel syndrome was confirmed by ultrasonography and an electro physiologic study. He underwent two-portal ECTR, and the paresthesia was much improved. However, he presented to us one month after operation with severe pain, a tender mass distal to the right wrist crease and more aggravation of the paresthesia in the ulnar nerve distribution. Doppler ultrasound was performed and revealed a hypo echoic lesion 20 mm in diameter in the right palm, with arterial Doppler flow inside connected to the palmar segment of the ulnar artery. An ulnar artery pseudoaneurysm was diagnosed and treated by ultrasound-guided percutaneous thrombin injection. Transverse color Doppler ultrasound image showed complete thrombosis of the pseudoaneurysm and flow cessation after a total injection of 500 units of thrombin. The symptoms were also improved.

A Study on Flow Characteristics of Polluted Air in Rectangular Tunnel Models Using a PIV System

  • Koh, Young-Ha;Park, Sang-Kyoo;Yang, Hei-Cheon;Lee, Yong-Ho
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.34 no.6
    • /
    • pp.825-832
    • /
    • 2010
  • The objective of this study is to investigate flow behaviors of polluted air in order to prevent the impact of disaster in a tunnel. This paper presents the experimental results qualitatively in terms of flow characteristics in two kinds of rectangular tunnel models in which each distance from the centerline above the inlet vent to the exhaust vent is 0 and 60 mm, respectively. The olive oil is used as the tracer particles. The flow is tested at the flow rate of $14.16{\times}10^{-4}\;m^3/s$ and the inlet vent velocity of 1.1 m/s with the kinematic viscosity of air. The aspect ratio of the model test section is 10. The average velocity vectors, streamlines, and vorticity distributions are measured and analyzed by the Flow Manager in a particle image velocimetry(PIV) system. The PIV technology gives three different velocity distributions according to observational points of view for understanding the polluted air flow characteristics. The maximum value of mean velocity generally occurs in the inlet and outlet vent regions in the tunnel models.

3D Resistivity Survey at a Collapsed Tunnel Site (붕락 터널에서의 3차원 전기비저항 탐사)

  • Cho, In-Ky;Kim, Ki-Seog;Lee, Keun-Soo
    • Geophysics and Geophysical Exploration
    • /
    • v.18 no.1
    • /
    • pp.14-20
    • /
    • 2015
  • Three-dimensional (3D) resistivity method is an effective tool in the engineering site survey because it can provide a 3D resistivity distribution of the site. In this study, we tried to find out faults, fractures and coal seams that can cause the collapse of the tunnel. We carried out 2D resistivity survey along 5 parallel lines and 11 cross lines and merged all the apparent resistivity data for 3D inversion. Finally, from the 3D resistivity image and drilling data we presented the 3D distribution of faults, fractures and coal seams that are considered the main cause of the tunnel collapse.

Development of a deep-learning based tunnel incident detection system on CCTVs (딥러닝 기반 터널 영상유고감지 시스템 개발 연구)

  • Shin, Hyu-Soung;Lee, Kyu-Beom;Yim, Min-Jin;Kim, Dong-Gyou
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.6
    • /
    • pp.915-936
    • /
    • 2017
  • In this study, current status of Korean hazard mitigation guideline for tunnel operation is summarized. It shows that requirement for CCTV installation has been gradually stricted and needs for tunnel incident detection system in conjunction with the CCTV in tunnels have been highly increased. Despite of this, it is noticed that mathematical algorithm based incident detection system, which are commonly applied in current tunnel operation, show very low detectable rates by less than 50%. The putative major reasons seem to be (1) very weak intensity of illumination (2) dust in tunnel (3) low installation height of CCTV to about 3.5 m, etc. Therefore, an attempt in this study is made to develop an deep-learning based tunnel incident detection system, which is relatively insensitive to very poor visibility conditions. Its theoretical background is given and validating investigation are undertaken focused on the moving vehicles and person out of vehicle in tunnel, which are the official major objects to be detected. Two scenarios are set up: (1) training and prediction in the same tunnel (2) training in a tunnel and prediction in the other tunnel. From the both cases, targeted object detection in prediction mode are achieved to detectable rate to higher than 80% in case of similar time period between training and prediction but it shows a bit low detectable rate to 40% when the prediction times are far from the training time without further training taking place. However, it is believed that the AI based system would be enhanced in its predictability automatically as further training are followed with accumulated CCTV BigData without any revision or calibration of the incident detection system.

Deep Learning-based Object Detection of Panels Door Open in Underground Utility Tunnel (딥러닝 기반 지하공동구 제어반 문열림 인식)

  • Gyunghwan Kim;Jieun Kim;Woosug Jung
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.3
    • /
    • pp.665-672
    • /
    • 2023
  • Purpose: Underground utility tunnel is facility that is jointly house infrastructure such as electricity, water and gas in city, causing condensation problems due to lack of airflow. This paper aims to prevent electricity leakage fires caused by condensation by detecting whether the control panel door in the underground utility tunnel is open using a deep learning model. Method: YOLO, a deep learning object recognition model, is trained to recognize the opening and closing of the control panel door using video data taken by a robot patrolling the underground utility tunnel. To improve the recognition rate, image augmentation is used. Result: Among the image enhancement techniques, we compared the performance of the YOLO model trained using mosaic with that of the YOLO model without mosaic, and found that the mosaic technique performed better. The mAP for all classes were 0.994, which is high evaluation result. Conclusion: It was able to detect the control panel even when there were lights off or other objects in the underground cavity. This allows you to effectively manage the underground utility tunnel and prevent disasters.