• Title/Summary/Keyword: Tunnel image

Search Result 243, Processing Time 0.021 seconds

Development of Inspection System for Crack on the Lining of Concrete Tunnel (콘크리트 터널 라이닝 균열검사 시스템 개발에 관한 연구)

  • 고봉수;손영갑;신동익;김병화;한창수
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.10 no.1
    • /
    • pp.66-72
    • /
    • 2004
  • To assess tunnel safety, cracks in tunnel lining are measured by inspectors, who observe cracks with their naked eyes and record them. But manual inspection is slow, and measured crack data is subjective. Therefore, this study proposes inspection system fur measuring cracks in tunnel lining and providing objective crack data to be used in safety assessment. The system consists of On-vehicle system and Laboratory system. On-Vehicle system acquires image data with line CCD camera on scanning along the tunnel lining. Laboratory system extracts crack information from the acquired image using image processing. Measured crack information is crack thickness, length and orientation. To improve accuracy of crack recognition, the geometric properties and patterns of cracks in concrete structure were applied to image processing. The proposed system was verified with experiments in both laboratory environment and field environment such as subway tunnel.

A Study on the Delayed Factors in Evacuation Behavior in the Case of Fire Accidents in Highway Tunnels (고속도로 터널 내 화재사고 발생 시 대피행동 지연 요인에 관한 연구)

  • Jae-Hwan, Cho
    • Journal of the Korea Safety Management & Science
    • /
    • v.24 no.4
    • /
    • pp.143-148
    • /
    • 2022
  • This paper attempted to analyze the correlation between the risk image of the evacuees in the tunnel and the variables that affect the evacuation behavior due to the closed feeling. As to whether there is a difference in the level of recognizing the tunnel risk image according to the distribution of jobs, the null hypothesis was rejected at the significance probability of 0.002, so it can be said that the level of recognition of the tunnel risk image varies depending on the job group. In the distribution difference between gender and tunnel risk image recognition level, the significance probability was 0.012, indicating that the null hypothesis was rejected, indicating that the tunnel risk recognition distribution according to gender was different. As a result of analyzing the distribution difference between the tunnel's closed feeling and the tunnel risk perception level, the significance probability was 0.001, and the null hypothesis was rejected, indicating that there was a difference in the tunnel risk image level.

Distortion Correction of Boundary Lines in a Tunnel Image Captured by Fisheye Lens (어안렌즈 터널영상의 경계선 왜곡 보정)

  • Kim, Gi-Hong;Jeong, Soo
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.19 no.4
    • /
    • pp.55-63
    • /
    • 2011
  • Having a wide angle of view, a fisheye lens is useful for obtaining images of the inside wall of a tunnel. A circular fisheye tunnel image can be transformed into a familiar rectangular image by applying the concept of cylindrical projection. This projection transformation causes several types of distortions in the projected image. This paper discusses the distortion on the boundary lines between smoothly curved wall and flat ground. We analyzed the cause of this boundary distortion, developed transformation model, and derived a correction formular. A distortion correction software programmed in Visual C++ applied to projected image. Consequently, boundary-corrected image could be obtained. Research into other distortions of projected image will helpful in obtaining tunnel image that resembles real tunnel from fisheye tunnel image.

Image-Data-Acquisition and Data-Structuring Methods for Tunnel Structure Safety Inspection (터널 구조물 안전점검을 위한 이미지 데이터 취득 및 데이터 구조화 방법)

  • Sung, Hyun-Suk;Koh, Joon-Sub
    • Journal of the Korean Geotechnical Society
    • /
    • v.40 no.1
    • /
    • pp.15-28
    • /
    • 2024
  • This paper proposes a method to acquire image data inside tunnel structures and a method to structure the acquired image data. By improving the conditions by which image data are acquired inside the tunnel structure, high-quality image data can be obtained from area type tunnel scanning. To improve the data acquisition conditions, a longitudinal rail of the tunnel can be installed on the tunnel ceiling, and image data of the entire tunnel structure can be acquired by moving the installed rail. This study identified 0.5 mm cracked simulation lines under a distance condition of 20 m at resolutions of 3,840 × 2,160 and 720 × 480 pixels. In addition, the proposed image-data-structuring method could acquire image data in image tile units. Here, the image data of the tunnel can be structured by substituting the application factors (resolution of the acquired image and the tunnel size) into a relationship equation. In an experiment, the image data of a tunnel with a length of 1,000 m and a width of 20 m were obtained with a minimum overlap rate of 0.02% to 8.36% depending on resolution and precision, and the size of the local coordinate system was found to be (14 × 15) to (36 × 34) pixels.

Evaluation of failure mode of tunnel-type anchorage for a suspension bridge via scaled model tests and image processing

  • Seo, Seunghwan;Lim, Hyungsung;Chung, Moonkyung
    • Geomechanics and Engineering
    • /
    • v.24 no.5
    • /
    • pp.457-470
    • /
    • 2021
  • In this study, the pull-out behavior of a tunnel-type anchorage for suspension bridges was investigated using experimental tests and image processing analyses. The study focused on evaluating the initial failure behavior and failure mode of the tunnel-type anchorage. In order to evaluate the failure mode of tunnel-type anchorage, a series of scaled model tests were conducted based on the prototype anchorage of the Ulsan Grand Bridge. In the model tests, the anchorage body and surrounding rocks were fabricated using a gypsum mixture. The pull-out behavior was investigated under plane strain conditions. The results of the model tests demonstrate that the tunnel-type anchorage underwent a wedge-shaped failure. In addition, the failure mode changed according to the differences in the physical properties of the surrounding rock and the anchorage body and the size of the anchor plate. The size of the anchor plate was found to be an important parameter that determines the failure mode. However, the difference in physical properties between the surrounding rock and the anchorage body did not affect its size. In addition, this study analyzed the initial failure behavior of the tunnel-type anchorage through image analysis and confirmed that the failure was sequentially transferred from the inside of the tunnel to the surrounding rock according to the image analysis. The reasonable failure mode for the design of the tunnel-type anchorage should be wedge-type rather than pull-out type.

Method of Tunnel Incidents Detection Using Background Image (배경영상을 이용한 터널 유고 검지 방법)

  • Jeong, Sung-Hwan;Ju, Young-Ho;Lee, Jong-Tae;Lee, Joon-Whoan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.12
    • /
    • pp.6089-6097
    • /
    • 2012
  • This study suggested a method of detecting an incident inside tunnel by using camera that is installed within the tunnel. As for the proposed incident detection method, a static object, travel except vehicles, smoke, and contra-flow were detected by extracting the moving object through using the real-time background image differencing after receiving image from the camera, which is installed inside the tunnel. To detect the moving object within the tunnel, the positive background image was created by using the moving information of the object. The incident detection method was developed, which is strong in a change of lighting that occurs within the tunnel, and in influence of the external lighting that occurs in the entrance and exit of the tunnel. To examine the efficiency of the suggested method, the experimental images were acquired from Marae tunnel and Expo tunnel in Yeosu of Jeonnam and from Unam tunnel in Imsil of Jeonbuk. Number of images, which were used in experiment, included 20 cases for static object, 20 cases for travel except vehicles, 4 cases for smoke, and 10 cases for contra-flow. As for the detection rate, all of the static object, the travel except vehicles, and the contra-flow were detected in the experimental image. In case of smoke, 3 cases were detected. Thus, excellent performance could be confirmed. The proposed method is now under operation in Marae tunnel and Expo tunnel in Yeosu of Jeonnam and in Unam tunnel in Imsil of Jeonbuk. To examine accurate efficiency, the evaluation of performance is considered to be likely to be needed after acquiring the incident videos, which actually occur within tunnel.

Radar Image Analysis for Detection of Shape of Voids in or under Concrete Slabs (레이다 탐사에 의한 소공동의 단면형상 복원방법에 관한 연구)

  • 박석균
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1997.10a
    • /
    • pp.791-796
    • /
    • 1997
  • Deterioration of pavements or tunnels primarily from the existence of voids under the pavements or tunnel linings. To detect these voids effectively by non-destructive testes, a method using radar was proposed. In this research, the detection of shape of voids by radar image processing is investigate. The experiments and simulation were conducted to detect voids in or under concrete pavements for tunnel linings) with reinforcing bars. From the results, the fundamental algorithm for tracing the voids, improving the horizontal resolution of the object image and detecting shape of objects, was verified.

  • PDF

Development of Vision-Based Inspection System for Detecting Crack on the Lining of Concrete Tunnel (비젼센서를 이용한 콘크리트 터널 라이닝 균열검사 시스템의 개발)

  • 고봉수;조남규
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.20 no.12
    • /
    • pp.96-104
    • /
    • 2003
  • To assess tunnel safety, cracks in tunnel lining are measured by inspectors who observe cracks with their eyes. A manual inspection is, however, slow and subjective. This paper, therefore, proposes vision-based inspection system for measuring cracks in the tunnel lining that inspects cracks fast and objective. The system is consisted of an on-vehicle system and a lab system. An on-vehicle system acquires image data with line CCD camera. A lab system extracts crack then inform their thickness, length and orientation by using image processing. To improve accuracy of crack recognition the geometric properties of a crack was applied to image processing. The proposed system were verified with experiments in both laboratory and field environment.

Landscape Design for Renovation of the Second Namsan Tunnel (남산2호터널 조형물 설계)

  • 김신원
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.30 no.2
    • /
    • pp.63-69
    • /
    • 2002
  • The Second Namsan Tunnel required renovation. The landscape design was conducted as part of the comprehensive programs for renovation. The landscape design covered site analysis, design development, a working drawing and a maintenance plan. In May of 2001, the Second Namsan Tunnel was renovated and reopened to traffic. The tunnel was recreated as a new type of tunnel with function and beauty. The entrance and retaining wall of the tunnel has public character. Users are greatly affected by the entrance and retaining walls along roads. The landscape architect had to find new materials and methods to improve the environment and to combine artwork with the entrance and walls of the tunnel. The surface of the tunnel entrance and retaining walls are artistically treated with ceramic tiles and paint. Various regional characteristics and cultural meaning are symbolically expressed. Or the tunnel entrance from the Joong-gu side, entitled "Glory of the Future", the hibiscus symbolizes the bright and glorious future of Korea. On the retaining walls, entitled "Hope", the promising Joong-gu is symbolized through image of Korean magpies, mountains, rocks, roses, winds and nature. As for the tunnel entrance from the Yongsan-gu side, entitled "Vivid Spirit", pine trees symbolize the Koreans′strong will and an enterprising spirit. On the retaining walls, entitled "Lively Motions", Yongsan-gu is symbolized through image of pigeons, mountains, rocks, roses, winds and clear skys. The entrance and retaining wall of the Second Namsan Tunnel, whose surfaces are treated with tiles and paint with artistic value, would create an atmosphere using large-scale wall paintings. In this artwork, users would perceive a unique sense of place through the symbolic images of the vertical planes of the tunnel.

Non-contact mobile inspection system for tunnels: a review (터널의 비접촉 이동식 상태점검 장비: 리뷰)

  • Chulhee Lee;Donggyou Kim
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.3
    • /
    • pp.245-259
    • /
    • 2023
  • The purpose of this paper is to examine the most recent tunnel scanning systems to obtain insights for the development of non-contact mobile inspection system. Tunnel scanning systems are mostly being developed by adapting two main technologies, namely laser scanning and image scanning systems. Laser scanning system has the advantage of accurately recreating the geometric characteristics of tunnel linings from point cloud. On the other hand, image scanning system employs computer vision to effortlessly identify damage, such as fine cracks and leaks on the tunnel lining surface. The analysis suggests that image scanning system is more suitable for detecting damage on tunnel linings. A camera-based tunnel scanning system under development should include components such as lighting, data storage, power supply, and image-capturing controller synchronized with vehicle speed.